Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Elmhurst

89-10 Whitney Avenue, Queens

11373 · 96 apartments · 6 stories · City Council district 25

By · Updated · Data from NYC HPD

C
33open immediately hazardous violations · 34 per 100 apartments
B167Hazardous, open
A33Non-hazardous, open
!228Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

13 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning company8910 ANTONIOS REALTY LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    58
  2. Peeling paint and plaster
    45
  3. Lead paint
    34
  4. Missing smoke or CO detector
    24
  5. Broken doors or locks
    19
  6. Leaks and water damage
    13
  7. Mold
    12
  8. Electrical problems
    7
  9. Roaches
    6
  10. No heat or hot water
    5
  11. Mice or rats
    4
  12. Bedbugs
    3
  13. Plumbing, sinks and toilets
    3

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C89 days
from 46 closed · NYC typical: 84 days
B217 days
from 30 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354851
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19354850
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling, north and west wall in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19356348
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218895
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the 2nd room from north at eastIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218887
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218896
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 square feet, less than 20 sq ft observed at ceiling,south wall,east wall in the…Issued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218886
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218890
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218889
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Sep 16, 2026 · fix by Sep 22, 2026 overdue · Violation #19218892
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet, but less than 20 sq ft observed at ceiling and north wall in the…Issued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218891
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218894
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from north at westIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218893
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from north at eastIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218888
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and south wall at public hall, 1st story, section ''a-h''Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19199971
  • C
    Mice or ratsAbate the infestation consisting of mice at basementIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19148818
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10sqft but less than 30sqft observed at west wall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19148816
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balcony at fire escape at north , 4th storyIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150169
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balcony at fire escape at north , 3rd storyIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150168
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19148815
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balcony at fire escape at north , 2nd storyIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150167
  • C
    RoachesAbate the infestation consisting of roaches at public hallIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19148819
  • B
    Broken doors or locksProperly repair or replace the broken or defective door at cabinet under sink in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19148817
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19148814
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqaure feet at ceiling in the bathroomIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19063230
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050029
  • C
    RoachesAbate the infestation consisting of roaches at compactor closet, 6th story, section at southIssued Jul 6, 2026 · fix by Aug 1, 2026 overdue · Violation #19050046
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of gnats and flies at compactor closet, 6th story, section at southIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050045
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at compactor closet, 6th story, section at southIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050043
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at door at compactor closet, 5th story, section at southIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050040
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north, west and south wall in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050032
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 4th story balcony at 2nd stack from…Issued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050048
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 3rd story balcony at 2nd stack…Issued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050049
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050037
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set and hinges at compactor closet, 5th story, section at southIssued Jul 6, 2026 · fix by Jul 20, 2026 overdue · Violation #19050039
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 6th story balcony at 2nd stack from…Issued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050047
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19050036
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 6th story, section ''west''Issued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19053695
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 5th storyIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · rent impairing · Violation #19050041
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling basement at public hallIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19053698
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the at compactor closet at public hall, 6th story, section ''west''Issued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19053697
  • C
    RoachesAbate the infestation consisting of roaches at compactor closet, 1st story, section ''a-h''Issued Mar 10, 2026 · fix by Apr 5, 2026 overdue · Violation #18697578
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621227
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at compactor door at public hall, 4th storyIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621229
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621226
  • B
    Other repairsProperly repair or replace the broken or defective bell buzzer from building front entrance to south wall in the foyerIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621225
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light switch at north wall in the kitchenIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621224
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the kitchenIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621223
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the bathroomIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621222
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18621221
  • B
    Other repairsRemove all encumbrances consisting of consisting of houshold items at public hall, 6th storyIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · rent impairing · Violation #18527131
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from northIssued Dec 1, 2025 · fix by Nov 29, 2025 overdue · rent impairing · Violation #18470062
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the 2nd room from northIssued Dec 1, 2025 · fix by Nov 29, 2025 overdue · rent impairing · Violation #18470060
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Dec 1, 2025 · fix by Dec 27, 2025 overdue · rent impairing · Violation #18470064
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the 1st room from northIssued Dec 1, 2025 · fix by Nov 29, 2025 overdue · rent impairing · Violation #18470063
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling in closet at west wall in the private hallwayIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18300804
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling less than 10 sq st in the bathroomIssued Oct 6, 2025 · fix by Nov 10, 2025 overdue · Violation #18278278
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots 5th story balcony at 1 stack from east at south…Issued Sep 12, 2025 · fix by Oct 17, 2025 overdue · Violation #18223177
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd, 4th, 5th, story balconies at 2 stack from east…Issued Sep 12, 2025 · fix by Oct 17, 2025 overdue · Violation #18223175
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill at 2, 3rd, 4th, 5th,…Issued Sep 12, 2025 · fix by Oct 17, 2025 overdue · Violation #18223174

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

222017
362018
62019
242021
622022
112023
612024
1042025
752026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 534 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.