Housing violations · Washington Heights (North)
51 Bennett Avenue, Manhattan
10033 · 48 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster12
- Other repairs10
- Mice or rats9
- Broken doors or locks5
- Leaks and water damage3
- Mold2
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 61 closed · NYC typical: 87 days
from 66 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19306805
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304934
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304933
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304932
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19304936
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304935
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19306806
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 2, 2026 · fix by Jul 28, 2026 overdue · Violation #19045554
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18257567
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 12, 2025 · fix by Jul 8, 2025 overdue · Violation #17941987
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 31, 2025 · fix by Apr 26, 2025 overdue · Violation #17795047
- BOther repairsProperly repair with similar material the broken or defective wood window frame in the 3rd room from northIssued Jun 10, 2024 · fix by Jul 15, 2024 overdue · Violation #17033323
- BOther repairsProperly repair or replace the broken or defective wood window frame at west wall in the 4th room from northIssued Jun 10, 2024 · fix by Jul 15, 2024 overdue · Violation #17033347
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Jun 10, 2024 · fix by Jul 15, 2024 overdue · Violation #17033345
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 12, 2024 · fix by Apr 7, 2024 overdue · Violation #16739163
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 30, 2023 · fix by Nov 25, 2023 overdue · Violation #16339275
- BOther repairsProperly repair with similar material the broken or defective vinly floor tiles throughout in the entire apartmentIssued Sep 1, 2023 · fix by Oct 6, 2023 overdue · Violation #16201798
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Sep 1, 2023 · fix by Oct 6, 2023 overdue · Violation #16201765
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, all wall and trim throughout in the entire apartmentIssued Sep 1, 2023 · fix by Oct 6, 2023 overdue · Violation #16201788
- BOther repairsProperly repair with similar material the broken or defective cement subfloor in the bathroomIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · Violation #16044849
- BBroken doors or locksProperly repair or replace the broken or defective latch set at 1st firedoor from north at public hall, 4th story, section at southIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · Violation #16044876
- BBroken doors or locksProperly repair or replace the broken or defective latch set at 1st firedoor from north at public hall, 3rd story, section at southIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · Violation #16044872
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · Violation #16044850
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from eastIssued May 25, 2023 · fix by Jun 29, 2023 overdue · Violation #15997149
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued May 25, 2023 · fix by Jun 29, 2023 overdue · Violation #15997148
- CMoldTrace and repair the source and abate the visible mold condition approx 12 sq.ft at ceiling and south wall in the bathroomIssued May 18, 2023 · fix by Jun 13, 2023 overdue · Violation #15994509
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 9, 2023 · fix by Apr 4, 2023 overdue · Violation #15758263
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 15, 2022 · fix by Jul 11, 2022 overdue · Violation #15204756
- BMoldTrace and repair the source and abate the visible mold condition 7 sq ft at south wall and 6 sq ft at ceiling in the bathroomIssued Jun 15, 2022 · fix by Jul 20, 2022 overdue · Violation #15204760
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Jun 15, 2022 · fix by Jul 11, 2022 overdue · Violation #15204759
- BOther repairsProperly repair with similar material the broken or defective wood flooring in the 4th room from eastIssued Jun 6, 2022 · fix by Jul 11, 2022 overdue · Violation #15199735
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 6, 2021 · fix by Nov 1, 2021 overdue · Violation #14607667
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at east wall at public hall, 4th story, section ''south''Issued Oct 6, 2021 · fix by Nov 10, 2021 overdue · Violation #14607664
- BOther repairsProperly repair the broken or defective `wall cabinets in the kitchenIssued Jul 29, 2016 · fix by Sep 2, 2016 overdue · Violation #11325912
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.