Housing violations · Flushing-Willets Point
132-57 Sanford Avenue, Queens
11355 · 126 apartments · 6 stories · City Council district 20
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster26
- Leaks and water damage14
- Plumbing, sinks and toilets10
- Roaches8
- Mold7
- Other repairs7
- Broken doors or locks5
- Mice or rats4
- Missing window guards3
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 47 closed · NYC typical: 87 days
from 50 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19320259
- BBroken doors or locksProperly repair or replace the broken or defective latch at vestibule door to public hall , 1st story, section ''132-48''Issued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19309052
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule door to public hall , 1st story, section ''132-48''Issued Oct 16, 2026 · fix by Oct 30, 2026 overdue · Violation #19309051
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 16, 2026 · fix by Nov 11, 2026 overdue · Violation #19309050
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the kitchenIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19309048
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19309049
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall and cieling in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150441
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at cieling and westwall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150442
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west and cieling in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150443
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19150439
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall and cieling in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150440
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133172
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133180
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133185
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 square feet and less then 30 square feet observed at ceiling, south and east…Issued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133179
- BBroken doors or locksProperly secure the loose knob at door in the entranceIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133178
- BOther repairsProperly repair with similar material the broken or defective marble saddle at entrance in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133177
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelian enamel glaze at bathtub in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133184
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133181
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · rent impairing · Violation #19133186
- BOther repairsProperly secure the loose ceramic wall tiles at west and south wall in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133170
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelian enamel glaze at bathtub in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133171
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133173
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133174
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base cabinet at wash basin in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133175
- BOther repairsProperly repair with similar material the broken or defective marble saddle at entrance in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19133176
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 9, 2025 · fix by Jan 4, 2026 overdue · Violation #18492066
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 5, 2025 · fix by Nov 4, 2025 overdue · rent impairing · Violation #18342457
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 27, 2025 · fix by Jun 22, 2025 overdue · Violation #17916675
- CMice or ratsAbate the infestation consisting of mice at compactor closet, 2nd storyIssued May 27, 2025 · fix by Jun 22, 2025 overdue · Violation #17916677
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze enamel at bathtub in the bathroomIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17916673
- CMice or ratsAbate the infestation consisting of mice at compactor closet, 1st storyIssued May 27, 2025 · fix by Jun 22, 2025 overdue · Violation #17916676
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17816611
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the bathroomIssued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17816612
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17803093
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17803094
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17803095
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroomIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17803096
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17803098
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17803099
- BOther repairsProperly repair with similar material the broken or defective grout at south, east, and north ceramic wall tiles in the bathroomIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17803100
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 13, 2025 · fix by Apr 8, 2025 overdue · Violation #17754726
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Jan 22, 2025 · fix by Feb 26, 2025 overdue · Violation #17646713
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and east wall in the bathroomIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17609959
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling east west and south walls in the bathroomIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17609960
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the kitchenIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17609961
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17609962
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq feet at ceiling and east wall in the bathroomIssued Dec 3, 2024 · fix by Jan 7, 2025 overdue · Violation #17512887
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · Violation #17162521
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · Violation #17162519
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · Violation #17162520
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Jul 8, 2024 · fix by Aug 12, 2024 overdue · Violation #17105685
- BMoldTrace and repair the source and abate the visible mold condition approx 4 sq ft north wall in the bathroomIssued Jan 5, 2024 · fix by Feb 9, 2024 overdue · Violation #16574410
- CMoldTrace and repair the source and abate the visible mold condition approx 30 sq ft at ceiling and north in the bathroomIssued Dec 14, 2023 · fix by Jan 9, 2024 overdue · Violation #16515502
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at westIssued Dec 13, 2023 · fix by Jan 17, 2024 overdue · Violation #16515503
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at eastIssued Dec 13, 2023 · fix by Jan 17, 2024 overdue · Violation #16515506
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at 1st door from east at south wall in the 2nd room from north at westIssued Dec 13, 2023 · fix by Jan 17, 2024 overdue · Violation #16515504
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Dec 13, 2023 · fix by Jan 17, 2024 overdue · Violation #16515505
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Dec 13, 2023 · fix by Jan 8, 2024 overdue · Violation #16515507
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 23, 2023 · fix by Nov 18, 2023 overdue · Violation #16324481
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.