Housing violations · Norwood
275 East Gun Hill Road, Bronx
10467 · 86 apartments · 6 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks30
- Other repairs28
- Lead paint25
- Mold14
- Roaches14
- Peeling paint and plaster13
- Mice or rats13
- Missing window guards4
- Plumbing, sinks and toilets3
- Leaks and water damage3
- Electrical problems3
- Missing smoke or CO detector2
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 85 closed · NYC typical: 87 days
from 116 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jun 3, 2026 · fix by Jun 9, 2026 overdue · Violation #18981963
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · rent impairing · Violation #18951126
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective silicome caulking around bathtub in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18951128
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18951127
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 12, 2026 · fix by Apr 7, 2026 overdue · Violation #18699720
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembley at building entrance door at public hall, 1st storyIssued Mar 12, 2026 · fix by Mar 18, 2026 overdue · Violation #18699716
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 29, 2026 · fix by Mar 5, 2026 overdue · Violation #18601921
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 29, 2026 · fix by Mar 5, 2026 overdue · Violation #18601920
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 21, 2025 · fix by Dec 17, 2025 overdue · Violation #18392420
- CLead paint& 309 m/d law abate the nuisance consisting of sliding bolt arranged to be pad locked at door leading to public hall in the 3rd room from eastIssued Nov 21, 2025 · fix by Nov 27, 2025 overdue · Violation #18429723
- CLead paint& 309 m/d law abate the nuisance consisting of door leading to public hall sealed shut in the 3rd room from eastIssued Nov 21, 2025 · fix by Nov 27, 2025 overdue · Violation #18415301
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 20, 2025 · fix by Nov 20, 2025 overdue · rent impairing · Violation #18392421
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 20, 2025 · fix by Dec 25, 2025 overdue · Violation #18392422
- BOther repairsProperly repair with similar material the broken or defective bricks and mortar joints over the windows at building front north , 6th story, section ''center''Issued Aug 26, 2025 · fix by Sep 30, 2025 overdue · Violation #18187037
- BBroken doors or locksProperly repair or replace the broken or defective latch set at vestibule door at public hall, 1st storyIssued Jul 25, 2025 · fix by Aug 29, 2025 overdue · Violation #18117959
- BBroken doors or locksProperly repair or replace the broken or defective latch set at vestibule door , 1st storyIssued Jul 24, 2025 · fix by Aug 28, 2025 overdue · Violation #18116937
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 5, 2025 · fix by Jun 19, 2025 overdue · Violation #17953355
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at boiler roomIssued Jun 2, 2025 · fix by Jun 16, 2025 overdue · Violation #17929757
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire egress door in the 1st room from eastIssued Jun 2, 2025 · fix by Jun 8, 2025 overdue · Violation #17929747
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 2, 2025 · fix by Jun 16, 2025 overdue · Violation #17929774
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire egress door in the 1st room from northIssued Jun 2, 2025 · fix by Jun 8, 2025 overdue · Violation #17929775
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 4th room from north at westIssued Jun 2, 2025 · fix by Jun 8, 2025 overdue · Violation #17929764
- BOther repairsProperly repair with similar material the broken or defective brick and mortar joints at building front at west, center and east section , 6th storyIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17929760
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of household items blocking fire egress door in the 1st room from eastIssued Jun 2, 2025 · fix by Jun 8, 2025 overdue · Violation #17929749
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 2, 2025 · fix by Jun 16, 2025 overdue · Violation #17929730
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 2, 2025 · fix by Jun 16, 2025 overdue · Violation #17929736
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in the bathroomIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17877908
- CBroken doors or locksProperly repair or replace the broken or defective heavy duty lock at vestibule door , 1st storyIssued May 8, 2025 · fix by May 14, 2025 overdue · Violation #17877916
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft on north and east walls at stairs lower level up in the private hallwayIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17815126
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock on the building entrance doorIssued Mar 3, 2025 · fix by Mar 9, 2025 overdue · Violation #17728552
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 27, 2025 · fix by Mar 25, 2025 overdue · Violation #17724716
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at north and west walls in the bathroomIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17724717
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 27, 2025 · fix by Mar 25, 2025 overdue · Violation #17724715
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Feb 21, 2025 · fix by Mar 19, 2025 overdue · Violation #17703592
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective due to inoperable hinges at door in the entranceIssued Feb 21, 2025 · fix by Mar 7, 2025 overdue · Violation #17703594
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 21, 2025 · fix by Mar 19, 2025 overdue · Violation #17703593
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of seal shut door at 2nd egress door in the 3rd room from eastIssued Jan 16, 2025 · fix by Jan 22, 2025 overdue · Violation #17623051
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Jan 16, 2025 · fix by Jan 30, 2025 overdue · Violation #17623048
- BMoldTrace and repair the source and abate the visible mold condition more than 10 square ft at the east wall, east wall in the kitchenIssued Jan 2, 2025 · fix by Feb 6, 2025 overdue · Violation #17587024
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jan 2, 2025 · fix by Jan 26, 2025 overdue · Violation #17596973
- BMoldTrace and repair the source and abate the visible mold condition more than 10 square ft at the 1st window frame from west at north wall, 1st window frame from…Issued Jan 2, 2025 · fix by Feb 6, 2025 overdue · Violation #17587019
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 2, 2025 · fix by Jan 26, 2025 overdue · Violation #17596972
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 2, 2025 · fix by Jan 26, 2025 overdue · Violation #17596975
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at ceiling at lower level in the 1st room from northIssued Dec 10, 2024 · fix by Jan 14, 2025 overdue · Violation #17548278
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall lower level in the 1st room from eastIssued Dec 5, 2024 · fix by Jan 9, 2025 overdue · Violation #17508748
- BOther repairsRefit upper and lower window sashes lower level in the 1st room from eastIssued Dec 5, 2024 · fix by Jan 9, 2025 overdue · Violation #17508749
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall upper level in the bathroomIssued Dec 5, 2024 · fix by Jan 9, 2025 overdue · Violation #17508754
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft inside wall cabinet at north in the kitchenIssued Oct 16, 2024 · fix by Nov 20, 2024 overdue · Violation #17350201
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at north wall in the kitchenIssued Oct 16, 2024 · fix by Nov 20, 2024 overdue · Violation #17350199
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at ceiling and east wall in the kitchenIssued Oct 15, 2024 · fix by Nov 10, 2024 overdue · Violation #17343844
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at 4th public hallway door from west at 4th storyIssued Aug 26, 2024 · fix by Sep 9, 2024 overdue · Violation #17202507
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at west bulkhead door at 6th story roofIssued Aug 26, 2024 · fix by Sep 9, 2024 overdue · Violation #17202522
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to room with fire escape window in the 4th room from north at westIssued Aug 19, 2024 · fix by Aug 25, 2024 overdue · Violation #17199401
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock at door at building entrance , 1st storyIssued Aug 19, 2024 · fix by Aug 25, 2024 overdue · Violation #17199406
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and south walls at lower level in the 1st room from northIssued Aug 12, 2024 · fix by Sep 16, 2024 overdue · Violation #17183907
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 12, 2024 · fix by Sep 7, 2024 overdue · Violation #17183903
- BOther repairsProperly repair with similar material the broken or defective hardwood floor in the private hallwayIssued Aug 12, 2024 · fix by Sep 16, 2024 overdue · Violation #17183902
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 12, 2024 · fix by Sep 7, 2024 overdue · Violation #17183906
- COther repairsProperly repair or replace the broken or defective spring balance at lower sash at lower level in the 1st room from northIssued Aug 12, 2024 · fix by Aug 18, 2024 overdue · Violation #17183901
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 8, 2024 · fix by Aug 22, 2024 overdue · Violation #17171170
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.