Housing violations · Kew Gardens
122-04 Metropolitan Avenue, Queens
11415 · 44 apartments · 6 stories · City Council district 29
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
2 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster17
- Other repairs7
- Leaks and water damage4
- Broken doors or locks3
- Roaches3
- Plumbing, sinks and toilets2
- Mold1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 10 closed · NYC typical: 84 days
from 7 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at compactor closet door at public hall, 4th storyNotice not sent yet · inspected Nov 13, 2026 · Violation #19374529
- BBroken doors or locksProperly repair or replace the broken or defective closet door at north wall in the foyerNotice not sent yet · inspected Nov 13, 2026 · Violation #19374528
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from northNotice not sent yet · inspected Nov 13, 2026 · Violation #19374524
- BOther repairsRemove all encumbrances consisting of flower pots basement at public hallNotice not sent yet · inspected Nov 13, 2026 · rent impairing · Violation #19374530
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallwayNotice not sent yet · inspected Nov 13, 2026 · Violation #19374523
- CRoachesAbate the infestation consisting of roaches in the entire apartmentNotice not sent yet · inspected Nov 13, 2026 · Violation #19374525
- BOther repairsProperly repair or replace the broken or defective mechanical vent at south wall in the bathroomNotice not sent yet · inspected Nov 13, 2026 · Violation #19374526
- BOther repairsProperly repair or replace the broken or defective upper and lower gasket seal at refrigerator in the kitchenNotice not sent yet · inspected Nov 13, 2026 · Violation #19374527
- BOther repairsProperly repair or replace the broken or defective mechanical vent at south wall in the 1st bathroom from northIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19004917
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the private hallwayIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849769
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective trip lever at bathtub in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849777
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from north at eastIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849780
- BMoldTrace and repair the source and abate the visible mold condition at north wall approximately 6 sq ft. in the bathroomIssued Aug 2, 2023 · fix by Sep 6, 2023 overdue · Violation #16144215
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at wasteline at bathtub in the 1st bathroom from northIssued Nov 23, 2022 · fix by Dec 28, 2022 overdue · rent impairing · Violation #15558256
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 23, 2022 · fix by Dec 19, 2022 overdue · Violation #15558260
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 23, 2022 · fix by Dec 28, 2022 overdue · Violation #15558259
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchenIssued May 31, 2022 · fix by Jul 5, 2022 overdue · Violation #15176547
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from eastIssued May 31, 2022 · fix by Jul 5, 2022 overdue · Violation #15176546
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 31, 2022 · fix by Jun 26, 2022 overdue · Violation #15176548
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the entire apartmentIssued Dec 16, 2021 · fix by Jan 20, 2022 overdue · Violation #14730212
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Dec 16, 2021 · fix by Jan 20, 2022 overdue · Violation #14730211
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Dec 16, 2021 · fix by Jan 20, 2022 overdue · Violation #14730218
- BOther repairsProperly repair the broken or defective light fixture at ceiling at closet in the private hallwayIssued Dec 16, 2021 · fix by Jan 20, 2022 overdue · Violation #14730222
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at southIssued Oct 15, 2021 · fix by Nov 19, 2021 overdue · Violation #14614789
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Oct 15, 2021 · fix by Nov 19, 2021 overdue · Violation #14614790
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd bathroom from east at southIssued Jul 8, 2021 · fix by Aug 12, 2021 overdue · Violation #14408619
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 3rd bathroom from east at southIssued Jul 8, 2021 · fix by Aug 12, 2021 overdue · Violation #14408618
- BElectrical problemsProperly repair the broken or defective electrical outlet at the east wall in the bathroomIssued May 13, 2021 · fix by Jun 17, 2021 overdue · Violation #14332918
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 2:18 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.