Housing violations · Wakefield-Woodlawn
4439 Furman Avenue, Bronx
10466 · 5 apartments · 3 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs44
- Peeling paint and plaster25
- Mold17
- Mice or rats14
- Missing smoke or CO detector14
- Lead paint12
- Broken doors or locks6
- Electrical problems6
- Roaches6
- Leaks and water damage5
- Plumbing, sinks and toilets3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 113 closed · NYC typical: 87 days
from 139 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the entranceIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19321924
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and the ceilings in the entire apartmentIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321922
- CLeaks and water damageRepair the roof so that it will not leak at the ceiling in the entranceIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · rent impairing · Violation #19321923
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19321920
- CLeaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 2nd storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19310295
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at soffit between 1st story and second story at public hall stairsIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19310297
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 2nd storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19310294
- BOther repairsProperly repair or replace the broken or defective light fixture at the ceiling in the private hallwayIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137724
- BMoldTrace and repair the source and abate the visible mold condition more than 10 square feet but less than 30 square feet observed at the ceiling in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137725
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiliing in the 4th room from eastIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137726
- BOther repairsProperly repair or replace the broken or defective lower spring balance at the 3rd window from east at south in the 4th room from eastIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137727
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137728
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137729
- COther repairsProperly repair with similar material the broken or defective wood beams at ceiling at boiler roomIssued Aug 10, 2026 · fix by Aug 16, 2026 overdue · Violation #19132631
- CMoldTrace and repair the source and abate the visible mold condition at ceiling equals approx 20 sq feet in the 4th room from eastIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19133463
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jul 30, 2026 · fix by Aug 3, 2026 overdue · Violation #19114026
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jul 30, 2026 · fix by Aug 3, 2026 overdue · Violation #19114025
- COther repairsProperly repair with similar material the broken or defective fire retardant material at staircase soffit at public hall, 1st storyIssued Jun 10, 2026 · fix by Jun 16, 2026 overdue · Violation #18996713
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from eastIssued Jun 10, 2026 · fix by Jun 16, 2026 overdue · Violation #18996725
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Jun 10, 2026 · fix by Jun 16, 2026 overdue · Violation #18996728
- CMoldTrace and repair the source and abate the visible mold condition at ceiling more than approx 30 sq feet in the bathroomIssued Jun 10, 2026 · fix by Jul 6, 2026 overdue · Violation #18996290
- CPlumbing, sinks and toiletsRepair the broken or defective connection waste pipe under sink in the kitchenIssued Jun 10, 2026 · fix by Jun 16, 2026 overdue · Violation #18996742
- CMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Jun 10, 2026 · fix by Jul 6, 2026 overdue · Violation #18997305
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18803901
- BOther repairsProperly secure the loose cabinets at south wall in the kitchenIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18803900
- COther repairsProperly repair or replace the broken or defective hydronic baseboard heater cover in the 2nd room from north at eastIssued Apr 23, 2026 · fix by Apr 29, 2026 overdue · Violation #18803902
- BOther repairsProperly repair or replace the broken or defective base cabinet in the kitchenIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18764492
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18764493
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchenIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18764491
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall and north wall in the 1st room from east at southIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18764495
- BBroken doors or locksProperly repair or replace the broken or defective the 1st closet door from south at west in the 1st room from east at southIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18764496
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling at cellarIssued Mar 25, 2026 · fix by Mar 31, 2026 overdue · Violation #18739194
- COther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling approx 8 sq feet at boiler roomIssued Mar 25, 2026 · fix by Mar 31, 2026 overdue · Violation #18739191
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 10, 2026 · fix by Apr 14, 2026 overdue · Violation #18701967
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 10, 2026 · fix by Apr 14, 2026 overdue · Violation #18701971
- BOther repairsProperly repair or replace the broken or defective counter balance lower sash window, window at south wall in the 2nd room from eastIssued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18692792
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at northIssued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18692790
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at centerIssued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18692789
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at wash basin in the bathroomIssued Mar 6, 2026 · fix by Apr 10, 2026 overdue · rent impairing · Violation #18692791
- COther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at boiler room at cellarIssued Feb 20, 2026 · fix by Feb 26, 2026 overdue · Violation #18657795
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling at cellarIssued Feb 20, 2026 · fix by Feb 26, 2026 overdue · Violation #18657797
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of at electric panel at cellarIssued Feb 20, 2026 · fix by Feb 26, 2026 overdue · Violation #18663344
- BElectrical problemsReplace with new the missing electric panel covers at cellarIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18663341
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at gas meter at cellarIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18657792
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline at sink in the kitchenIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18645027
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft. at ceiling in the bathroomIssued Feb 17, 2026 · fix by Mar 15, 2026 overdue · Violation #18645028
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 4th room from eastIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18645026
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18631227
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 9, 2026 · fix by Mar 7, 2026 overdue · Violation #18631229
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18631228
- BBroken doors or locksProperly repair or replace the broken or defective door at entrance in the bathroomIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18508916
- BOther repairsProperly repair or replace the broken or defective wood base cabinet at west wall in the kitchenetteIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18508919
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 15, 2025 · fix by Jan 8, 2026 overdue · Violation #18508588
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Dec 15, 2025 · fix by Dec 21, 2025 overdue · Violation #18495135
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 15, 2025 · fix by Jan 8, 2026 overdue · Violation #18508590
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 15, 2025 · fix by Jan 8, 2026 overdue · Violation #18508591
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 15, 2025 · fix by Jan 8, 2026 overdue · Violation #18508589
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 1, 2025 · fix by Dec 27, 2025 overdue · Violation #18473341
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Nov 24, 2025 · fix by Nov 30, 2025 overdue · Violation #18440267
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft. at ceiling in the bathroomIssued Oct 27, 2025 · fix by Dec 1, 2025 overdue · Violation #18331005
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.