Housing violations · Elmhurst
86-34 St James Avenue, Queens
11373 · 17 apartments · 4 stories · City Council district 25
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint8
- Peeling paint and plaster7
- Other repairs5
- Broken doors or locks3
- Missing smoke or CO detector3
- Mold1
- Leaks and water damage1
- Electrical problems1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 6 closed · NYC typical: 87 days
from 6 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 13, 2025 · fix by Dec 7, 2025 overdue · Violation #18372356
- COther repairsProperly repair with similar material the broken or defective ceramic tiles floor at public hall, 3rd storyIssued Jan 31, 2024 · fix by Feb 6, 2024 overdue · Violation #16634059
- BOther repairsProperly repair or replace the broken or defective hinges in the entranceIssued Jan 25, 2024 · fix by Feb 29, 2024 overdue · Violation #16623211
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the private hallwayIssued Jan 24, 2024 · fix by Feb 28, 2024 overdue · Violation #16615264
- BMoldTrace and repair the source and abate the visible mold condition approximate 20 sq.ft mold at ceiling in the bathroomIssued Jan 24, 2024 · fix by Feb 28, 2024 overdue · Violation #16615260
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 24, 2024 · fix by Feb 28, 2024 overdue · Violation #16615261
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from eastIssued Jan 24, 2024 · fix by Feb 28, 2024 overdue · Violation #16615262
- COther repairsProperly repair the broken or defective counter balance of lower sash of east window in the 1st room from north at eastIssued Jul 19, 2021 · fix by Jul 25, 2021 overdue · Violation #14411431
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective entrance in the entire apartmentIssued Jul 19, 2021 · fix by Aug 14, 2021 overdue · Violation #14411430
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Aug 2, 2018 · fix by Sep 6, 2018 overdue · Violation #12506758
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Aug 2, 2018 · fix by Sep 6, 2018 overdue · Violation #12506761
- BBroken doors or locksD26-10.01, 10.05 adm code arrange and make self-closing the doors entrance 4 styIssued Aug 13, 2008 · fix by Sep 17, 2008 overdue · Violation #315055
- BElectrical problems& 309 m/d law abate the nuisance consisting of exposed electric wires ceiling bathroom 4 styIssued Aug 13, 2008 · fix by Sep 17, 2008 overdue · Violation #315057
- BBroken doors or locksD26-10.01, 10.05 adm code arrange and make self-closing the doors entrance 4 sty southeastIssued Aug 13, 2008 · fix by Sep 17, 2008 overdue · Violation #315054
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 8, 2005 · fix by Apr 3, 2005 overdue · Violation #5389425
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 19, 2005 · fix by Feb 14, 2005 overdue · Violation #5296870
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor at public hall, 3rd storyIssued Dec 16, 2004 · fix by Jan 25, 2005 overdue · Violation #5250125
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Dec 9, 2004 · fix by Jan 18, 2005 overdue · Violation #5239203
- BRoachesAbate the nuisance consisting of vermin roaches. in the entire apartmentIssued Jun 18, 2004 · fix by Jul 28, 2004 overdue · Violation #4999024
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall private hall closet at 3 styIssued Sep 24, 2003 · fix by Oct 5, 2003 overdue · Violation #315060
- BOther repairsReplace with new the missing wall tile bathroom at 3 styIssued Sep 24, 2003 · fix by Nov 3, 2003 overdue · Violation #315061
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls ceiling 3 sty southIssued Sep 24, 2003 · fix by Nov 3, 2003 overdue · Violation #315062
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling of front north and south room 4 styIssued Sep 24, 2003 · fix by Nov 3, 2003 overdue · Violation #315097
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint steam riser at kitchen of 1 sty northeastIssued Jun 11, 1996 · fix by Jul 1, 1996 overdue · Violation #315093
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint and or plaster ceiling of south room of 1 sty northeastIssued Jun 11, 1996 · fix by Jul 1, 1996 overdue · Violation #315090
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint and or plaster ceiling and walls of bathroom of 1 sty northeastIssued Jun 11, 1996 · fix by Jul 1, 1996 overdue · Violation #315092
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint entrance door to 1 sty northeastIssued Jun 11, 1996 · fix by Jul 1, 1996 overdue · Violation #315094
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint and or plaster ceiling of kitchen of 1 sty northeastIssued Jun 11, 1996 · fix by Jul 1, 1996 overdue · Violation #315091
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.