Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Soundview-Bruckner-Bronx River

1151 Elder Avenue, Bronx

10472 · 49 apartments · 5 stories · City Council district 17

By · Updated · Data from NYC HPD

C
34open immediately hazardous violations · 69 per 100 apartments
B43Hazardous, open
A14Non-hazardous, open
!90Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company1151 ELDER HLDG LLC
Landlord (head officer or owner)Joseph Friedman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    18
  2. Lead paint
    14
  3. Missing smoke or CO detector
    10
  4. Peeling paint and plaster
    9
  5. Broken doors or locks
    9
  6. Mice or rats
    8
  7. Mold
    5
  8. Roaches
    5
  9. Leaks and water damage
    5
  10. Electrical problems
    4
  11. No heat or hot water
    2
  12. Bedbugs
    1
  13. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C81 days
from 72 closed · NYC typical: 87 days
B109 days
from 98 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19141095
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19141094
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19141093
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19141096
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19141092
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19141097
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the bathroomIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19124037
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Jul 28, 2026 · fix by Aug 1, 2026 overdue · Violation #19106644
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jul 28, 2026 · fix by Aug 1, 2026 overdue · Violation #19106645
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984593
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 8, 2026 · fix by Jul 4, 2026 overdue · Violation #18984594
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984595
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 8, 2026 · fix by Jul 4, 2026 overdue · Violation #18984596
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective closure arm at west vestibule door , 1st storyIssued May 28, 2026 · fix by Jun 11, 2026 overdue · Violation #18960488
  • B
    Other repairsProperly repair or replace the broken or defective glass window pane at lower sash in the 1st room from northIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18908892
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18908893
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the bathroomIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18908897
  • B
    Other repairsProperly repair or replace the broken or defective upper and lower cabinet at north wall in the kitchenIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18908894
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18908901
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 11, 2026 · fix by Jun 6, 2026 overdue · Violation #18908903
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical wall switch at east wall in the 1st room from northIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18908902
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18908899
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 2nd room from northIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18908900
  • C
    Other repairsProperly repair with similar material the broken or defective parka floor causing a cut hazard in the 2nd room from northIssued Apr 17, 2026 · fix by Apr 23, 2026 overdue · Violation #18790854
  • C
    Other repairsProperly repair or replace the broken or defective defective window at north wall, in the bathroomIssued Apr 17, 2026 · fix by Apr 23, 2026 overdue · Violation #18790859
  • C
    Other repairsProperly repair with similar material the broken or defective wooden subfloors rotten in the 2nd room from northIssued Apr 17, 2026 · fix by Apr 23, 2026 overdue · Violation #18790851
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building vestibule , 1st storyIssued Mar 18, 2026 · fix by Apr 1, 2026 overdue · Violation #18717641
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 25, 2025 · fix by Nov 25, 2025 overdue · rent impairing · Violation #18429227
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 27, 2025 · fix by Sep 22, 2025 overdue · Violation #18194174
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 26, 2025 · fix by Sep 21, 2025 overdue · Violation #18176802
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq.ft at ceiling in the bathroomIssued Jun 2, 2025 · fix by Jun 28, 2025 overdue · Violation #17936580
  • C
    Electrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued Jan 27, 2025 · fix by Jan 25, 2025 overdue · Violation #17645253
  • C
    Other repairsProvide glass at west 2 window pane at public hall, 1st storyIssued Dec 4, 2024 · fix by Dec 10, 2024 overdue · Violation #17498157
  • C
    Other repairsProvide glass at west 1 window pane at public hall, 1st storyIssued Dec 4, 2024 · fix by Dec 10, 2024 overdue · Violation #17498156
  • C
    Other repairsProvide glass at west 4 window pane at public hall, 1st storyIssued Dec 4, 2024 · fix by Dec 10, 2024 overdue · Violation #17498159
  • C
    Other repairsProvide glass at west 3 window pane at public hall, 1st storyIssued Dec 4, 2024 · fix by Dec 10, 2024 overdue · Violation #17498158
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). inoperable in the entire apartmentIssued Oct 16, 2024 · fix by Nov 20, 2024 overdue · Violation #17350297
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector inoperable in the entire apartmentIssued Oct 16, 2024 · fix by Nov 20, 2024 overdue · Violation #17350298
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Sep 18, 2024 · fix by Sep 22, 2024 overdue · Violation #17285021
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Sep 18, 2024 · fix by Sep 22, 2024 overdue · Violation #17285022
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at bulkhead door 5th story roof [ north section ]Issued Feb 26, 2024 · fix by Mar 11, 2024 overdue · Violation #16683452
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 9, 2024 · fix by Mar 6, 2024 overdue · Violation #16644807
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 9, 2024 · fix by Mar 6, 2024 overdue · Violation #16644806
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 28, 2023 · fix by Dec 28, 2023 overdue · rent impairing · Violation #16548362
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 14, 2023 · fix by Jan 9, 2024 overdue · Violation #16519810
  • C
    MoldTrace and repair the source and abate the visible mold condition sixty square feet at ceiling in the 1st room from north at eastIssued Oct 18, 2023 · fix by Nov 13, 2023 overdue · Violation #16313851
  • C
    RoachesAbate the infestation consisting of roachesIssued Jun 3, 2019 · fix by Jun 24, 2019 overdue · Violation #13101074
  • B
    Broken doors or locksArrange and make self-closing the doors at apartment entry in the entranceIssued Aug 27, 2018 · fix by Oct 1, 2018 overdue · Violation #12547224
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at westIssued Aug 27, 2018 · fix by Oct 1, 2018 overdue · Violation #12547205
  • B
    Broken doors or locksArrange and make self-closing the doors ,, in the entranceIssued Aug 27, 2018 · fix by Oct 1, 2018 overdue · Violation #12542424
  • C
    Leaks and water damageRepair the roof so that it will not leak from the ceilingIssued Jul 26, 2018 · fix by Aug 3, 2018 overdue · rent impairing · Violation #12494593
  • B
    Electrical problemsProperly repair the broken or defective electrical ceiling light fixture in the 2nd room from north at eastIssued Jun 13, 2018 · fix by Jul 18, 2018 overdue · Violation #12423770
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak east wall around windows in the 2nd room from north at eastIssued Jun 13, 2018 · fix by Jul 18, 2018 overdue · Violation #12423769
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of lockable slidebolt installed at door in the entranceIssued Jun 11, 2018 · fix by Jun 19, 2018 overdue · Violation #12423762
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Apr 9, 2018 · fix by May 14, 2018 overdue · Violation #12326599
  • B
    Broken doors or locksArrange and make self-closing the doors in the entranceIssued Apr 9, 2018 · fix by May 14, 2018 overdue · Violation #12326594
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Apr 9, 2018 · fix by May 14, 2018 overdue · Violation #12326596
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missingIssued Apr 9, 2018 · fix by May 14, 2018 overdue · Violation #12326598
  • B
    Mice or ratsAbate the nuisance consisting of miceIssued Oct 16, 2017 · fix by Nov 20, 2017 overdue · Violation #12018155
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Jun 16, 2017 · fix by Jul 21, 2017 overdue · Violation #11830711

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

1182017
1682018
232019
192021
142022
812023
532024
422025
902026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 881 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.