Housing violations · Williamsbridge-Olinville
678 East 225 Street, Bronx
10466 · 43 apartments · 5 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint14
- Peeling paint and plaster14
- Broken doors or locks11
- Other repairs5
- Mold4
- Roaches3
- Plumbing, sinks and toilets3
- Leaks and water damage2
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 103 closed · NYC typical: 87 days
from 140 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CMoldTrace and repair the source and abate the visible mold condition more than 10 square feet at the north wall, the east wall and the ceiling in the bathroomIssued Jun 3, 2026 · fix by Jun 29, 2026 overdue · Violation #18982372
- CBroken doors or locksRemove the illegal fastening consisting of an unacceptable 2 motion electromagnetic locking device installed at building entrance door , 1st storyIssued May 18, 2026 · fix by May 24, 2026 overdue · rent impairing · Violation #18940584
- BOther repairsProvide approved type wire mesh installed at skilight at 1st public hall bulkhead from east, 5th story, section ''east''Issued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18799865
- CBroken doors or locksProvide security in-event of an power outage by means of heavy duty lock and latch set install at building entrance door at public hall, 1st storyIssued Apr 17, 2026 · fix by Apr 23, 2026 overdue · Violation #18799676
- BBroken doors or locksProvide security in the event of a power failure by means of an accepatable mechanical heavy duty lock and latch set at door [street to public hall] , 1st storyIssued Apr 13, 2026 · fix by May 18, 2026 overdue · Violation #18785823
- CBroken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at door [street to public hall] , 1st storyIssued Apr 13, 2026 · fix by Apr 19, 2026 overdue · rent impairing · Violation #18785822
- CBroken doors or locksProperly repair or replace the broken or defective heavy duty key locking device and assemblys at street to 1st story public hall door , 1st storyIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18634478
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 24, 2025 · fix by Jan 17, 2026 overdue · Violation #18530254
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 24, 2025 · fix by Jan 17, 2026 overdue · Violation #18530255
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 24, 2025 · fix by Jan 17, 2026 overdue · Violation #18530253
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 24, 2025 · fix by Jan 17, 2026 overdue · Violation #18530252
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 8, 2025 · fix by Jan 1, 2026 overdue · Violation #18494359
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 1st room from eastIssued Sep 8, 2025 · fix by Sep 14, 2025 overdue · Violation #18215037
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 14, 2025 · fix by Aug 7, 2025 overdue · Violation #18091915
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 3, 2025 · fix by Jul 29, 2025 overdue · Violation #18069004
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective bathtub porcelain enamel surface by method of reglazing in the bathroomIssued Jun 3, 2025 · fix by Jul 8, 2025 overdue · Violation #17937188
- CBroken doors or locksRemove the illegal fastening consisting of an unacceptable electromangnectic device installed at street entrance door to vestibule , 1st storyIssued May 8, 2025 · fix by May 14, 2025 overdue · rent impairing · Violation #17883255
- BBroken doors or locksProvide security in the event of power outage by means of an acceptable heavy duty mechanical lock and assembly at street entranced door. , 1st storyIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17883264
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Mar 26, 2025 · fix by Apr 19, 2025 overdue · Violation #17791444
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Mar 25, 2025 · fix by Apr 18, 2025 overdue · Violation #17785768
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 25, 2025 · fix by Apr 18, 2025 overdue · Violation #17785767
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 25, 2025 · fix by Apr 18, 2025 overdue · Violation #17785766
- CLead paintProvide incase of power outtage a heavy duty mechanical lock at door leading to street from 1st pubic hall (building front)Issued Mar 21, 2025 · fix by Mar 27, 2025 overdue · Violation #17777312
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Feb 21, 2025 · fix by Mar 28, 2025 overdue · Violation #17709456
- BOther repairsProperly repair or replace the broken or defective radiator shut- off valve in the 2nd room from northIssued Feb 12, 2025 · fix by Mar 19, 2025 overdue · Violation #17687291
- BBroken doors or locksRefit door in the bathroomIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17550507
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17497644
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Sep 3, 2024 · fix by Sep 27, 2024 overdue · Violation #17241996
- BMoldTrace and repair the source and abate the visible mold condition at north wall approx 3 sq ft in the 1st room from north at eastIssued Dec 12, 2022 · fix by Jan 16, 2023 overdue · Violation #15609054
- BMoldTrace and repair the source and abate the visible mold condition at south wall approx 5 sq ft, east wall approx 5 sq ft and ceiling approx 5 sq ft in the…Issued Aug 12, 2022 · fix by Sep 16, 2022 overdue · Violation #15303755
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all ceilings and all walls in the entire apartmentIssued Jul 20, 2022 · fix by Aug 24, 2022 overdue · Violation #15267268
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 3, 2022 · fix by Jun 27, 2022 overdue · Violation #15193096
- BOther repairsReplace with new the missing top escutcheon plate at east wall heat riser in the bathroomIssued Nov 29, 2021 · fix by Jan 3, 2022 overdue · Violation #14704295
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 1, 2021 · fix by Feb 27, 2021 overdue · Violation #14011098
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 1, 2021 · fix by Feb 27, 2021 overdue · Violation #14011097
- CMoldTrace and repair the source and abate the visible mold condition approx 12 sq ft at ceiling, approx 4 sq ft at south wall, approx 12 sq ft at north wall and…Issued Dec 15, 2020 · fix by Jan 10, 2021 overdue · Violation #13932951
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east and west walls in the bathroomIssued Dec 14, 2020 · fix by Jan 18, 2021 overdue · Violation #13932908
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, west and east walls in the 2nd room from northIssued Dec 14, 2020 · fix by Jan 18, 2021 overdue · Violation #13932917
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basinIssued Dec 11, 2020 · fix by Jan 15, 2021 overdue · Violation #13932965
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Dec 11, 2020 · fix by Jan 15, 2021 overdue · Violation #13932985
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west and north wall in the 3rd room from northIssued Jul 13, 2020 · fix by Aug 17, 2020 overdue · Violation #13721204
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Jul 13, 2020 · fix by Aug 17, 2020 overdue · Violation #13721222
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroomIssued Apr 3, 2012 · fix by May 8, 2012 overdue · Violation #9386728
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallwayIssued Apr 3, 2012 · fix by May 8, 2012 overdue · Violation #9386725
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Dec 5, 2011 · fix by Jan 9, 2012 overdue · Violation #9229552
- BBroken doors or locksReplace or repair the self-closing doors that is missing or defective , door in the entranceIssued Feb 15, 2007 · fix by Mar 27, 2007 overdue · Violation #6603076
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.