Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Wakefield-Woodlawn

4305 Furman Avenue, Bronx

10466 · 43 apartments · 6 stories · City Council district 11

By · Updated · Data from NYC HPD

C
26open immediately hazardous violations · 60 per 100 apartments
B32Hazardous, open
A11Non-hazardous, open
!67Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Who owns and manages it

Owning company4305 Furman Avenue Owner LLC
Landlord (head officer or owner)Peter Hungerford

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Lead paint
    29
  2. Other repairs
    16
  3. Peeling paint and plaster
    6
  4. Roaches
    5
  5. Broken doors or locks
    4
  6. Plumbing, sinks and toilets
    2
  7. Mice or rats
    2
  8. Missing smoke or CO detector
    2
  9. Mold
    1
  10. Electrical problems
    1
  11. Leaks and water damage
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C878 days
from 41 closed · NYC typical: 87 days
B685 days
from 54 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsProperly repair or replace the broken or defective cracked glass pane at upper sash window in the kitchenIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19273091
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north at westIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19273095
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19273093
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19273092
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 15, 2026 · fix by May 11, 2026 overdue · Violation #18788012
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 15, 2026 · fix by May 11, 2026 overdue · Violation #18788013
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 sq.f. at ceiling ,north and east walls in the 1st room from east at northIssued Apr 15, 2026 · fix by May 11, 2026 overdue · Violation #18788005
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17870756
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the private hallwayIssued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17870760
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 6, 2025 · fix by Jun 1, 2025 overdue · Violation #17870759
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall and ceiling in the 2nd room from eastIssued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17870762
  • B
    Other repairsProperly repair or replace the broken or defective upper window sash stuck closed at at fire escape window second window from east at south in the 1st room…Issued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17870763
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall ad ceiling in the 2nd room from eastIssued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17870761
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17870757
  • B
    Broken doors or locksProperly repair or replace the broken or defective gasket seal at refrigerator door in the kitchenIssued May 6, 2025 · fix by Jun 10, 2025 overdue · Violation #17870758
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 5, 2025 · fix by May 31, 2025 overdue · Violation #17873997
  • B
    Other repairsProperly repair with similar material the broken or defective hardwood floor in the 4th room from eastIssued Feb 8, 2024 · fix by Mar 14, 2024 overdue · Violation #16654766
  • C
    Other repairsProperly repair with similar material the broken or defective hardwood floor in the private hallwayIssued Feb 7, 2024 · fix by Feb 13, 2024 overdue · Violation #16654764
  • B
    Other repairsProperly repair or replace the broken or defective lower escutcheon plate at steam riser in the bathroomIssued Feb 7, 2024 · fix by Mar 13, 2024 overdue · Violation #16654765
  • B
    Other repairsProperly repair with similar material the broken or defective upper wood cabinet at west wall in the kitchenIssued Feb 7, 2024 · fix by Mar 13, 2024 overdue · Violation #16654763
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 26, 2023 · fix by Jan 21, 2024 overdue · Violation #16541046
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 18, 2023 · fix by Jan 13, 2024 overdue · Violation #16522624
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 18, 2023 · fix by Jan 13, 2024 overdue · Violation #16524756
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 18, 2023 · fix by Jan 13, 2024 overdue · Violation #16524755
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 24, 2023 · fix by Nov 17, 2023 overdue · Violation #16334359
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 24, 2023 · fix by Nov 17, 2023 overdue · Violation #16334358
  • B
    Other repairsProperly repair or replace the broken or defective cabinet at west wall in the kitchenIssued Oct 19, 2023 · fix by Nov 23, 2023 overdue · Violation #16315482
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 18, 2023 · fix by Oct 12, 2023 overdue · Violation #16234202
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 18, 2023 · fix by Oct 12, 2023 overdue · Violation #16234201
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 18, 2023 · fix by Oct 12, 2023 overdue · Violation #16234199
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 18, 2023 · fix by Oct 12, 2023 overdue · Violation #16234196
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 18, 2023 · fix by Oct 12, 2023 overdue · Violation #16234200
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 18, 2023 · fix by Oct 12, 2023 overdue · Violation #16234198
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 18, 2023 · fix by Oct 12, 2023 overdue · Violation #16234197
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 18, 2023 · fix by Oct 12, 2023 overdue · Violation #16234195
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Sep 18, 2023 · fix by Oct 12, 2023 overdue · Violation #16239381
  • C
    Other repairsProperly repair with similar material the broken or defective hardwood floor approximately (1) sq ft in the private hallwayIssued Feb 17, 2023 · fix by Feb 23, 2023 overdue · Violation #15724394
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from eastIssued Feb 1, 2023 · fix by Mar 8, 2023 overdue · Violation #15697805
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Apr 21, 2022 · fix by May 15, 2022 overdue · Violation #15124132
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the kitchenIssued Mar 4, 2022 · fix by Apr 8, 2022 overdue · Violation #14929607
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14425004
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14425003
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14425002
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jul 12, 2021 · fix by Jul 16, 2021 overdue · Violation #14425009
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14425001
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14425000
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14424999
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14424998
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14424997
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14424996
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14425007
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14425006
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 12, 2021 · fix by Aug 16, 2021 overdue · Violation #14425005
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 9, 2021 · fix by Aug 13, 2021 overdue · Violation #14425008
  • B
    Lead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 9, 2021 · fix by Aug 13, 2021 overdue · Violation #14424995
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jun 14, 2021 · fix by Jun 18, 2021 overdue · Violation #14386093
  • B
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 1st room from eastIssued Sep 25, 2020 · fix by Oct 30, 2020 overdue · Violation #13826788
  • C
    Other repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Oct 24, 2017 · fix by Nov 21, 2017 overdue · Violation #12031789

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

82017
392018
272019
352020
242021
952022
1062023
502024
202025
172026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 474 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.