Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (North)

222 Bradhurst Avenue, Manhattan

10039 · 19 apartments · 6 stories · City Council district 9

By · Updated · Data from NYC HPD

C
52open immediately hazardous violations · 274 per 100 apartments
B133Hazardous, open
A64Non-hazardous, open
!248Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

41 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyCentral Harlem Bradhurst Corp.
Landlord (head officer or owner)Thomasina White

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    68
  2. Leaks and water damage
    55
  3. Other repairs
    48
  4. Broken doors or locks
    22
  5. Mold
    21
  6. Mice or rats
    10
  7. Missing smoke or CO detector
    8
  8. Roaches
    7
  9. Electrical problems
    7
  10. Plumbing, sinks and toilets
    3
  11. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C91 days
from 37 closed · NYC typical: 87 days
B119 days
from 21 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective defective door hinges in the entranceIssued Jul 29, 2026 · fix by Aug 12, 2026 overdue · Violation #19111948
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Feb 23, 2026 · fix by Mar 9, 2026 overdue · Violation #18659341
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Feb 23, 2026 · fix by Mar 1, 2026 overdue · Violation #18659340
  • B
    Broken doors or locksRefit wood door at entrance in the 3rd room from north at eastIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18510242
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from north at eastIssued Dec 26, 2025 · fix by Jan 1, 2026 overdue · Violation #18510241
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling at buklhead, roofIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18510249
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north at eastIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18510246
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective upper cabinet above sink in the kitchenIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18510244
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from north at eastIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · rent impairing · Violation #18510245
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Nov 18, 2025 · fix by Dec 23, 2025 overdue · Violation #18395199
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the 4th room from eastIssued Nov 18, 2025 · fix by Dec 23, 2025 overdue · Violation #18395200
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the 1st bathroom from eastIssued Nov 18, 2025 · fix by Dec 23, 2025 overdue · Violation #18395201
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqft at ceiling in the 2nd bathroom from eastIssued Nov 12, 2025 · fix by Dec 17, 2025 overdue · Violation #18366653
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqft at window header in the 4th room from eastIssued Nov 12, 2025 · fix by Dec 17, 2025 overdue · Violation #18366649
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqft at window header in the 1st room from eastIssued Nov 12, 2025 · fix by Dec 17, 2025 overdue · Violation #18366650
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18279239
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Oct 14, 2025 · fix by Oct 20, 2025 overdue · Violation #18279242
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from northIssued Oct 14, 2025 · fix by Oct 20, 2025 overdue · Violation #18279237
  • B
    Other repairsProperly repair or replace the broken or defective mechanical ventlation system at ceiling in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18279240
  • B
    Broken doors or locksRefit the door at entrance in the 2nd room from northIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18279235
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18279245
  • B
    Leaks and water damageRepair the roof so that it will not leak above ceiling in the 4th room from northIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · rent impairing · Violation #18279236
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 7, 2025 · fix by Nov 2, 2025 overdue · Violation #18279244
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2025 · fix by Nov 2, 2025 overdue · Violation #18279243
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Jul 21, 2025 · fix by Aug 25, 2025 overdue · Violation #18101187
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jul 21, 2025 · fix by Aug 25, 2025 overdue · Violation #18101175
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the 4th room from eastIssued Jul 21, 2025 · fix by Aug 25, 2025 overdue · rent impairing · Violation #18101184
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the 1st room from eastIssued Jul 21, 2025 · fix by Aug 25, 2025 overdue · rent impairing · Violation #18101172
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material ceiling at bulkhead roofIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18098625
  • B
    Leaks and water damageRepair the roof so that it will not leak obove ceiling at bulkhead roofIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · rent impairing · Violation #18099040
  • B
    Leaks and water damageRepair the roof so that it will not leak above window header at north wall in the 1st room from eastIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · rent impairing · Violation #18091822
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 2nd bathroom from eastIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18098348
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st bathroom from eastIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18098350
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd bathroom from eastIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18098351
  • B
    Other repairsProperly repair or replace the broken or defective mechanical vent at ceiling in the kitchenIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18090961
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 15, 2025 · fix by Aug 10, 2025 overdue · Violation #18090998
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 15, 2025 · fix by Jul 29, 2025 overdue · Violation #18091629
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entire apartmentIssued Jul 15, 2025 · fix by Jul 29, 2025 overdue · Violation #18098527
  • B
    Leaks and water damageRepair the roof so that it will not leak above window header at north wall in the 4th room from eastIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · rent impairing · Violation #18091798
  • B
    Leaks and water damageRepair the roof so that it will not leak above ceiling in the bathroomIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · rent impairing · Violation #18091829
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18091833
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18091834
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18098402
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18098400
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18097890
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18097892
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 8 sq ft at ceiling and 1 sq ft at south wall in the bathroomIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18088972
  • B
    MoldTrace and repair the source and abate the visible mold condition less than ten square feet d at ceiling and north wall in the 3rd room from northIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18088973
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Jun 18, 2025 · fix by Jul 2, 2025 overdue · Violation #18043850
  • C
    MoldTrace and repair the source and abate the visible mold condition 10 sq ft at ceiling in the 2nd bathroom from northIssued Jun 18, 2025 · fix by Jul 14, 2025 overdue · Violation #18044745
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the foyerIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17749990
  • B
    Leaks and water damageRepair the roof so that it will not leak ceiling at 1st public hall bulkhead from northIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · rent impairing · Violation #17750131
  • B
    Other repairsReplace with new the missing newel post cap at bannister at public hall, 5th storyIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17750130
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet cover at west wall in the 4th room from northIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17750129
  • B
    Broken doors or locksProperly repair or replace the broken or defective entrance door in the 4th room from northIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17750128
  • B
    Broken doors or locksProperly repair or replace the broken or defective entrance door in the 2nd room from northIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17750127
  • B
    Broken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from northIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17750126
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 12, 2025 · fix by Apr 7, 2025 overdue · Violation #17750124
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 12, 2025 · fix by Apr 7, 2025 overdue · Violation #17750123
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Mar 12, 2025 · fix by Mar 18, 2025 overdue · Violation #17750125

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

22017
42019
32020
102021
372022
812023
802024
1332025
132026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 412 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.