Housing violations · Norwood
111 East Mosholu Parkway North, Bronx
10467 · 63 apartments · 6 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs5
- Mold5
- Lead paint5
- Roaches4
- Plumbing, sinks and toilets3
- Leaks and water damage3
- Peeling paint and plaster3
- Missing smoke or CO detector2
- Mice or rats2
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 13 closed · NYC typical: 87 days
from 29 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPlumbing, sinks and toiletsRepair the broken or defective connection waste line at sink in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352800
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 3rd room from northIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19352792
- COther repairsProperly repair or replace the broken or defective wired glass pane at lower sash window at west wall intermediary landing at public hall, 3rd story, section…Issued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19352802
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base cabinets at sink in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352799
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352798
- BBroken doors or locksProperly repair or replace the broken or defective door at entrance in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352797
- COther repairsProperly repair or replace the broken or defective inner glass pane at lower sash window 1st from south at west wall in the 3rd room from northIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19352796
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall and south wall in the 3rd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352795
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at 1st window frame from south at west wall in the 3rd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352794
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at sink in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352801
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 3rd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352793
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19170109
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19170107
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19170108
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19170110
- BOther repairsProperly repair or replace the broken or defective buzzer and intercom return system from vestibule up to panel on west wall in the kitchenIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18593232
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall and west wall in the bathroomIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18514751
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Aug 18, 2025 · fix by Sep 11, 2025 overdue · Violation #18172031
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 18, 2025 · fix by Sep 11, 2025 overdue · Violation #18171962
- BMoldTrace and repair the source and abate the visible mold condition less than 30 sq ft at the south wall and west wall in the 3rd room from northIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18162596
- BMoldTrace and repair the source and abate the visible mold condition aprox. 14 sq.ft. at south wall in the bathroomIssued Mar 24, 2021 · fix by Apr 28, 2021 overdue · Violation #14085441
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 12, 2020 · fix by Sep 7, 2020 overdue · Violation #13760857
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 12, 2020 · fix by Sep 7, 2020 overdue · Violation #13760855
- BMoldTrace and repair the source and abate the nuisance consisting of mold and mildew approx 10 sq ft at south wall in the bathroomIssued Mar 8, 2018 · fix by Apr 12, 2018 overdue · Violation #12274304
- BMice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Nov 20, 2017 · fix by Dec 25, 2017 overdue · Violation #12078776
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Nov 20, 2017 · fix by Dec 25, 2017 overdue · Violation #12078775
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Aug 1, 2016 · fix by Sep 5, 2016 overdue · Violation #11327738
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 28, 2012 · fix by Dec 24, 2012 overdue · Violation #9653014
- CLead paintSection 27-2056.6 adm code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated…Issued Nov 28, 2012 · fix by Dec 24, 2012 overdue · Violation #9653015
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 1, 2010 · fix by Mar 27, 2010 overdue · Violation #8300619
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.