Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Williamsbridge-Olinville

666 East 224 Street, Bronx

10466 · 47 apartments · 5 stories · City Council district 12

By · Updated · Data from NYC HPD

C
37open immediately hazardous violations · 79 per 100 apartments
B19Hazardous, open
A3Non-hazardous, open
!54Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company666 HOLDING LLC
Landlord (head officer or owner)Shimon Greisman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Roaches
    11
  2. Other repairs
    10
  3. Lead paint
    10
  4. Broken doors or locks
    7
  5. Mice or rats
    6
  6. Missing smoke or CO detector
    4
  7. Peeling paint and plaster
    3
  8. No heat or hot water
    3
  9. Leaks and water damage
    2
  10. Plumbing, sinks and toilets
    2
  11. Mold
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C51 days
from 22 closed · NYC typical: 87 days
B84 days
from 51 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19291514
  • C
    Other repairsProperly repair or replace the broken or defective lower sash (loose) at 1st window from west at north wall in the 1st room from northIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19291510
  • C
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash at east wall window in the kitchenIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19291509
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19291515
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19291513
  • B
    Other repairsProperly repair or replace the broken or defective knob at radiator shut off valve in the 1st room from northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19291512
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of broken vinyl floor tiles creating a trip hazard in the 1st room from northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19291511
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19291507
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19291508
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelan enamel finish by method of re-glazing at bathtub in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19291516
  • C
    Other repairsProvide adequate supply of cold water for the fixtures in the kitchen and bathroom in the entire apartmentIssued Sep 14, 2026 · fix by Sep 20, 2026 overdue · rent impairing · Violation #19185907
  • C
    No heat or hot waterProvide adequate supply of hot water for the fixtures in the kitchen and bathroom in the entire apartmentIssued Sep 14, 2026 · fix by Sep 20, 2026 overdue · rent impairing · Violation #19185906
  • C
    No heat or hot waterProvide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the…Issued Sep 4, 2026 · fix by Sep 10, 2026 overdue · Violation #19185908
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19185903
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19185904
  • C
    Other repairsProvide adequate supply of cold water for the fixtures at bathroom and kitchen in the entire apartmentIssued Sep 4, 2026 · fix by Sep 10, 2026 overdue · rent impairing · Violation #19185901
  • C
    No heat or hot waterProvide adequate supply of hot water for the fixtures at bathroom and kitchen in the entire apartmentIssued Sep 4, 2026 · fix by Sep 10, 2026 overdue · rent impairing · Violation #19185900
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19121248
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2026 · fix by Aug 24, 2026 overdue · Violation #19101341
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door at 2nd public hall bulkhead from eastIssued May 20, 2026 · fix by Jun 3, 2026 overdue · Violation #18942056
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at door at 2nd public hall bulkhead from eastIssued May 20, 2026 · fix by Jun 3, 2026 overdue · Violation #18942057
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 13, 2025 · fix by Sep 8, 2025 overdue · Violation #18153159
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2025 · fix by Sep 8, 2025 overdue · Violation #18153160
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 12, 2025 · fix by Jun 16, 2025 overdue · Violation #17888516
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 12, 2025 · fix by Jun 16, 2025 overdue · Violation #17888518
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued May 7, 2025 · fix by May 11, 2025 overdue · Violation #17881954
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued May 7, 2025 · fix by May 11, 2025 overdue · Violation #17881955
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th storyIssued Oct 16, 2023 · fix by Nov 20, 2023 overdue · Violation #16310524
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 15, 2023 · fix by Sep 10, 2023 overdue · Violation #16163899
  • C
    Other repairsRemove all obstructions from water closet . in the bathroomIssued Aug 15, 2023 · fix by Aug 21, 2023 overdue · rent impairing · Violation #16157418
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2023 · fix by Sep 9, 2023 overdue · Violation #16157422
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 14, 2023 · fix by Sep 9, 2023 overdue · Violation #16157423
  • C
    RoachesAbate the infestation consisting of roaches at public hall, 4th storyIssued Aug 14, 2023 · fix by Sep 9, 2023 overdue · Violation #16157417
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued May 23, 2022 · fix by Jun 27, 2022 overdue · Violation #15164494
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 17, 2021 · fix by Jan 10, 2022 overdue · Violation #14738830
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 17, 2021 · fix by Jan 10, 2022 overdue · Violation #14738833
  • B
    Other repairsRemove all encumbrances consisting of flower pots at 1st. stack from east at south buiding front at fire escape, 5th storyIssued Jul 14, 2020 · fix by Aug 18, 2020 overdue · rent impairing · Violation #13722444
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 20, 2019 · fix by Jan 10, 2020 overdue · Violation #13494895
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 20, 2019 · fix by Jan 10, 2020 overdue · Violation #13494896
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 18, 2019 · fix by Jan 8, 2020 overdue · Violation #13506049
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 18, 2019 · fix by Jan 8, 2020 overdue · Violation #13506044
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 11, 2019 · fix by Nov 1, 2019 overdue · Violation #13332862
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 11, 2019 · fix by Nov 1, 2019 overdue · Violation #13332860
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold approximately 4 sq.ft. at 2nd window frame from west at north wall in the 1st room from…Issued May 25, 2018 · fix by Jun 29, 2018 overdue · Violation #12398323
  • B
    Broken doors or locksArrange and make self-closing the doors in the entranceIssued May 25, 2018 · fix by Jun 29, 2018 overdue · Violation #12398321
  • B
    Other repairsReplace with new the broken or defective window balances at sashes thru-out in the entire apartmentIssued Sep 7, 2017 · fix by Oct 12, 2017 overdue · Violation #11959802
  • C
    Broken doors or locksSection 27-2033 adm code provide ready access to buildings heating system boiler room door locked at basementIssued May 2, 2016 · fix by May 10, 2016 overdue · Violation #11217899
  • B
    Plumbing, sinks and toiletsSection 27-2026 adm code repair the broken or defective connection waste line at wash basin in the bathroomIssued Apr 2, 2015 · fix by May 7, 2015 overdue · Violation #10654286
  • C
    Broken doors or locksSection 27-2033 adm code provide ready access to buildings heating system door locked at boiler roomIssued Mar 18, 2014 · fix by Mar 26, 2014 overdue · Violation #10175198
  • B
    Missing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rulesIssued May 29, 2013 · fix by Jul 3, 2013 overdue · Violation #9849423
  • B
    Missing smoke or CO detectorSection 27-2045 adm code repair or replace the smoke detector missingIssued May 29, 2013 · fix by Jul 3, 2013 overdue · Violation #9849424
  • B
    RoachesSection 27-2018 adm code abate the nuisance consisting of vermin roaches in the entire apartmentIssued Aug 30, 2007 · fix by Oct 4, 2007 overdue · Violation #6905621
  • C
    Lead paintSection 27-2013 adm code remove or cover in a manner approved by the department the peeling lead paint ceiling southwest room 4th sty northwestIssued Jul 20, 1999 · fix by Aug 9, 1999 overdue · Violation #566316
  • C
    Lead paintSection 27-2013 adm code remove or cover in a manner approved by the department the peeling lead paint ceiling foyer 4th sty northwestIssued Jul 20, 1999 · fix by Aug 9, 1999 overdue · Violation #566315
  • C
    Lead paintSection 27-2013 adm code remove or cover in a manner approved by the department the peeling lead paint ceiling and south wall northwest room 4th sty northwestIssued Jul 20, 1999 · fix by Aug 9, 1999 overdue · Violation #566318
  • C
    Lead paintSection 27-2013 adm code remove or cover in a manner approved by the department the peeling lead paint wall under kitchen sink 4th sty northwestIssued Jul 20, 1999 · fix by Aug 9, 1999 overdue · Violation #566317

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

282017
312018
752019
72020
182021
672022
402023
42024
332025
472026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 480 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.