Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · University Heights (South)-Morris Heights

120 Featherbed Lane, Bronx

10452 · 28 apartments · 5 stories · City Council district 14

By · Updated · Data from NYC HPD

C
13open immediately hazardous violations · 46 per 100 apartments
B9Hazardous, open
A1Non-hazardous, open
!23Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyFEATHERBED HOLDINGS II LLC
Landlord (head officer or owner)Adi Joseph

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Lead paint
    9
  2. Broken doors or locks
    5
  3. Other repairs
    3
  4. Mice or rats
    2
  5. No heat or hot water
    1
  6. Leaks and water damage
    1
  7. Peeling paint and plaster
    1
  8. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 14 closed · NYC typical: 87 days
B116 days
from 27 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Lead paintProperly repair or replace the broken or defective key operated lock installed at building entrance door leading to 1st story public hallIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18979234
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of electromagnetic locking device installed at building entrance door leading to 1st story public hallIssued Jun 4, 2026 · fix by Jun 10, 2026 overdue · Violation #18979233
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jan 22, 2026 · fix by Feb 5, 2026 overdue · Violation #18587319
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges to door at 1st public hall bulkhead from north, 5th storyIssued Dec 31, 2025 · fix by Jan 14, 2026 overdue · Violation #18538688
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees in the entire apartmentIssued Dec 31, 2025 · fix by Jan 6, 2026 overdue · Violation #18538687
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak east wall and ceiling in the 2nd room from eastIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17910630
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall and ceiling in the 2nd room from eastIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17910629
  • C
    Broken doors or locksRemove the illegal fastening consisting of magnetic locking device at building entrance door , 1st storyIssued Jul 29, 2024 · fix by Aug 4, 2024 overdue · rent impairing · Violation #17148568
  • B
    Broken doors or locksProvide in the event of a power outage by means of an acceptiable mechanical heaby duty lock and latch set at building street entrance door , 1st storyIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17148571
  • B
    Other repairsProperly repair or replace the broken or defective window lintils at 3rd and 7th window from east at north facade of the building , 4th storyIssued May 10, 2024 · fix by Jun 14, 2024 overdue · Violation #16968246
  • B
    Other repairsProperly repair or replace the broken or defective return buzzer/intercom system from building entrance to north wall in the private hallwayIssued May 10, 2024 · fix by Jun 14, 2024 overdue · Violation #16953023
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at north and south bulkhead doors , 5th storyIssued May 6, 2024 · fix by May 20, 2024 overdue · Violation #16953043
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Feb 25, 2014 · fix by Apr 1, 2014 overdue · Violation #10148228
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Oct 3, 2013 · fix by Nov 7, 2013 overdue · Violation #9986130
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Jul 8, 2013 · fix by Aug 12, 2013 overdue · Violation #9891331
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling and east wall 3rd sty southIssued Aug 24, 1999 · fix by Sep 13, 1999 overdue · Violation #589490
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling north south east and west walls 3rd sty southIssued Aug 24, 1999 · fix by Sep 13, 1999 overdue · Violation #589486
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling north south and east walls steam riser and door 3rd sty southIssued Aug 24, 1999 · fix by Sep 13, 1999 overdue · Violation #589487
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling east and north walls 3rd sty southIssued Aug 24, 1999 · fix by Sep 13, 1999 overdue · Violation #589488
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling and west wall 3rd sty southIssued Aug 24, 1999 · fix by Sep 13, 1999 overdue · Violation #589489
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling north wall window stools door south room 3rd sty southIssued Aug 17, 1999 · fix by Sep 6, 1999 overdue · Violation #589499
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint plaster ceiling steam riser bathroom 3rd sty southIssued Aug 17, 1999 · fix by Sep 6, 1999 overdue · Violation #589500

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

592017
52018
62019
182020
12021
312022
12023
322024
362025
142026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 378 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.