Housing violations · St. George-New Brighton
216 Jersey Street, Staten Island
10301 · 20 apartments · 2 stories · City Council district 49
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster45
- Broken doors or locks23
- Other repairs20
- Electrical problems19
- Missing smoke or CO detector15
- Mice or rats11
- Leaks and water damage9
- Mold7
- Plumbing, sinks and toilets7
- Roaches6
- No heat or hot water4
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 12 closed · NYC typical: 87 days
from 2 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at north wall in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376686
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19001203
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19001205
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Jun 12, 2026 · fix by Jun 18, 2026 overdue · Violation #18995248
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from northIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812238
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812241
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of slidebolt capable of padlock at door in the entranceIssued Apr 27, 2026 · fix by May 3, 2026 overdue · Violation #18812242
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812245
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 4th room from eastIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812249
- CLeaks and water damageRepair the leaky and/or defective water supply pipe under washbasin in the bathroomIssued Apr 27, 2026 · fix by May 3, 2026 overdue · rent impairing · Violation #18812243
- CPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at washbasin in the bathroomIssued Apr 27, 2026 · fix by May 3, 2026 overdue · rent impairing · Violation #18812244
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 3rd room from northIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812239
- BPlumbing, sinks and toiletsProperly secure the loose washbasin in the 1st bathroom from northIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812236
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 4th room from northIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812240
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812234
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the private hallwayIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812248
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from eastIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812246
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812230
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 27, 2026 · fix by May 23, 2026 overdue · Violation #18812231
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812233
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812235
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyerIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18812237
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 13, 2026 · fix by Apr 8, 2026 overdue · Violation #18703305
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at washbasin in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · rent impairing · Violation #18703303
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 13, 2026 · fix by Apr 8, 2026 overdue · Violation #18703302
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 13, 2026 · fix by Apr 8, 2026 overdue · Violation #18703301
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18703304
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from eastIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18703300
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18703298
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18703297
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 27, 2025 · fix by Sep 22, 2025 overdue · Violation #18185441
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 27, 2025 · fix by Sep 22, 2025 overdue · Violation #18185442
- COther repairsProperly repair with similar material the broken or defective ceramic tile at floor in the kitchenIssued Aug 27, 2025 · fix by Sep 2, 2025 overdue · Violation #18185440
- BOther repairsProperly repair with similar material the broken or defective vinyl tile at floor in the foyerIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18185439
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and north walls in the foyerIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18185438
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyerIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049998
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 27, 2025 · fix by Jul 23, 2025 overdue · Violation #18048964
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in the 1st bathroom from northIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18050000
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 27, 2025 · fix by Jun 26, 2025 overdue · rent impairing · Violation #18049995
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jun 27, 2025 · fix by Jul 3, 2025 overdue · Violation #18049996
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 27, 2025 · fix by Jun 25, 2025 overdue · rent impairing · Violation #18048962
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and east walls in the 1st room from eastIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049997
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Jun 27, 2025 · fix by Jul 3, 2025 overdue · Violation #18048963
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued May 22, 2025 · fix by Jun 26, 2025 overdue · Violation #17913804
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 22, 2025 · fix by Jun 17, 2025 overdue · Violation #17913805
- CMoldTrace and repair the source and abate the visible mold condition approx 10 sq ft at ceiling ininside closet at east wall in the 4th room from east at northIssued May 22, 2025 · fix by Jun 17, 2025 overdue · Violation #17919507
- CMoldTrace and repair the source and abate the visible mold condition approx 10sq ft at ceiling inside closet at east wall in the 4th room from east at northIssued May 22, 2025 · fix by Jun 17, 2025 overdue · Violation #17919508
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued May 22, 2025 · fix by Jun 26, 2025 overdue · Violation #17913803
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 22, 2025 · fix by Jun 17, 2025 overdue · Violation #17913813
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket at refrigerator door in the kitchenIssued May 22, 2025 · fix by Jun 26, 2025 overdue · Violation #17913809
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued May 22, 2025 · fix by Jun 26, 2025 overdue · Violation #17913807
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 22, 2025 · fix by Jun 17, 2025 overdue · Violation #17913806
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17862645
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the bathroomIssued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17862643
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchenIssued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17862646
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from east at southIssued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17862647
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17862648
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the 4th room from eastIssued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17862650
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 1st room from east at northIssued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17862642
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the private hallwayIssued May 2, 2025 · fix by Jun 6, 2025 overdue · Violation #17862641
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.