Housing violations · Williamsbridge-Olinville
764 East 213 Street, Bronx
10467 · 3 apartments · 3 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
21 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks61
- Other repairs33
- Peeling paint and plaster33
- No heat or hot water17
- Leaks and water damage17
- Lead paint13
- Plumbing, sinks and toilets8
- Mold7
- Missing smoke or CO detector5
- Roaches5
- Mice or rats4
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 63 closed · NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CPlumbing, sinks and toiletsRepair the broken or defective connection waste line pipe under wash basin in the bathroomIssued Jul 27, 2026 · fix by Aug 2, 2026 overdue · Violation #19094534
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartmentIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19094537
- BOther repairs& 309 m/d law abate the nuisance consisting of air condtioner installed in fire escape window in the 5th room from northIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19094536
- CBroken doors or locksProvide ready access to buildings heating system no access to boiler room locked door at 1st boiler room from north, 1st storyIssued Jul 15, 2026 · fix by Jul 21, 2026 overdue · Violation #19067396
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065690
- BOther repairs& 309 m/d law abate the nuisance consisting of a/c at fire escape window in the 3rd room from eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065692
- BPlumbing, sinks and toiletsRepair the broken or defective connection supply pipe at wasin basin in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065691
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 13, 2026 · fix by Jul 12, 2026 overdue · rent impairing · Violation #19065688
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door , 1st storyIssued Jul 13, 2026 · fix by Jul 19, 2026 overdue · Violation #19065694
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler room, 1st storyIssued Jul 13, 2026 · fix by Jul 19, 2026 overdue · Violation #19065689
- CLead paintProperly repair or replace the broken or defective latch and assembly at door ( leading to public hallway from vestibule) , 1st storyIssued Jul 8, 2026 · fix by Jul 14, 2026 overdue · Violation #19057156
- BLeaks and water damageRepair the roof so that it will not leak above the fire retardant ceiling at bulkhead 3rd sty at public hallIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · rent impairing · Violation #19050891
- COther repairsProperly repair with similar material the broken or defective the fire retardant ceiling at cellarIssued Jul 6, 2026 · fix by Jul 12, 2026 overdue · Violation #19050894
- BOther repairsProperly repair with similar material the broken or defective the fire retardant ceiling at bulkhead 3rd sty at public hallIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050892
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective dry rotted cabinet base at wash basin in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19046940
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective dry rotted wood cabinet base at sink in the kitchenIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19046941
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 6, 2026 · fix by Jul 3, 2026 overdue · rent impairing · Violation #19046942
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north at eastIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19046936
- COther repairsProvide ready access to buildings heating system at 1st boiler room from north, 1st storyIssued Jul 6, 2026 · fix by Jul 12, 2026 overdue · Violation #19046938
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19046939
- COther repairsProperly repair with similar material the broken or defective the fire retardant ceiling 2nd sty at public hallIssued Jul 6, 2026 · fix by Jul 12, 2026 overdue · Violation #19050889
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling at cellarIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050896
- CBroken doors or locksProvide ready access to buildings heating system door locked no access at boiler roomIssued Jun 29, 2026 · fix by Jul 5, 2026 overdue · Violation #19037654
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 29, 2026 · fix by Jun 29, 2026 overdue · rent impairing · Violation #19037653
- CBroken doors or locksProperly repair or replace the broken or defective building entrance door lock and assembly from vestibule at public hall, 1st storyIssued Jun 16, 2026 · fix by Jun 22, 2026 overdue · Violation #19006818
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jun 16, 2026 · fix by Jun 22, 2026 overdue · Violation #19006817
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 16, 2026 · fix by Jun 16, 2026 overdue · rent impairing · Violation #19006816
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 15, 2026 · fix by Jun 15, 2026 overdue · rent impairing · Violation #19006047
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 15, 2026 · fix by Jun 12, 2026 overdue · rent impairing · Violation #19000143
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 15, 2026 · fix by Jul 9, 2026 overdue · Violation #19011036
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Jun 15, 2026 · fix by Jul 9, 2026 overdue · Violation #19011035
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 15, 2026 · fix by Jul 9, 2026 overdue · Violation #19011034
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 15, 2026 · fix by Jul 9, 2026 overdue · Violation #19011033
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jun 15, 2026 · fix by Jun 21, 2026 overdue · Violation #19000146
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19000144
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north at westIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19006043
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchenIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19006044
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchenIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19006046
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st storyIssued Jun 15, 2026 · fix by Jun 29, 2026 overdue · Violation #19006218
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building vestibule door , 1st storyIssued Jun 15, 2026 · fix by Jun 29, 2026 overdue · Violation #19006219
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jun 15, 2026 · fix by Jun 21, 2026 overdue · Violation #19006048
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jun 4, 2026 · fix by Jun 10, 2026 overdue · Violation #18979380
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 4, 2026 · fix by Jun 4, 2026 overdue · rent impairing · Violation #18979379
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures all fixtures at bathroom and kitchen in the entire apartmentIssued Jun 3, 2026 · fix by Jun 9, 2026 overdue · rent impairing · Violation #18972877
- BBroken doors or locksProperly repair or replace the broken or defective building entrance door lock and assembly from vestbule. at public hall, 1st storyIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18942433
- BOther repairsProperly repair or replace the broken or defective vinyl floor tiles missing and lifting at public hall, 1st storyIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18942432
- BBroken doors or locksProperly repair or replace the broken or defective lock at building entrance door at public hall, 1st storyIssued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18786930
- BOther repairsProperly secure the loose lower hinge at gate at passageway at eastIssued Apr 16, 2026 · fix by May 21, 2026 overdue · Violation #18793117
- CBroken doors or locksProvide ready access to buildings heating system door locked at 1st boiler room from northIssued Feb 12, 2026 · fix by Feb 18, 2026 overdue · Violation #18636618
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 12, 2026 · fix by Feb 12, 2026 overdue · rent impairing · Violation #18636616
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Dec 30, 2025 · fix by Jan 5, 2026 overdue · Violation #18538371
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Dec 30, 2025 · fix by Jan 5, 2026 overdue · Violation #18538370
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 30, 2025 · fix by Dec 30, 2025 overdue · rent impairing · Violation #18538372
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Dec 29, 2025 · fix by Feb 2, 2026 overdue · Violation #18537528
- BOther repairsProperly repair with similar material the broken or defective vertical cracking (brick and mortar) at north exterior wallIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18531187
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 26, 2025 · fix by Dec 26, 2025 overdue · rent impairing · Violation #18531186
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 23, 2025 · fix by Dec 23, 2025 overdue · rent impairing · Violation #18524446
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Dec 23, 2025 · fix by Dec 29, 2025 overdue · Violation #18524447
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 23, 2025 · fix by Dec 23, 2025 overdue · rent impairing · Violation #18524445
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling at public hall, 3rd story original violation 18106181 issued…Issued Nov 21, 2025 · fix by Dec 26, 2025 overdue · Violation #18430154
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.