Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Wakefield-Woodlawn

683 East 234 Street, Bronx

10466 · 6 apartments · 3 stories · City Council district 11

By · Updated · Data from NYC HPD

C
24open immediately hazardous violations · 400 per 100 apartments
B40Hazardous, open
A7Non-hazardous, open
!71Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

13 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company683 E 234th Holdings LLC
Landlord (head officer or owner)Ian Lagowitz

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    27
  2. Broken doors or locks
    16
  3. Peeling paint and plaster
    11
  4. Leaks and water damage
    6
  5. Roaches
    4
  6. Mice or rats
    2
  7. Missing smoke or CO detector
    2
  8. No heat or hot water
    2
  9. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C45 days
from 4 closed · NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder completely descended to ground at fire escape at west…Issued Jun 1, 2026 · fix by Jul 6, 2026 overdue · rent impairing · Violation #18963614
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenetteIssued May 29, 2026 · fix by Jul 3, 2026 overdue · Violation #18963612
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallwayIssued May 29, 2026 · fix by Jul 3, 2026 overdue · Violation #18963613
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 29, 2026 · fix by Jun 24, 2026 overdue · Violation #18963611
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 29, 2026 · fix by Jun 24, 2026 overdue · Violation #18963610
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective vestibule door at public hall, 1st storyIssued Dec 5, 2025 · fix by Dec 19, 2025 overdue · Violation #18487753
  • C
    Broken doors or locksProvide operable handle a bulkhead door exteriorIssued Dec 5, 2025 · fix by Dec 11, 2025 overdue · Violation #18487750
  • C
    Other repairsProperly repair or replace the broken or defective air valve at radiator in the 2nd room from northIssued Dec 5, 2025 · fix by Dec 11, 2025 overdue · Violation #18487722
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Dec 5, 2025 · fix by Jan 9, 2026 overdue · Violation #18487711
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Dec 5, 2025 · fix by Jan 9, 2026 overdue · Violation #18487702
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Dec 5, 2025 · fix by Jan 9, 2026 overdue · Violation #18487703
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Dec 5, 2025 · fix by Jan 9, 2026 overdue · Violation #18487704
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the bathroomIssued Dec 5, 2025 · fix by Jan 9, 2026 overdue · Violation #18487713
  • C
    Other repairsProperly repair or replace the broken or defective at radiator flow control valve in the 2nd room from northIssued Dec 5, 2025 · fix by Dec 11, 2025 overdue · Violation #18487721
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 5, 2025 · fix by Dec 31, 2025 overdue · Violation #18487724
  • C
    Broken doors or locksRemove the illegal fastening consisting of cylinder lock at bulkhead door exterior at roofIssued Dec 5, 2025 · fix by Dec 11, 2025 overdue · rent impairing · Violation #18487751
  • B
    Other repairsRemove all encumbrances consisting of house hold items at public hall, 3rd storyIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · rent impairing · Violation #18306423
  • B
    Other repairsReplace with new the missing metal screen under sky light at bulkheadIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18306433
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 3rd storyIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · rent impairing · Violation #18306424
  • B
    Other repairsRemove all encumbrances consisting of house hold items at public hall, 1st storyIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · rent impairing · Violation #18306419
  • B
    Broken doors or locksReplace with new the missing metal door at mailbox forIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18306421
  • B
    Other repairsRemove all encumbrances consisting of house hold items at public hall, 2nd storyIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · rent impairing · Violation #18306422
  • B
    Other repairsProperly repair with similar material the broken or defective fire-retardant material at ceiling at public hall, 3rd storyIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18306425
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18288258
  • B
    Other repairsProperly repair with similar material the broken or defective grout at west north and south wall in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18288257
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18293016
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at westIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18293017
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at west and south walls in the bathroomIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18293015
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 2nd storyIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · rent impairing · Violation #18293022
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock and assembley at building entrance door at public hall, 1st storyIssued Oct 10, 2025 · fix by Oct 16, 2025 overdue · Violation #18288259
  • C
    Broken doors or locksProperly repair or replace the broken or defective locking device at building front entrance door , 1st storyIssued Oct 10, 2025 · fix by Oct 16, 2025 overdue · Violation #18293019
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 3rd storyIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · rent impairing · Violation #18293025
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18293012
  • B
    Broken doors or locksProvide unlockable slide bolt or hook on roof door that does not allow re-entry from roof to bulkhead at 3rd story at public hall stairsIssued Feb 25, 2025 · fix by Apr 1, 2025 overdue · Violation #17718550
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock and assemblys at door from street to vestibule at building front entrance at public hallIssued Feb 25, 2025 · fix by Mar 3, 2025 overdue · Violation #17718548
  • B
    Other repairsRemove all encumbrances consisting of household items preventing egress to and from unit 3 at 2nd story at public hallIssued Feb 25, 2025 · fix by Apr 1, 2025 overdue · rent impairing · Violation #17718547
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd, and 2nd story balcony at fire escape from…Issued Feb 25, 2025 · fix by Apr 1, 2025 overdue · Violation #17718546
  • B
    Broken doors or locksRemove the illegal fastening pushbar installed on roof door that does not allow re-entry from roof to bulkhead at 3rd story at public hall stairsIssued Feb 25, 2025 · fix by Apr 1, 2025 overdue · rent impairing · Violation #17718549
  • B
    Other repairsProperly repair with similar material the broken or defective rotted wood floor in the 1st room from northIssued Jun 3, 2024 · fix by Jul 8, 2024 overdue · Violation #17017645
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missingIssued Jun 3, 2024 · fix by Jul 8, 2024 overdue · Violation #17017648
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Jun 3, 2024 · fix by Jul 8, 2024 overdue · Violation #17017646
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at south wall, north wall and west wall in the bathroomIssued Jun 3, 2024 · fix by Jul 8, 2024 overdue · Violation #17017643
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 3, 2024 · fix by Jul 8, 2024 overdue · Violation #17017642
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant ceiling over stairs to bulkheadIssued May 15, 2024 · fix by Jun 19, 2024 overdue · Violation #16971264
  • C
    Broken doors or locksProperly repair or replace the broken or defective door lock and assembley street to building at public hall, 1st storyIssued May 15, 2024 · fix by May 21, 2024 overdue · Violation #16971262
  • B
    Leaks and water damageRepair the roof so that it will not leak the ceilingIssued May 15, 2024 · fix by Jun 19, 2024 overdue · rent impairing · Violation #16971263
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead , 3rd storyIssued Apr 12, 2024 · fix by May 17, 2024 overdue · Violation #16861737
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 10, 2023 · fix by Feb 10, 2023 overdue · rent impairing · Violation #15711142
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Feb 10, 2023 · fix by Feb 16, 2023 overdue · Violation #15711143
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 24, 2022 · fix by Oct 30, 2022 overdue · Violation #15439112
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of key operated lockset at entrance door to fire escape window in the 3rd room from north at westIssued Oct 13, 2022 · fix by Oct 19, 2022 overdue · Violation #15415019
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Oct 13, 2022 · fix by Oct 19, 2022 overdue · Violation #15415016
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile floor in the kitchenIssued Oct 13, 2022 · fix by Nov 17, 2022 overdue · Violation #15415017
  • B
    Broken doors or locksProperly repair the broken or defective the wood door in the 3rd room from north at westIssued Oct 13, 2022 · fix by Nov 17, 2022 overdue · Violation #15415018
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 13, 2022 · fix by Oct 13, 2022 overdue · rent impairing · Violation #15415015
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 5, 2022 · fix by Oct 11, 2022 overdue · Violation #15403256
  • C
    Other repairsAbate the nuisance consisting of excessive storage of material household items in vasinity of gas range in the kitchenIssued Jan 31, 2022 · fix by Feb 6, 2022 overdue · Violation #14808901
  • B
    Other repairsProperly repair the broken or defective intercom system in the entire apartmentIssued Oct 6, 2020 · fix by Nov 10, 2020 overdue · Violation #13846871
  • B
    Other repairsAbate the nuisance consisting of excessive storage of material consisting of boxes, paper,clothes and other personal effects in the entire apartmentIssued Jan 28, 2020 · fix by Mar 3, 2020 overdue · Violation #13568873
  • C
    Other repairsAbate the nuisance consisting of excessive storage of material consisting of boxes, paper and other personal effects stored in the vicinity of the gas range in…Issued Jan 28, 2020 · fix by Feb 5, 2020 overdue · Violation #13565005

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

82017
252018
722019
242020
12021
112022
32023
142024
412025
62026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 404 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.