Housing violations · Wakefield-Woodlawn
710 East 243 Street, Bronx
10470 · 50 apartments · 6 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
26 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster145
- Lead paint115
- Other repairs95
- Mice or rats39
- Leaks and water damage35
- Broken doors or locks34
- Missing smoke or CO detector34
- Roaches30
- Mold15
- Electrical problems13
- Plumbing, sinks and toilets13
- Missing window guards6
- No heat or hot water3
- Bedbugs2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 63 closed · NYC typical: 87 days
from 31 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Oct 2, 2026 · fix by Oct 6, 2026 overdue · Violation #19273987
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Oct 2, 2026 · fix by Oct 6, 2026 overdue · Violation #19273986
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at west wall at public hall, 2nd story, section ''710''Issued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18995705
- COther repairs& 309 m/d law abate the nuisance consisting of cracked vinyl floor tiles creating a trip hazard at public hall, 2nd story, section ''710''Issued Jun 11, 2026 · fix by Jun 17, 2026 overdue · Violation #18995707
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling at public hall, 4th story, section ''710''Issued Jun 11, 2026 · fix by Jun 17, 2026 overdue · Violation #18995704
- BBroken doors or locksProperly repair or replace the broken or defective latch set and it's assemblies at building entrance door at public hall, 2nd story, section ''710''Issued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18995711
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entnance door at public hall, 2nd story, section ''710''Issued Jun 11, 2026 · fix by Jun 25, 2026 overdue · Violation #18995710
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage bags at rear yardIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18995702
- BOther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder in down position at east exterior wall building rear at…Issued Jun 11, 2026 · fix by Jul 16, 2026 overdue · rent impairing · Violation #18995703
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18822458
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18822460
- CMoldTrace and repair the source and abate the visible mold condition at the north wall and the ceiling in the bathroomIssued Apr 28, 2026 · fix by May 24, 2026 overdue · Violation #18822934
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroomIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18822449
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18822451
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · rent impairing · Violation #18822455
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18822459
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18822465
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18822468
- CBroken doors or locksProperly repair or replace the broken or defective pushbar at building entrance door , 1st storyIssued Apr 28, 2026 · fix by May 4, 2026 overdue · Violation #18822478
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 28, 2026 · fix by May 4, 2026 overdue · Violation #18822464
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772544
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772545
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the private hallwayIssued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18671093
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south and north walls in the 1st room from northIssued Jan 29, 2026 · fix by Mar 5, 2026 overdue · Violation #18604554
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and south and north walls in the 1st room from northIssued Jan 29, 2026 · fix by Mar 5, 2026 overdue · Violation #18604552
- BOther repairsProvide an adequate supply of gas to the fixtures at the gas range in the kitchenIssued Jan 29, 2026 · fix by Mar 5, 2026 overdue · rent impairing · Violation #18604551
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the kitchenIssued Jan 29, 2026 · fix by Mar 5, 2026 overdue · Violation #18604561
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city…Issued Jan 28, 2026 · fix by Feb 23, 2026 overdue · Violation #18604569
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color approximately 15 square feet of loose plaster at the ceiling ceiling in the…Issued Jan 12, 2026 · fix by Jan 18, 2026 overdue · Violation #18546255
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 12, 2026 · fix by Feb 5, 2026 overdue · Violation #18564681
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jan 12, 2026 · fix by Feb 5, 2026 overdue · Violation #18564680
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 12, 2026 · fix by Feb 5, 2026 overdue · Violation #18564678
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jan 12, 2026 · fix by Feb 5, 2026 overdue · Violation #18564673
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the kitchenIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546250
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall in the kitchenIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546251
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall, west wall in the foyerIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546253
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the private hallwayIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546256
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north at eastIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546258
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546259
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546263
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from northIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546265
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall in the 3rd room from northIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546266
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the 1st room from north at westIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546268
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · rent impairing · Violation #18546271
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546272
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at the south wall in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546273
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at the west wall in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546274
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546275
- BOther repairsProperly repair or replace the broken or defective lower sash window pane at the 2nd window from west at north wall in the 1st room from north at eastIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546276
- BOther repairsProperly repair or replace the broken or defective lower sash window pane at the 1st window from west at north wall in the 1st room from north at westIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546278
- BOther repairsProperly repair or replace the broken or defective lower sash window pane at east 1 window in the 3rd room from northIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546279
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546280
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18546282
- BOther repairsRemove all encumbrances consisting of rat infested trash bags in the 1st and 2nd floor public hallways at public hallIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · rent impairing · Violation #18556720
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jan 12, 2026 · fix by Feb 7, 2026 overdue · rent impairing · Violation #18556709
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 12, 2026 · fix by Feb 5, 2026 overdue · Violation #18564674
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 12, 2026 · fix by Feb 5, 2026 overdue · Violation #18564679
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color approximately 10 square feet of loose plaster at the ceiling ceiling in the…Issued Jan 12, 2026 · fix by Jan 18, 2026 overdue · Violation #18546261
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color approximately 20 square feet of loose plaster at the ceiling in the kitchenIssued Jan 12, 2026 · fix by Jan 18, 2026 overdue · Violation #18546281
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jan 12, 2026 · fix by Feb 5, 2026 overdue · Violation #18564677
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.