Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Kew Gardens

118-65 Metropolitan Avenue, Queens

11415 · 53 apartments · 4 stories · City Council district 29

By · Updated · Data from NYC HPD

C
48open immediately hazardous violations · 91 per 100 apartments
B35Hazardous, open
A18Non-hazardous, open
!88Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyLA FRANCE LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Roaches
    21
  2. Peeling paint and plaster
    18
  3. Mice or rats
    16
  4. Other repairs
    13
  5. Broken doors or locks
    9
  6. Leaks and water damage
    8
  7. Missing smoke or CO detector
    6
  8. Lead paint
    5
  9. Electrical problems
    2
  10. Mold
    2
  11. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C98 days
from 159 closed · NYC typical: 87 days
B116 days
from 258 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at south wall at public hall, 1st story, section ''west''Issued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347052
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinge at door to north yard at public hall, 1st story, section ''west''Issued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19347053
  • B
    Broken doors or locksRefit door in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19291465
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19291464
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19291463
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277799
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277793
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277800
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277789
  • B
    Other repairsProperly repair or replace the broken or defective vinyl floor tiles in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277792
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinge at door in the entranceIssued Oct 7, 2026 · fix by Oct 21, 2026 overdue · Violation #19277796
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2026 · fix by Nov 2, 2026 overdue · Violation #19277791
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 7, 2026 · fix by Nov 2, 2026 overdue · Violation #19277790
  • B
    Broken doors or locksProperly repair or replace the broken or defective marble saddle at entrance door in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277795
  • B
    Other repairsReplace with new the missing eschutchen plate at heat riser at ceiling in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277794
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of household item obstructing egress to the secondary egress apartment entrance door in the 1st private hallwayIssued Sep 16, 2026 · fix by Sep 22, 2026 overdue · Violation #19214597
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 16, 2026 · fix by Oct 12, 2026 overdue · Violation #19214583
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19214615
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19214606
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19214605
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214604
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and west wall in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214603
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214602
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and east wall in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214601
  • B
    Leaks and water damageRepair the roof so that it will not leak ceiling and north wall at public hall, 4th storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · rent impairing · Violation #19214642
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19214627
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 4th storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214640
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18994438
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 30, 2026 · fix by May 26, 2026 overdue · Violation #18824751
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 30, 2026 · fix by May 26, 2026 overdue · Violation #18824750
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 8, 2026 · fix by Feb 3, 2026 overdue · Violation #18553697
  • B
    Other repairsProperly repair or replace the broken or defective intercom system at the east wall in the foyerIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443044
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures light fixture at the ceiling in the foyerIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443045
  • B
    Leaks and water damageRepair the roof so that it will not leak ceiling in the kitchenIssued Oct 24, 2025 · fix by Nov 28, 2025 overdue · rent impairing · Violation #18323671
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the 1st room from northIssued Oct 24, 2025 · fix by Nov 28, 2025 overdue · Violation #18323676
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at westIssued Oct 24, 2025 · fix by Nov 28, 2025 overdue · Violation #18323901
  • C
    Other repairsProperly repair or replace the broken or defective upper window sash glass pane at west wall in the foyerIssued Oct 24, 2025 · fix by Oct 30, 2025 overdue · Violation #18323905
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 24, 2025 · fix by Nov 19, 2025 overdue · Violation #18323852
  • B
    Other repairsProperly repair or replace the broken or defective mail receptaclesIssued Oct 3, 2025 · fix by Nov 7, 2025 overdue · Violation #18262705
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 1, 2025 · fix by Oct 27, 2025 overdue · Violation #18262523
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 1, 2025 · fix by Nov 5, 2025 overdue · Violation #18262525
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 1, 2025 · fix by Oct 27, 2025 overdue · Violation #18262524
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 11, 2025 · fix by Sep 6, 2025 overdue · Violation #18148010
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 20, 2025 · fix by Jul 16, 2025 overdue · Violation #18044624
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Apr 24, 2025 · fix by May 29, 2025 overdue · Violation #17847240
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 16, 2024 · fix by Oct 12, 2024 overdue · Violation #17269103
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 16, 2024 · fix by Oct 12, 2024 overdue · Violation #17269102
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2024 · fix by Sep 2, 2024 overdue · Violation #17169341
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17150548
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17150547
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17150546
  • B
    Leaks and water damageRepair the leaky and/or defective faucets bathtub in the bathroomIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17150539
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at secondary means of egress door to 3rd story public hall in the kitchenIssued Jul 29, 2024 · fix by Aug 12, 2024 overdue · Violation #17150549
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 11, 2024 · fix by Aug 6, 2024 overdue · Violation #17106603
  • B
    Other repairsProperly repair with similar material the broken or defective marble saddle in the 2nd bathroom from northIssued Jun 3, 2024 · fix by Jul 8, 2024 overdue · Violation #17018015
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 15, 2024 · fix by Feb 10, 2024 overdue · Violation #16592288
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Oct 2, 2023 · fix by Oct 26, 2023 overdue · Violation #16265491
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 29, 2023 · fix by Oct 23, 2023 overdue · Violation #16264847
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 29, 2023 · fix by Oct 23, 2023 overdue · Violation #16264846
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wall in the bathroomIssued Sep 19, 2023 · fix by Oct 24, 2023 overdue · Violation #16240943

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

202017
192018
302019
252020
492021
752022
3062023
1432024
1132025
532026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 913 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.