Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Williamsbridge-Olinville

624 East 222 Street, Bronx

10467 · 42 apartments · 6 stories · City Council district 12

By · Updated · Data from NYC HPD

C
6open immediately hazardous violations · 14 per 100 apartments
B8Hazardous, open
A11Non-hazardous, open
!21Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

Open in Google Maps ↗

Who owns and manages it

Owning company624 EAST 222 JV LLC
Landlord (head officer or owner)Moshe Piller

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    8
  2. Peeling paint and plaster
    7
  3. Mold
    4
  4. Roaches
    3
  5. Plumbing, sinks and toilets
    1
  6. Leaks and water damage
    1
  7. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 113 closed · NYC typical: 84 days
B109 days
from 163 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective by method of porceline enamel finish at by reglazing the bathtub in the bathroomNotice not sent yet · inspected Nov 13, 2026 · Violation #19374187
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentNotice not sent yet · inspected Nov 13, 2026 · Violation #19374186
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19143226
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19143227
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at ceiling in the bathroomIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19079251
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at south wall in the bathroomIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19079250
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18991671
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st storyIssued May 21, 2026 · fix by Jun 25, 2026 overdue · Violation #18942894
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard(rear)Issued Jun 20, 2025 · fix by Jul 25, 2025 overdue · Violation #18039682
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 26, 2024 · fix by Sep 21, 2024 overdue · Violation #17220337
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Mar 13, 2024 · fix by Mar 19, 2024 overdue · Violation #16741155
  • B
    Other repairsM/d law post a printed scale floor plan showing means of egress, at 6th story public hallwayIssued Mar 8, 2024 · fix by Apr 12, 2024 overdue · Violation #16733216
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 11, 2023 · fix by Jun 6, 2023 overdue · Violation #15967355
  • C
    Other repairsProperly repair with similar material the broken or defective jagged ceramic tile at north wall in bathroom (approx., 3 sq.ft.) in the bathroomIssued Sep 17, 2018 · fix by Sep 25, 2018 overdue · Violation #12580495

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

622018
342019
482020
882021
772022
1032023
1352024
712025
402026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 900 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.