Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · St. George-New Brighton

141 St Marks Place, Staten Island

10301 · 43 apartments · 5 stories · City Council district 49

By · Updated · Data from NYC HPD

C
26open immediately hazardous violations · 60 per 100 apartments
B61Hazardous, open
A19Non-hazardous, open
!74Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning company141 LG LLC
Managed byU.S.REALTY CORP

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    26
  2. Peeling paint and plaster
    15
  3. Broken doors or locks
    12
  4. Plumbing, sinks and toilets
    10
  5. Lead paint
    10
  6. Roaches
    7
  7. Mold
    6
  8. Leaks and water damage
    5
  9. Missing smoke or CO detector
    5
  10. Mice or rats
    5
  11. Missing window guards
    2
  12. Bedbugs
    2
  13. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C35 days
from 33 closed · NYC typical: 84 days
B115 days
from 47 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairs& 309 m/d law abate the nuisance consisting of uncapped radiator shut off valve at north wall in the 2nd room from north at eastNotice not sent yet · Violation #19378348
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles in the kitchenNotice not sent yet · Violation #19378347
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastNotice not sent yet · Violation #19378344
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayNotice not sent yet · Violation #19378345
  • B
    Broken doors or locksProperly repair or replace the broken or defective wall cabinet doors at north wall in the kitchenNotice not sent yet · Violation #19378346
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentNotice not sent yet · Violation #19378349
  • B
    Other repairsProperly repair with similar material the broken or defective wood tile at floor in the 1st room from north at eastIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369298
  • B
    Other repairsProperly repair with similar material the broken or defective wood tile at floor in the 2nd room from northIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369299
  • B
    Broken doors or locksRefit doors on wall cabinet at north wall in the kitchenIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369300
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 13, 2026 · fix by Dec 9, 2026 · Violation #19369301
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369303
  • B
    Plumbing, sinks and toiletsReplace with new the missing stopper at bathtub in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369304
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369305
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tile at floor in the kitchenIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369308
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items on 5th story balcony at 1st fire escape from west…Issued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369309
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items on 2nd story balcony at 2nd fire escape from west…Issued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369310
  • B
    Other repairsProperly repair with similar material the broken or defective wood tile at floor in the 1st room from north at westIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369294
  • B
    Other repairsProperly repair with similar material the broken or defective wood tile at floor in the private hallwayIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369295
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19369296
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 13, 2026 · fix by Dec 9, 2026 · Violation #19369297
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19280741
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19280739
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19280738
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling ceiling in the 3rd room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19271572
  • C
    Broken doors or locksProperly repair or replace the broken or defective glass pane at vestibule door , 1st storyIssued Sep 10, 2026 · fix by Sep 16, 2026 overdue · Violation #19195868
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19195870
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19183324
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq-ft observed at ceiling and south wall in the 2nd private hallway from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19183318
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19183323
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 8, 2026 · fix by Sep 22, 2026 overdue · Violation #19183321
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd private hallway from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19183319
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19183320
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st private hallway from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19183322
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19183325
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19183326
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19183327
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195871
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195872
  • B
    Broken doors or locksProperly repair or replace the broken or defective hinges at closet door in the 5th room from north at eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195876
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19017969
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19017972
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19017974
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city…Issued Jun 22, 2026 · fix by Jul 18, 2026 overdue · Violation #19017981
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at bulkhead door to roof exitIssued Jun 22, 2026 · fix by Jul 6, 2026 overdue · Violation #19017980
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19017971
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19017973
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock at door preventing entrance to fire escape in the 5th room from northIssued Jun 15, 2026 · fix by Jun 21, 2026 overdue · Violation #19010830
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at south at basement at boiler roomIssued Jun 15, 2026 · fix by Jun 29, 2026 overdue · Violation #19010845
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jun 12, 2026 · fix by Jun 16, 2026 overdue · Violation #19004493
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jun 12, 2026 · fix by Jun 16, 2026 overdue · Violation #19004492
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqft at north wall in the bathroomIssued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18914045
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqft at east wall in the bathroomIssued May 8, 2026 · fix by Jun 12, 2026 overdue · Violation #18914046
  • B
    Plumbing, sinks and toiletsReplace with new the missing mechanical water stopper at bathtub in the bathroomIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558061
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel reglaze at bathtub in the bathroomIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558060
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558059
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558058
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tile at floor in the kitchenIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558069
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558068
  • B
    Other repairsProperly repair with similar material the broken or defective caulking between wood baseboard and wood tile at floor at east wall in the 5th room from north at…Issued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558066
  • B
    BedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18558064

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

112017
202019
212021
22022
262023
212024
22025
1572026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 314 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.