Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Far Rockaway-Bayswater

14-10 New Haven Avenue, Queens

11691 · 149 apartments · 6 stories · City Council district 31

By · Updated · Data from NYC HPD

C
15open immediately hazardous violations · 10 per 100 apartments
B32Hazardous, open
A12Non-hazardous, open
!33Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyOCEANVIEW HEYSON LP
Landlord (head officer or owner)Ilsoo Kim

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    17
  2. Leaks and water damage
    10
  3. Roaches
    10
  4. Other repairs
    8
  5. Mold
    5
  6. Broken doors or locks
    3
  7. Mice or rats
    2
  8. Missing window guards
    2
  9. Plumbing, sinks and toilets
    1
  10. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C87 days
from 173 closed · NYC typical: 87 days
B112 days
from 312 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 square feet but less than 30 square feet observed at ceiling and east wall in…Issued Nov 16, 2026 · Violation #19372844
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroomIssued Nov 16, 2026 · Violation #19372845
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 2nd room from eastIssued Nov 16, 2026 · Violation #19372836
  • C
    Mice or ratsAbate the infestation consisting of mice at compactor closet, 1st story, section ''l100-l110'', at westIssued Nov 16, 2026 · Violation #19372846
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from eastIssued Nov 16, 2026 · Violation #19372835
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 4th room from eastIssued Nov 16, 2026 · Violation #19372840
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Nov 16, 2026 · Violation #19372839
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the 4th room from eastIssued Nov 16, 2026 · Violation #19372842
  • B
    Other repairsRefit lower window sashs at south 2 window in the 4th room from eastIssued Nov 16, 2026 · Violation #19372843
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroomIssued Nov 16, 2026 · Violation #19372841
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 16, 2026 · Violation #19372838
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 16, 2026 · Violation #19372837
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19354733
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19354732
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19354731
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroomIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19354730
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341907
  • B
    Other repairsProperly repair or replace the broken or defective ventilation system at west wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341906
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and west wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341905
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19341909
  • C
    RoachesAbate the infestation consisting of roaches at public hall, 3rd story, section ''right'', at eastIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19265262
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroomIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265257
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiling and east wall in the bathroomIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265258
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265259
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from eastIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265260
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 4th room from eastIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265261
  • C
    RoachesAbate the infestation consisting of roaches at compactor closet, 1st story, section ''right'', at eastIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19265263
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19231985
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19231986
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 26, 2026 · fix by Sep 21, 2026 overdue · Violation #19166019
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 3rd room from northIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19165975
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 25, 2026 · fix by Sep 20, 2026 overdue · Violation #19165994
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak east wall in the 3rd room from northIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19165974
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 25, 2026 · fix by Sep 20, 2026 overdue · Violation #19165976
  • B
    Broken doors or locksProperly repair or replace the broken or defective stair a fire door latch at public hall, 1st story, section ''north''Issued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166063
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures at sink in the kitchenIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · rent impairing · Violation #19165999
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19165978
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the 2nd room from northIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19151708
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the 1st room from northIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19151707
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 29, 2026 · fix by Jun 24, 2026 overdue · Violation #18964166
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tile behind water closet in the 2nd bathroom from northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18725670
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 17, 2025 · fix by Oct 13, 2025 overdue · Violation #18237220
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 30, 2025 · fix by Jul 26, 2025 overdue · Violation #18063234
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor. in the 1st room from northIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17819682
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 9, 2023 · fix by Feb 4, 2023 overdue · Violation #15649853
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the bathroomIssued May 27, 2022 · fix by Jul 1, 2022 overdue · Violation #15182907
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued May 27, 2022 · fix by Jul 1, 2022 overdue · Violation #15182908

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

102017
172018
502019
212020
532021
1722022
3492023
1052024
1422025
902026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,322 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.