Housing violations · Mount Hope
1774 Eastburn Avenue, Bronx
10457 · 41 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
16 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs63
- Peeling paint and plaster51
- Leaks and water damage42
- Broken doors or locks33
- Roaches29
- Lead paint27
- Plumbing, sinks and toilets20
- Mold15
- Missing smoke or CO detector15
- Mice or rats11
- Electrical problems2
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 78 closed · NYC typical: 87 days
from 158 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- COther repairsProperly repair or replace the broken or defective spring balance at lower window,sash at east wall in the 2nd room from northIssued Nov 16, 2026 · Violation #19383289
- COther repairsProperly repair or replace the broken or defective spring balance at lower window sash window at south wall in the 2nd room from northIssued Nov 16, 2026 · Violation #19383290
- COther repairsProperly repair or replace the broken or defective spring balance at both lower window,sash east wall in the 1st room from northIssued Nov 16, 2026 · Violation #19383285
- COther repairsProperly repair or replace the broken or defective spring balance at lower window sash window at south wall in the bathroomIssued Nov 16, 2026 · Violation #19383291
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd balcony 2nd fire escape at west exterior wall…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19220842
- BOther repairsDiscontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, in the entire apartmentIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · rent impairing · Violation #19174328
- BPlumbing, sinks and toiletsDiscontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections creating a full bathroom and kitchen in the entire…Issued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19174333
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 10, 2026 · fix by Oct 6, 2026 overdue · Violation #19172494
- BOther repairsM/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition illegal basement…Issued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19173199
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at bulkhead door , 5th story, section ''south''Issued Sep 1, 2026 · fix by Sep 15, 2026 overdue · Violation #19174579
- CLeaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Sep 1, 2026 · fix by Sep 7, 2026 overdue · rent impairing · Violation #19174568
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Sep 1, 2026 · fix by Sep 7, 2026 overdue · Violation #19174565
- CLeaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from eastIssued Sep 1, 2026 · fix by Sep 7, 2026 overdue · rent impairing · Violation #19174564
- COther repairsProperly repair or replace the broken or defective covering at entire roofIssued Sep 1, 2026 · fix by Sep 7, 2026 overdue · Violation #19174582
- CMoldTrace and repair the source and abate the visible mold condition at ceiling and east wall in the bathroomIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19174562
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenIssued Sep 1, 2026 · fix by Sep 7, 2026 overdue · Violation #19174570
- COther repairs& 309 m/d law abate the nuisance consisting of storage gas motorcycle at tank room at cellarIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19172434
- COther repairs& 309 m/d law abate the nuisance consisting of storage gas motorcycle at rear yardIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19172446
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19095310
- BMoldTrace and repair the source and abate the visible mold condition at east wall aprox 4sq feet in the bathroomIssued Jun 23, 2026 · fix by Jul 28, 2026 overdue · Violation #19032637
- BPlumbing, sinks and toiletsProperly secure the loose wash basin at north wall in the bathroomIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18664740
- CPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Feb 23, 2026 · fix by Mar 1, 2026 overdue · rent impairing · Violation #18664741
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 23, 2026 · fix by Mar 1, 2026 overdue · Violation #18664734
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18664742
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Feb 23, 2026 · fix by Mar 1, 2026 overdue · Violation #18664739
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18608516
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18608518
- BBroken doors or locksProperly repair or replace the broken or defective door frame casing and jamb in the bathroomIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18608515
- CLeaks and water damageRepair the leaky and/or defective faucets at kitchen sink in the kitchenIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18464941
- COther repairsProperly repair or replace the broken or defective base cabinet at east wall in the kitchenIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18464902
- COther repairsProperly repair or replace the broken or defective vinyl tiles at floor in the kitchenIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18464908
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 3rd room from northIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18464913
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the private hallwayIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18464959
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18464896
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18464893
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and walls in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18464933
- COther repairsProperly repair or replace the broken or defective sub floor in the kitchenIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18464905
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 28, 2025 · fix by Dec 24, 2025 overdue · Violation #18464945
- CPlumbing, sinks and toiletsRepair the broken or defective connection at waste line under the sink in the kitchenIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18464900
- CLeaks and water damageRepair the broken or defective connection water leak at waste line under the sink in the bathroomIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18464927
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 2nd room from northIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18464912
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 28, 2025 · fix by Dec 24, 2025 overdue · Violation #18464946
- CLeaks and water damageRepair the leaky and/or defective faucets faucet at bathtub in the bathroomIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18464952
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18464953
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in closet in the private hallwayIssued Nov 7, 2025 · fix by Dec 12, 2025 overdue · Violation #18358814
- BOther repairsProperly repair or replace the broken or defective counter balance upper sash at north window west wall in the 4th room from eastIssued Nov 7, 2025 · fix by Dec 12, 2025 overdue · Violation #18358811
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 7, 2025 · fix by Dec 3, 2025 overdue · Violation #18358817
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock at door to fire escape window in the 1st room from northIssued Oct 2, 2025 · fix by Oct 8, 2025 overdue · Violation #18268804
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective entire wood sink cabinet in the kitchenIssued Oct 2, 2025 · fix by Oct 8, 2025 overdue · Violation #18268796
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 2, 2025 · fix by Oct 16, 2025 overdue · Violation #18268741
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock at door to fire escape window in the 1st room from northIssued Oct 2, 2025 · fix by Oct 8, 2025 overdue · Violation #18268751
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 2, 2025 · fix by Oct 16, 2025 overdue · Violation #18268768
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 2, 2025 · fix by Oct 28, 2025 overdue · Violation #18268781
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket seal on refrigerator lower door in the kitchenIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18268789
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock at door to room to fire escape window in the 1st room from northIssued Sep 26, 2025 · fix by Oct 2, 2025 overdue · Violation #18253023
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 26, 2025 · fix by Oct 22, 2025 overdue · Violation #18252997
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 26, 2025 · fix by Oct 10, 2025 overdue · Violation #18253015
- BBroken doors or locksProperly repair or replace the broken or defective intercom system from buiding entrance door toIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18253011
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 25, 2025 · fix by Oct 21, 2025 overdue · Violation #18253031
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel at bathtub in the bathroomIssued Sep 19, 2025 · fix by Oct 24, 2025 overdue · Violation #18238324
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.