Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Concourse-Concourse Village

1006 Gerard Avenue, Bronx

10452 · 76 apartments · 6 stories · City Council district 8

By · Updated · Data from NYC HPD

C
29open immediately hazardous violations · 38 per 100 apartments
B88Hazardous, open
A11Non-hazardous, open
!127Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

10 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyVODA REALTY LLC
Landlord (head officer or owner)Anthony Gazivoda

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    26
  2. Peeling paint and plaster
    26
  3. Plumbing, sinks and toilets
    16
  4. Broken doors or locks
    10
  5. Roaches
    9
  6. Leaks and water damage
    8
  7. Missing smoke or CO detector
    8
  8. Lead paint
    6
  9. Mold
    6
  10. Electrical problems
    5
  11. No heat or hot water
    4
  12. Mice or rats
    4

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 103 closed · NYC typical: 87 days
B116 days
from 91 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 16, 2026 · rent impairing · Violation #19378905
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor (sloping) in the private hallwayIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19233068
  • C
    Other repairsProperly repair or replace the broken or defective uncapped radiator steam pipe at floor in the kitchenIssued Sep 23, 2026 · fix by Sep 29, 2026 overdue · Violation #19233070
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of nails/ fasteners protruding at wood floor in the 1st room from eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19233069
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 3, 2025 · fix by Nov 29, 2025 overdue · Violation #18341540
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection at drainpipe to washbasin in the bathroomIssued Oct 24, 2025 · fix by Oct 30, 2025 overdue · Violation #18319452
  • C
    Other repairsRemove all obstructions from water closet in the bathroomIssued Oct 24, 2025 · fix by Oct 30, 2025 overdue · rent impairing · Violation #18319449
  • B
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at wash basin and bathtub faucets in the bathroomIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · rent impairing · Violation #18248235
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures at wash basin and bathtub faucets in the bathroomIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · rent impairing · Violation #18248234
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Sep 24, 2025 · fix by Sep 30, 2025 overdue · Violation #18247388
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Jun 30, 2025 · fix by Aug 4, 2025 overdue · Violation #18057489
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling in the private hallwayIssued Jun 30, 2025 · fix by Aug 4, 2025 overdue · Violation #18057490
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 11, 2025 · fix by Mar 7, 2025 overdue · Violation #17691820
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at roof door at 2nd public hall bulkhead from north, 6th storyIssued Jan 21, 2025 · fix by Feb 4, 2025 overdue · Violation #17633214
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at 1st public hall bulkhead from east at south, 6th storyIssued Dec 23, 2024 · fix by Jan 6, 2025 overdue · Violation #17572813
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective closer arm at building entranceIssued Nov 27, 2024 · fix by Dec 11, 2024 overdue · Violation #17454510
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective in the bulkhead hinges in the public hall stairsIssued Nov 4, 2024 · fix by Nov 18, 2024 overdue · Violation #17371377
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective frame at bulkhead door at 6th story roof ( south section )Issued Aug 14, 2024 · fix by Aug 28, 2024 overdue · Violation #17187934
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 30 sq ft at north, west, and east walls in the bathroomIssued Jul 16, 2024 · fix by Aug 20, 2024 overdue · Violation #17120928
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 16, 2024 · fix by Aug 11, 2024 overdue · Violation #17120920
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 16, 2024 · fix by Aug 11, 2024 overdue · Violation #17120921
  • B
    Lead paintProperly repair or replace the broken or defective latch at door at vestibule leading to public hall, 1st storyIssued May 6, 2024 · fix by Jun 10, 2024 overdue · Violation #16946976
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at top and middle pane at door at street to vestibule, basementIssued May 6, 2024 · fix by Jun 10, 2024 overdue · Violation #16946978
  • B
    Lead paint& 309 m/d law abate the nuisance consisting of plexiglass installed at door at vestibule leading to public hall, 1st storyIssued May 6, 2024 · fix by Jun 10, 2024 overdue · Violation #16946977
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from eastIssued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16713018
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16713017
  • B
    Electrical problemsReplace with new the missing electrical light fixture at ceiling in the private hallwayIssued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16713016
  • B
    MoldTrace and repair the source and abate the visible mold condition aprox 10 sq ft at ceiling in the bathroomIssued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16713012
  • B
    Other repairsProperly repair or replace the broken or defective upper wall cabinet at south wall in the kitchenIssued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16713008
  • B
    Broken doors or locksRefit door in the 1st room from eastIssued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16713000
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16712999
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 15, 2024 · fix by Jan 9, 2024 overdue · rent impairing · Violation #16587616
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 2, 2024 · fix by Jan 2, 2024 overdue · rent impairing · Violation #16557995
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection wasteline at sink in the kitchenIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357829
  • B
    Other repairsReplace with new the missing ceiling light fixture in the private hallwayIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357842
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the private hallwayIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357843
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the 2nd room from eastIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357844
  • B
    Broken doors or locksProperly repair or replace the broken or defective entrance door in the 2nd room from eastIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357845
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357847
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357848
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling approx 15 sq. ft in the bathroomIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357835
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357836
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in the waste line at bathtub in the bathroomIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · rent impairing · Violation #16357838
  • B
    Plumbing, sinks and toiletsReplace with new the missing wash basin in the bathroomIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357839
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357841
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 6, 2023 · fix by Nov 12, 2023 overdue · Violation #16357834
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357833
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the kitchenIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357832
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357830
  • B
    Other repairsProperly repair or replace the broken or defective ceiling light fixture in the 2nd room from eastIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16357828
  • B
    Other repairsReplace with new the missing west wall cabinets in the kitchenIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16099096
  • B
    Plumbing, sinks and toiletsReplace with new the missing wash basin in the bathroomIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16099097
  • B
    Broken doors or locksProperly repair or replace the broken or defective door in the 1st room from east at southIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16099092
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and west walls in the bathroomIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16099093
  • B
    Other repairsProperly repair or replace the broken or defective counter top in the kitchenIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16099094
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at sink wasteline in the kitchenIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16099098
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16099095
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16099105
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16099104
  • B
    Other repairsProperly repair or replace the broken or defective bell and return buzzer intercom system from building vestibule to south wall in the kitchenIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16099103

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

382017
1452018
222019
262020
1332021
572022
912023
1182024
992025
102026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 950 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.