Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Wakefield-Woodlawn

711 East 231 Street, Bronx

10466 · 54 apartments · 6 stories · City Council district 11

By · Updated · Data from NYC HPD

C
18open immediately hazardous violations · 33 per 100 apartments
B43Hazardous, open
A11Non-hazardous, open
!61Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Open in Google Maps ↗

Who owns and manages it

Owning company711-715 E. 231st St LLC
Landlord (head officer or owner)Rick Herman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    20
  2. Peeling paint and plaster
    16
  3. Broken doors or locks
    8
  4. Roaches
    8
  5. Leaks and water damage
    6
  6. Plumbing, sinks and toilets
    5
  7. Mold
    3
  8. Missing smoke or CO detector
    2
  9. Mice or rats
    2
  10. No heat or hot water
    1
  11. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C81 days
from 32 closed · NYC typical: 87 days
B107 days
from 70 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364600
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364599
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130f degrees in the entire apartmentIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19364598
  • B
    Other repairsProperly repair with similar material the broken or defective cement flashing at east exterior wallIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19364601
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance doorIssued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19346709
  • B
    Broken doors or locksProperly repair or replace the broken or defective latchset and assembly at building entrance doorIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346710
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st storyIssued Oct 28, 2026 · fix by Nov 11, 2026 overdue · Violation #19331933
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at apartment door in the entranceIssued Oct 28, 2026 · fix by Nov 11, 2026 overdue · Violation #19331932
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19285455
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinets at sink in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19285453
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling in the bathroomIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19285456
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19285454
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258416
  • B
    Other repairsProperly repair or replace the broken or defective window frame at 1st window from east at south in the 4th room from northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258415
  • B
    Other repairsProperly repair with similar material the broken or defective wood at floor (buldging) in the 2nd room from northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258414
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258412
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258419
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq.ft at at west south and east walls in the bathroomIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096883
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq.ft at ceiling east and south wall in the bathroomIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096881
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq.ft at ceiling and east wall in the bathroomIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096879
  • B
    Other repairsProperly repair with similar material the broken or defective wooden floor in the 1st room from eastIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18795325
  • B
    Other repairsProperly repair with similar material the broken or defective wooden floor in the 4th room from east at centerIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18795319
  • B
    Other repairsProperly repair with similar material the broken or defective wopden floor defective in the 2nd room from eastIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18795324
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 15, 2026 · fix by May 11, 2026 overdue · Violation #18783636
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 15, 2026 · fix by May 11, 2026 overdue · Violation #18783637
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor lifting and buckleing in the 1st room from north at centerIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772566
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallwayIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772567
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective floor at sink base cabinet in the kitchenIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772564
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall. in the bathroomIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772571
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling ,north and west walls in the 1st room from eastIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18757903
  • B
    Other repairsProperly repair with similar material the broken or defective wooden floor lifting in the 2nd room from eastIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18757901
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18757899
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18565841
  • C
    Broken doors or locksProperly repair or replace the broken or defective locking device at entrance door in the entranceIssued Jan 13, 2026 · fix by Jan 19, 2026 overdue · Violation #18565840
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18565839
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet missing face panel in the kitchenIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18565836
  • B
    Other repairsProperly repair or replace the broken or defective upper wall kitchen cabinet at north wall in the kitchenIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18565837
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18565838
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18565842
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 13, 2026 · fix by Feb 8, 2026 overdue · Violation #18565843
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 23, 2025 · fix by Nov 18, 2025 overdue · Violation #18318662
  • B
    Other repairsProperly repair with similar material the broken or defective hard wood floor in the 3rd room from northIssued Oct 23, 2025 · fix by Nov 27, 2025 overdue · Violation #18318663
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from eastIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18280086
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the 3rd room from eastIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18280085
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of lockable slide bolt installed at door interior in the entranceIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18280088
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of of lockable slide bolt at fire exit door in the 3rd room from eastIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18280089
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 24, 2025 · fix by Oct 20, 2025 overdue · Violation #18247827
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective water damaged base cabinet at sink in the kitchenIssued Sep 11, 2025 · fix by Oct 16, 2025 overdue · Violation #18217922
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 11, 2025 · fix by Oct 7, 2025 overdue · Violation #18217925
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 3, 2024 · fix by Oct 29, 2024 overdue · Violation #17322023
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and west walls in the 2nd room from northIssued Oct 1, 2024 · fix by Nov 5, 2024 overdue · Violation #17312213
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 5, 2024 · fix by Mar 2, 2024 overdue · Violation #16642515
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Dec 18, 2023 · fix by Jan 11, 2024 overdue · Violation #16530344
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 6, 2023 · fix by Dec 2, 2023 overdue · Violation #16359312
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2023 · fix by Dec 2, 2023 overdue · Violation #16359311
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Jul 31, 2023 · fix by Sep 4, 2023 overdue · Violation #16125417
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective rotted wood sink base cabinet in the kitchenIssued May 31, 2023 · fix by Jul 5, 2023 overdue · Violation #16017927
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued May 31, 2023 · fix by Jul 5, 2023 overdue · Violation #16017929
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bath tub in the bathroomIssued Nov 4, 2022 · fix by Dec 9, 2022 overdue · Violation #15455319
  • B
    Other repairsProperly repair with similar material the broken or defective the vinyl tiles at floor in the kitchenIssued Nov 4, 2022 · fix by Dec 9, 2022 overdue · Violation #15455320

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

272017
192018
302019
322020
132021
332022
452023
392024
162025
1022026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 672 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.