Housing violations · St. George-New Brighton
336 Jersey Street, Staten Island
10301 · 14 apartments · 2 stories · City Council district 49
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster25
- Roaches16
- Broken doors or locks13
- Other repairs10
- Mice or rats10
- Mold6
- No heat or hot water5
- Missing smoke or CO detector5
- Plumbing, sinks and toilets5
- Leaks and water damage2
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 42 closed · NYC typical: 87 days
from 44 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairs& 309 m/d law abate the nuisance consisting of heating system is on and generating heat in the entire apartmentIssued Jun 18, 2026 · fix by Jul 23, 2026 overdue · Violation #19008969
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Mar 30, 2026 · fix by Apr 5, 2026 overdue · Violation #18743422
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 30, 2026 · fix by Mar 29, 2026 overdue · rent impairing · Violation #18743423
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartmentIssued Mar 17, 2026 · fix by Mar 23, 2026 overdue · Violation #18716178
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18628992
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18629005
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from eastIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18629004
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 10, 2026 · fix by Mar 8, 2026 overdue · Violation #18628993
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18629003
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18629006
- BElectrical problemsProperly secure the loose electrical outlet at north wall in the bathroomIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18628997
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Feb 10, 2026 · fix by Feb 24, 2026 overdue · Violation #18629007
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding allowable temp of 130 degrees in the kitchenIssued Sep 3, 2025 · fix by Sep 9, 2025 overdue · Violation #18168118
- BLeaks and water damageRepair the leaky and/or defective faucets wash basin in the 1st bathroom from northIssued Sep 3, 2025 · fix by Oct 8, 2025 overdue · Violation #18168119
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 3, 2025 · fix by Oct 8, 2025 overdue · Violation #18168120
- BOther repairsProperly repair with similar material the broken or defective wood subfloor in the 1st room from eastIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18169787
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 21, 2025 · fix by Sep 16, 2025 overdue · Violation #18169778
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 21, 2025 · fix by Sep 16, 2025 overdue · Violation #18169779
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartmentIssued Aug 21, 2025 · fix by Aug 27, 2025 overdue · Violation #18169777
- BOther repairsProperly repair with similar material the broken or defective vinyl tile at floor in the 1st room from eastIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18169786
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 20, 2025 · fix by Sep 15, 2025 overdue · Violation #18168122
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 20, 2025 · fix by Sep 15, 2025 overdue · Violation #18168130
- BOther repairsProperly repair with similar material the broken or defective wood base cabinet drawer at north wall in the kitchenIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168124
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 20, 2025 · fix by Sep 15, 2025 overdue · Violation #18168123
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the 2nd room from north at westIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18168128
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east at southIssued Sep 16, 2024 · fix by Oct 21, 2024 overdue · Violation #17266146
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Sep 16, 2024 · fix by Oct 21, 2024 overdue · Violation #17266149
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st private hallway from eastIssued Sep 16, 2024 · fix by Oct 21, 2024 overdue · Violation #17266147
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east at centerIssued Sep 16, 2024 · fix by Oct 21, 2024 overdue · Violation #17266144
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east at northIssued Sep 16, 2024 · fix by Oct 21, 2024 overdue · Violation #17266145
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 16, 2024 · fix by Oct 12, 2024 overdue · Violation #17266140
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Sep 16, 2024 · fix by Oct 21, 2024 overdue · Violation #17266143
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north, south, and west walls in the 2nd bathroom from northIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17216243
- BMissing smoke or CO detectorRepair or replace the smoke detector that is defective in the entire apartmentIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17216240
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 1st room from eastIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17216244
- BMoldProperly repair with similar material the broken or defective vinyl baseboard molding at north at closet in the 4th room from east at northIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17216237
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 27, 2024 · fix by Sep 22, 2024 overdue · Violation #17216241
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). that is defective in the entire apartmentIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17216239
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 27, 2024 · fix by Sep 22, 2024 overdue · Violation #17216242
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from northIssued Aug 27, 2024 · fix by Sep 2, 2024 overdue · Violation #17216238
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 17, 2024 · fix by Jun 12, 2024 overdue · Violation #16973264
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 4, 2024 · fix by Mar 30, 2024 overdue · Violation #16705741
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 4, 2024 · fix by Mar 30, 2024 overdue · Violation #16705740
- BOther repairsProperly repair with similar material the broken or defective vinyl. floor. tiles in the 1st room from eastIssued Nov 20, 2023 · fix by Dec 25, 2023 overdue · Violation #16393451
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective repair hinges in the entranceIssued Nov 20, 2023 · fix by Dec 4, 2023 overdue · Violation #16393450
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Aug 11, 2023 · fix by Aug 25, 2023 overdue · Violation #16150863
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub and grout between ceramic tiles at north wall in the bathroomIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150852
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150851
- BMoldTrace and repair the source and abate the visible mold condition approx 24 sq ft at ceiling in the bathroomIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150850
- BBroken doors or locksReplace with new the missing handles at entrance door at west wall in the 4th room from east at northIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150859
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroomIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150853
- BBroken doors or locksProperly secure the loose sliding door on bathtub in the bathroomIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150854
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150856
- BBroken doors or locksProperly secure the loose sliding doors on closet at south wall in the private hallwayIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150857
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 4th room from east at northIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150858
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 11, 2023 · fix by Sep 6, 2023 overdue · Violation #16150860
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyerIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150861
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from eastIssued Aug 11, 2023 · fix by Sep 15, 2023 overdue · Violation #16150862
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Jul 3, 2023 · fix by Aug 7, 2023 overdue · Violation #16073090
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from eastIssued Jul 3, 2023 · fix by Aug 7, 2023 overdue · Violation #16073095
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.