Housing violations · Hamilton Heights-Sugar Hill
3417 Broadway, Manhattan
10031 · 22 apartments · 6 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs22
- Peeling paint and plaster12
- Leaks and water damage5
- Broken doors or locks4
- Lead paint4
- Plumbing, sinks and toilets4
- Mice or rats3
- Roaches3
- No heat or hot water2
- Electrical problems2
- Mold1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 19 closed · NYC typical: 87 days
from 14 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at door leading to south yard at public hall, 1st storyIssued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19349618
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at east and south walls at bulkheadIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19349616
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19349615
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yardIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19349619
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th storyIssued Oct 6, 2026 · fix by Oct 12, 2026 overdue · Violation #19281077
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19281076
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208962
- BPlumbing, sinks and toiletsProperly secure the loose wash basin cabinet at the east wall in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208957
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19208958
- BPlumbing, sinks and toiletsRepair the broken or defective connection at the wasteline at the wash basin in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208959
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall and the north wall in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208960
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19184436
- BLeaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 6th storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19184435
- BPlumbing, sinks and toiletsRepair the broken or defective connection drain pipe at wash basin in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19184434
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19184432
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures no volume in the entire apartmentIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · rent impairing · Violation #19184431
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19184433
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures at all plumbing fixtures at kitchen and bathroom in the entire apartmentIssued Sep 2, 2026 · fix by Sep 8, 2026 overdue · rent impairing · Violation #19171743
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19171740
- BBroken doors or locksProperly repair or replace the broken or defective bell buzzer/intercom system from the building entrance door to the apartment wall panel at west wall in the…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19171744
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19171738
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · rent impairing · Violation #19171741
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19171739
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19171742
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Jun 26, 2026 · fix by Jul 31, 2026 overdue · Violation #19029573
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 26, 2026 · fix by Jul 22, 2026 overdue · Violation #19029574
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the bathroomIssued Jun 26, 2026 · fix by Jul 31, 2026 overdue · rent impairing · Violation #19029572
- COther repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Apr 23, 2026 · fix by Apr 29, 2026 overdue · Violation #18813708
- COther repairsProperly repair or replace the broken or defective glass pane at skylight at roof at public hall stairs, 6th storyIssued Apr 21, 2026 · fix by Apr 27, 2026 overdue · Violation #18800555
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to apartment wall panel at west in the private hallwayIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18796506
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18796505
- BLeaks and water damageRepair the roof so that it will not leak above the ceiling in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · rent impairing · Violation #18796504
- COther repairsProperly repair or replace the broken or defective glass pane at lower and upper window sashes at south wall at public hall, 3rd storyIssued Apr 21, 2026 · fix by Apr 27, 2026 overdue · Violation #18800573
- COther repairsProperly repair or replace the broken or defective glass pane at lower and upper window sashes at south wall at public hall stairs, 6th storyIssued Apr 21, 2026 · fix by Apr 27, 2026 overdue · Violation #18800561
- COther repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Apr 21, 2026 · fix by Apr 27, 2026 overdue · Violation #18800531
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electric wires at ceiling at public hall, 6th storyIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17894846
- BMoldTrace and repair the source and abate the visible mold condition at ceiling ( approx 40 sqft) at public hall, 1st story original violation 14662073 issued…Issued Mar 9, 2022 · fix by Apr 13, 2022 overdue · Violation #15015854
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 5, 2020 · fix by Mar 4, 2020 overdue · Violation #13586365
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Feb 5, 2020 · fix by Mar 4, 2020 overdue · Violation #13586362
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage, refuse and household items at south yard at basementIssued Jan 21, 2020 · fix by Feb 25, 2020 overdue · Violation #13529784
- CMice or ratsAbate the infestation consisting of rodents live rats observed - droppings present at south yard/ basement area at basementIssued Jan 21, 2020 · fix by Feb 11, 2020 overdue · rent impairing · Violation #13529787
- BOther repairsProperly repair the broken or defective counter balance at first window frame from north at west in the 1st room from east at southIssued Jan 14, 2020 · fix by Feb 18, 2020 overdue · Violation #13540156
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceilings and all walls through-out in the entire apartmentIssued Dec 12, 2017 · fix by Jan 16, 2018 overdue · Violation #12137800
- BElectrical problemsProperly repair the broken or defective electrical outlet at north wall. in the 2nd room from north at eastIssued Nov 28, 2017 · fix by Jan 2, 2018 overdue · Violation #12094225
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceilings and all walls through out in the entire apartmentIssued Oct 25, 2017 · fix by Nov 29, 2017 overdue · Violation #12033725
- BOther repairs& 309 m/d law abate the nuisance consisting of exposed cable wires at building front facadeIssued Feb 23, 2017 · fix by Mar 30, 2017 overdue · Violation #11660504
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Nov 30, 2015 · fix by Jan 4, 2016 overdue · Violation #11017141
- BOther repairsReplace with new the broken or defective ceramic floor tiles in the bathroomIssued Nov 27, 2015 · fix by Jan 1, 2016 overdue · Violation #11014586
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Nov 4, 2015 · fix by Dec 9, 2015 overdue · Violation #10985513
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Nov 4, 2015 · fix by Dec 9, 2015 overdue · Violation #10985512
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 20, 2007 · fix by Dec 16, 2007 overdue · Violation #7023427
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.