Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Soundview-Bruckner-Bronx River

1123 Fteley Avenue, Bronx

10472 · 4 apartments · 2 stories · City Council district 18

By · Updated · Data from NYC HPD

C
8open immediately hazardous violations · 200 per 100 apartments
B36Hazardous, open
A12Non-hazardous, open
!56Past the fix-by date

9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyPhantom Capital 404 LLC
Landlord (head officer or owner)Ronald Kandov

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    21
  2. Leaks and water damage
    7
  3. Peeling paint and plaster
    7
  4. Plumbing, sinks and toilets
    5
  5. Broken doors or locks
    5
  6. Missing smoke or CO detector
    4
  7. No heat or hot water
    2
  8. Bedbugs
    2
  9. Roaches
    1
  10. Electrical problems
    1
  11. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C115 days
from 2 closed · NYC typical: 87 days
B121 days
from 1 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Leaks and water damageRepair the leaky and/or defective faucets (faucet) at sink in the kitchenetteIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18986364
  • B
    Other repairsProperly repair or replace the broken or defective guillotine effect/spring balance (lower sash) at 2nd window from north at east wall in the 1st room from…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18986365
  • B
    Other repairsProperly repair or replace the broken or defective guillotine effect/spring balance (lower sash) at 3rd window from north at east wall in the 1st room from…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18986366
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective broken and rotted(wood) at wash basin vanity (west wall) in the bathroomIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18986361
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18986362
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jun 8, 2026 · fix by Jun 14, 2026 overdue · Violation #18986369
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color horizantal cracking (brick and motar) at east exterior wallIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18986368
  • B
    Other repairsProperly repair with similar material the broken or defective missing/motar (brick and motar) at north exterior wallIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18986367
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinge at door in the entranceIssued Jun 8, 2026 · fix by Jun 22, 2026 overdue · Violation #18986363
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage and rubbish at treads and landing at public hall stairsIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18986378
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective (2)damage / ceramic wall tiles at bathtub in the bathroomIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18986360
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch at building entrance door , 1st storyIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901100
  • B
    Broken doors or locksProperly repair or replace the broken or defective bell buzzer system from the building entrance door to the apartment wall bell panel at north wall in the…Issued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901098
  • C
    Broken doors or locksRemove the illegal double cylinder key operated locking device at door in the entranceIssued May 19, 2025 · fix by May 25, 2025 overdue · Violation #17901097
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901095
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901094
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 19, 2025 · fix by Jun 14, 2025 overdue · Violation #17901093
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901092
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from eastIssued May 19, 2025 · fix by Jun 23, 2025 overdue · rent impairing · Violation #17901091
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall at public hall, 1st storyIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901090
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd storyIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901088
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 2nd storyIssued May 19, 2025 · fix by Jun 23, 2025 overdue · rent impairing · Violation #17901087
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of electrical wires at south wall at public hall, 1st storyIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901086
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction supply, mattress, and food carts yardIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901085
  • B
    Other repairsProperly repair the broken or defective paving yardIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901084
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material around skylight . at 1st public hall bulkhead from east, 2nd storyIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17893540
  • B
    Leaks and water damageRepair the roof so that it will not leak at bulkhead around skylights at 1st public hall bulkhead from east, 2nd storyIssued May 19, 2025 · fix by Jun 23, 2025 overdue · rent impairing · Violation #17893539
  • B
    Other repairsCleanse and disinfect to the satisfaction of this department after removing the building frontIssued Jun 16, 2023 · fix by Jul 21, 2023 overdue · rent impairing · Violation #16045885
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling 2nd story public hallwayIssued Jun 16, 2023 · fix by Jul 21, 2023 overdue · rent impairing · Violation #16045906
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardent material at ceiling 2nd story public hallwayIssued Jun 16, 2023 · fix by Jul 21, 2023 overdue · Violation #16045900
  • B
    Other repairsProperly repair with similar material the broken or defective broken sill 3rd window from north at 2nd story building frontIssued Jun 16, 2023 · fix by Jul 21, 2023 overdue · Violation #16045895
  • B
    Other repairsProperly repair with similar material the broken or defective motar joints at 2nd story building frontIssued Jun 16, 2023 · fix by Jul 21, 2023 overdue · Violation #16045889
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from eastIssued Dec 12, 2022 · fix by Dec 12, 2022 overdue · rent impairing · Violation #15604458
  • B
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at bathtub in the bathroomIssued Feb 23, 2022 · fix by Mar 30, 2022 overdue · rent impairing · Violation #14901751
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection wasteline at sink in the kitchenIssued Feb 23, 2022 · fix by Mar 30, 2022 overdue · Violation #14901752
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Feb 23, 2022 · fix by Mar 30, 2022 overdue · Violation #14901749
  • C
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar at cellarIssued Feb 23, 2022 · fix by Mar 1, 2022 overdue · Violation #14901742
  • C
    Other repairsCleanse and disinfect to the satisfaction of this department after removing the raw sewage at cellarIssued Feb 23, 2022 · fix by Mar 1, 2022 overdue · rent impairing · Violation #14901743
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures at bathttub in the bathroomIssued Feb 23, 2022 · fix by Mar 30, 2022 overdue · rent impairing · Violation #14901750
  • C
    Broken doors or locksProvide ready access to buildings heating system boiler room door locked at basementIssued Jan 12, 2022 · fix by Jan 18, 2022 overdue · Violation #14776920
  • B
    BedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Dec 10, 2019 · fix by Jan 14, 2020 overdue · Violation #13486108
  • B
    Lead paintFire egress defective. make stationary the iron ladder leading to scuttle opening in roof at public hall, 2nd storyIssued Dec 10, 2019 · fix by Jan 14, 2020 overdue · Violation #13486278
  • B
    Plumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued Dec 10, 2019 · fix by Jan 14, 2020 overdue · Violation #13486103
  • B
    BedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Nov 25, 2019 · fix by Dec 30, 2019 overdue · Violation #13468479

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

102017
162019
12020
12021
302022
82023
202025
212026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 124 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.