Housing violations · Wakefield-Woodlawn
63 East 236 Street, Bronx
10470 · 7 apartments · 3 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks7
- Peeling paint and plaster4
- Leaks and water damage3
- Other repairs2
- Mold2
- Missing smoke or CO detector2
- No heat or hot water2
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 2 closed · NYC typical: 87 days
from 3 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLeaks and water damageRepair the roof so that it will not leak at the ceiling in the kitchenIssued May 7, 2026 · fix by Jun 11, 2026 overdue · rent impairing · Violation #18876632
- BBroken doors or locksRefit door at entrance in the bathroomIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18876631
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from northIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18876629
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 4th room from northIssued May 7, 2026 · fix by Jun 11, 2026 overdue · rent impairing · Violation #18876633
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket at upper and lower doors of refrigerator in the kitchenIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18876627
- BLeaks and water damageRepair the roof so that it will not leak at ceiling and north wall in the 1st room from northIssued May 7, 2026 · fix by Jun 11, 2026 overdue · rent impairing · Violation #18876626
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective wood door in the entranceIssued May 7, 2026 · fix by May 21, 2026 overdue · Violation #18876625
- COther repairsProperly repair with similar material the broken or defective concrete tread 7th up from bottom at stoopIssued May 7, 2026 · fix by May 13, 2026 overdue · Violation #18876634
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at ceiling and east wall in the bathroomIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18739529
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler room, 1st storyIssued Nov 24, 2025 · fix by Nov 30, 2025 overdue · Violation #18425911
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18425916
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18425915
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18425914
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the 1st room from northIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18425912
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 24, 2025 · fix by Nov 23, 2025 overdue · rent impairing · Violation #18425910
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 24, 2025 · fix by Nov 23, 2025 overdue · rent impairing · Violation #18425909
- BBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued May 8, 2015 · fix by Jun 12, 2015 overdue · Violation #10702851
- CBroken doors or locksProvide ready access to buildings heating system boiler room door locked at basementIssued Jan 31, 2014 · fix by Feb 8, 2014 overdue · Violation #10114444
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.