Housing violations · Soundview-Bruckner-Bronx River
1121 Fteley Avenue, Bronx
10472 · 4 apartments · 2 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks12
- Other repairs9
- Mold8
- Peeling paint and plaster6
- Mice or rats6
- No heat or hot water6
- Missing smoke or CO detector5
- Roaches3
- Electrical problems2
- Plumbing, sinks and toilets2
- Leaks and water damage2
- Lead paint2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 4 closed · NYC typical: 87 days
from 9 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft ceiling in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19362696
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269028
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at all receptacles and light fixtures in the entire apartmentIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269027
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19057344
- BOther repairsAbate the nuisance consisting of pests. evidence of spiders in the entire apartmentIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19057348
- BBroken doors or locksProperly repair or replace the broken or defective door frame at east in the 4th room from eastIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19057343
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 8, 2026 · fix by Aug 3, 2026 overdue · Violation #19057346
- BBroken doors or locksRefit door at east in the 4th room from eastIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19057342
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19057345
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 8, 2026 · fix by Aug 3, 2026 overdue · Violation #19057347
- BBroken doors or locksReplace with new the missing mortise lock at building entrance door at public hall, 1st storyIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18992072
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 4, 2025 · fix by Dec 30, 2025 overdue · Violation #18479573
- BBroken doors or locksProperly repair or replace the broken or defective door ( off hinges ) in the bathroomIssued Dec 4, 2025 · fix by Jan 8, 2026 overdue · Violation #18479575
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd storyIssued Dec 4, 2025 · fix by Jan 8, 2026 overdue · Violation #18479583
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Dec 4, 2025 · fix by Dec 10, 2025 overdue · Violation #18479570
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st storyIssued Dec 4, 2025 · fix by Jan 8, 2026 overdue · Violation #18479581
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door , 1st storyIssued Dec 4, 2025 · fix by Dec 10, 2025 overdue · Violation #18479577
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Dec 4, 2025 · fix by Jan 8, 2026 overdue · Violation #18479572
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Dec 4, 2025 · fix by Jan 8, 2026 overdue · Violation #18479571
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 4, 2025 · fix by Dec 4, 2025 overdue · rent impairing · Violation #18479569
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at light fixture at ceiling at public hall, 2nd storyIssued Dec 4, 2025 · fix by Jan 8, 2026 overdue · Violation #18479585
- BMoldTrace and repair the source and abate the visible mold condition around the window frames ( approx.1.sq.ft. ) in the 4th room from east at northIssued Mar 7, 2023 · fix by Apr 11, 2023 overdue · Violation #15768791
- BMoldTrace and repair the source and abate the visible mold condition approximately 1 sq.ft at east wall below sink in the kitchenIssued Mar 7, 2023 · fix by Apr 11, 2023 overdue · Violation #15768792
- CMoldTrace and repair the source and abate the visible mold condition approx 20 sq ft of mold at ceiling and 10 at west wall in the bathroomIssued Jan 9, 2023 · fix by Feb 4, 2023 overdue · Violation #15652303
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 5, 2022 · fix by Dec 29, 2022 overdue · Violation #15599645
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 5, 2022 · fix by Dec 29, 2022 overdue · Violation #15599644
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from east at southIssued Jan 27, 2022 · fix by Jan 27, 2022 overdue · rent impairing · Violation #14793851
- BMoldTrace and repair the source and abate the visible mold condition at ceiling(approx 2 sq.ft) in the bathroomIssued Jan 11, 2022 · fix by Feb 15, 2022 overdue · Violation #14776642
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 27, 2021 · fix by Dec 24, 2021 overdue · rent impairing · Violation #14742943
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Dec 27, 2021 · fix by Jan 2, 2022 overdue · Violation #14742944
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 27, 2021 · fix by Jan 22, 2022 overdue · Violation #14749151
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall, north wall in the foyerIssued Dec 27, 2021 · fix by Jan 31, 2022 overdue · Violation #14749152
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 13, 2021 · fix by Oct 9, 2021 overdue · Violation #14547022
- CBroken doors or locksArrange and make self-closing the doors in the entranceIssued Sep 13, 2021 · fix by Oct 9, 2021 overdue · Violation #14547024
- CBroken doors or locksProperly repair the broken or defective mortise lock an entrance apartment door in the entranceIssued Sep 13, 2021 · fix by Sep 19, 2021 overdue · Violation #14547025
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 13, 2021 · fix by Oct 18, 2021 overdue · Violation #14547017
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 13, 2021 · fix by Oct 9, 2021 overdue · Violation #14547021
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from eastIssued Sep 13, 2021 · fix by Oct 18, 2021 overdue · Violation #14547023
- BOther repairsProvide the missing screen under skylight at public hall, 2nd storyIssued Sep 7, 2021 · fix by Oct 12, 2021 overdue · Violation #14530464
- BMoldTrace and repair the source and abate the visible mold condition approx. 8 sq. ft. at the ceiling, window frame from east at south wall in the bathroomIssued Apr 28, 2021 · fix by Jun 2, 2021 overdue · Violation #14312894
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeds maximum allowable temp. of 130 degrees, 136 degrees suppliedIssued Dec 29, 2020 · fix by Jan 4, 2021 overdue · Violation #13961455
- CBroken doors or locksProvide ready access to buildings heating system lock door at the basementIssued Dec 29, 2020 · fix by Jan 4, 2021 overdue · Violation #13961462
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water temperature exceding over 130 f at bathroom and in the kitchen in the entire apartmentIssued Dec 8, 2020 · fix by Dec 14, 2020 overdue · Violation #13925627
- COther repairsCleanse and disinfect to the satisfaction of this department after removing the raw sewage at cellarIssued Nov 16, 2020 · fix by Nov 22, 2020 overdue · rent impairing · Violation #13888867
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 16, 2020 · fix by Dec 12, 2020 overdue · Violation #13888866
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2020 · fix by Nov 28, 2020 overdue · Violation #13876026
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 2, 2020 · fix by Oct 31, 2020 overdue · rent impairing · Violation #13876019
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 2, 2020 · fix by Nov 8, 2020 overdue · Violation #13876020
- COther repairsProperly repair the broken or defective radiator shut off valve. in the 1st room from eastIssued Dec 31, 2018 · fix by Jan 8, 2019 overdue · Violation #12830042
- COther repairsReplace with new the broken or defective radiator shut off valve in the 1st room from east at southIssued Mar 2, 2016 · fix by Mar 10, 2016 overdue · Violation #11132545
- BBroken doors or locksArrange and make self-closing the doors in the entranceIssued Feb 24, 2016 · fix by Mar 30, 2016 overdue · Violation #11126351
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.