Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Williamsbridge-Olinville

950 East 225 Street, Bronx

10466 · 5 apartments · 3 stories · City Council district 12

By · Updated · Data from NYC HPD

C
75open immediately hazardous violations · 1,500 per 100 apartments
B43Hazardous, open
A7Non-hazardous, open
!125Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

17 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company950 E 225 Street Partners LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    38
  2. Mold
    15
  3. Other repairs
    15
  4. No heat or hot water
    14
  5. Missing smoke or CO detector
    10
  6. Mice or rats
    10
  7. Roaches
    6
  8. Lead paint
    5
  9. Peeling paint and plaster
    4
  10. Leaks and water damage
    4
  11. Plumbing, sinks and toilets
    3
  12. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C75 days
from 65 closed · NYC typical: 87 days
B108 days
from 26 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than ten square feet at ceiling in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234975
  • B
    MoldTrace and repair the source and abate the visible mold condition less than ten square feet at ceiling in the 3rd room from north at eastIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234976
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq ft at ceiling in the 1st room from northIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19025519
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sqft at ceiling in the bathroomIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18981467
  • B
    Broken doors or locksRefit entrance door in the 3rd room from north at eastIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945514
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945511
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945510
  • B
    Broken doors or locksRefit entrance door in the bathroomIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945509
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at drain pipe at wash basin in the bathroomIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945507
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 22, 2026 · fix by Jun 17, 2026 overdue · Violation #18945506
  • B
    Other repairsRemove all encumbrances consisting of garbage bags at public hall, 3rd storyIssued May 22, 2026 · fix by Jun 26, 2026 overdue · rent impairing · Violation #18945505
  • C
    Other repairsProperly repair or replace the broken or defective outer glass pane at lower window sash at south wall in the 3rd room from north at eastIssued May 22, 2026 · fix by May 28, 2026 overdue · Violation #18945512
  • B
    Peeling paint and plaster& 309 m/d law abate the nuisance consisting of discarded five gallon paint cans at public hall, 3rd storyIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18945515
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the bathroomIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18793145
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Mar 19, 2026 · fix by Mar 25, 2026 overdue · Violation #18719326
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Mar 19, 2026 · fix by Mar 19, 2026 overdue · rent impairing · Violation #18719324
  • B
    Broken doors or locksProperly repair or replace the broken or defective building entrance door lock and assembly from street. at public hall, 1st storyIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18719327
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 19, 2026 · fix by Mar 19, 2026 overdue · rent impairing · Violation #18719325
  • C
    Broken doors or locksProvide ready access to buildings heating system door lock at boiler roomIssued Mar 2, 2026 · fix by Mar 8, 2026 overdue · Violation #18674141
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 2, 2026 · fix by Mar 1, 2026 overdue · rent impairing · Violation #18674140
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 23, 2026 · fix by Mar 21, 2026 overdue · Violation #18661604
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 23, 2026 · fix by Mar 1, 2026 overdue · Violation #18661603
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 30 square feet at ceiling in the bathroomIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18661606
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 23, 2026 · fix by Feb 23, 2026 overdue · rent impairing · Violation #18661602
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection drain line at wash basin in the bathroomIssued Feb 23, 2026 · fix by Mar 1, 2026 overdue · Violation #18661605
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 23, 2026 · fix by Feb 23, 2026 overdue · rent impairing · Violation #18661601
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18652982
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 19, 2026 · fix by Mar 17, 2026 overdue · Violation #18652973
  • C
    Broken doors or locksProvide ready access to buildings heating system lock door at boiler roomIssued Feb 19, 2026 · fix by Feb 25, 2026 overdue · Violation #18652977
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18652971
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18652972
  • B
    MoldProperly repair with similar material the broken or defective missing/molding (wood) base at north wall in the 1st room from northIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18652975
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the 1st room from northIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18652976
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Feb 19, 2026 · fix by Feb 25, 2026 overdue · Violation #18652978
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18652983
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 19, 2026 · fix by Feb 19, 2026 overdue · rent impairing · Violation #18652970
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of slde bolt lockable (door) at south wall in the kitchenIssued Feb 10, 2026 · fix by Feb 16, 2026 overdue · Violation #18632198
  • C
    Broken doors or locksProvide ready access to buildings heating system lock door at boiler roomIssued Feb 10, 2026 · fix by Feb 16, 2026 overdue · Violation #18632195
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Feb 10, 2026 · fix by Feb 16, 2026 overdue · Violation #18632205
  • C
    Lead paintProperly repair or replace the broken or defective latch and assembly at door (leading to public hallway from vestibule) , 1st storyIssued Feb 10, 2026 · fix by Feb 16, 2026 overdue · Violation #18632201
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 10, 2026 · fix by Feb 10, 2026 overdue · rent impairing · Violation #18632192
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18632193
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18632194
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 10, 2026 · fix by Feb 10, 2026 overdue · rent impairing · Violation #18632196
  • C
    Lead paintProperly repair or replace the broken or defective latch and assembly at door (leading to public hallway from vestibule) , 1st storyIssued Feb 10, 2026 · fix by Feb 16, 2026 overdue · Violation #18632203
  • B
    Broken doors or locksRefit vestibule door , 1st storyIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18506551
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at public hall, 1st storyIssued Nov 24, 2025 · fix by Dec 8, 2025 overdue · Violation #18426784
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 20, 2025 · fix by Oct 26, 2025 overdue · Violation #18310736
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 20, 2025 · fix by Oct 20, 2025 overdue · rent impairing · Violation #18310734
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 7, 2025 · fix by Oct 13, 2025 overdue · Violation #18272008
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 6, 2025 · fix by Nov 1, 2025 overdue · Violation #18272009
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 6, 2025 · fix by Nov 1, 2025 overdue · Violation #18272010
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 2, 2025 · fix by Oct 8, 2025 overdue · Violation #18265987
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 18, 2025 · fix by Sep 13, 2025 overdue · Violation #18171582
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 18, 2025 · fix by Sep 1, 2025 overdue · Violation #18171585
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Aug 18, 2025 · fix by Aug 24, 2025 overdue · Violation #18171583
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 18, 2025 · fix by Sep 13, 2025 overdue · Violation #18171581
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jul 24, 2025 · fix by Jul 30, 2025 overdue · Violation #18109631
  • C
    Broken doors or locksProperly repair or replace the broken or defective mortise lock at building entrance door at public hall, 1st storyIssued Apr 1, 2025 · fix by Apr 7, 2025 overdue · Violation #17790476
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling and east wall at public hall, 1st storyIssued Apr 1, 2025 · fix by May 6, 2025 overdue · Violation #17790474

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

32017
522019
52020
162021
272022
802023
332024
612025
622026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 383 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.