Housing violations · Hamilton Heights-Sugar Hill
3440 Broadway, Manhattan
10031 · 36 apartments · 6 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster28
- Other repairs26
- Leaks and water damage9
- Roaches6
- Lead paint6
- Broken doors or locks4
- Mold3
- Mice or rats2
- Plumbing, sinks and toilets2
- No heat or hot water2
- Electrical problems1
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 37 closed · NYC typical: 87 days
from 65 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 13, 2026 · fix by Dec 9, 2026 · Violation #19372034
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 13, 2026 · fix by Dec 9, 2026 · Violation #19372035
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 5th room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367349
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367347
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367346
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367345
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367344
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19367354
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 6th room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367353
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub in the 2nd bathroom from northIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19367352
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd bathroom from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367351
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st bathroom from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367350
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 5th room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367348
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19336491
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the 3rd room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325190
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, east , south, north and west walls in the 3rd room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325189
- BPlumbing, sinks and toiletsRepair the broken or defective connection at sink waste line. in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298831
- BOther repairsProperly repair with similar material the broken or defective wood bottom panel at base cabinet in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298832
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298833
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19273739
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274106
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274112
- BOther repairsRemove all encumbrances consisting of maintenance supplies at bulkhead at public hallIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19274141
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at all walls at public hall, 6th storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274152
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274162
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at all walls at public hall, 5th storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274164
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 4th storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274167
- BOther repairsRemove all encumbrances consisting of household item(bike) at public hall, 2nd storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19274200
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 5, 2026 · fix by Oct 31, 2026 overdue · rent impairing · Violation #19274207
- BOther repairsProperly repair or replace the broken or defective latch set in the entranceIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19273732
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19043015
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from eastIssued Jul 1, 2026 · fix by Aug 5, 2026 overdue · Violation #19043016
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 17, 2026 · fix by Jul 13, 2026 overdue · Violation #19008754
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the kitchenIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18976783
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from eastIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18976786
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18976785
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18976784
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 1st room from eastIssued May 21, 2026 · fix by Jun 25, 2026 overdue · rent impairing · Violation #18943919
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued May 21, 2026 · fix by Jun 25, 2026 overdue · Violation #18943921
- BBroken doors or locksRefit the door to mail-box room at public hall, 1st storyIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18824274
- BBroken doors or locksRefit the door at entrance in the 4th room from north at westIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18824277
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the kitchenIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18824276
- BBroken doors or locksProperly repair or replace the broken or defective door frame at building entrance doorIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18824275
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 17, 2026 · fix by Feb 15, 2026 overdue · rent impairing · Violation #18645922
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 17, 2026 · fix by Feb 15, 2026 overdue · rent impairing · Violation #18645923
- BOther repairsProperly repair or replace the broken or defective base cabinets at north wall in the kitchenIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18293170
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18293189
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18204084
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18204082
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18204077
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18144320
- CLead paintReplace or repair the self-closing doors that is missing or defective latchset at door leading to west yard at public hall, 1st storyIssued Aug 8, 2025 · fix by Aug 22, 2025 overdue · Violation #18144325
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 12, 2025 · fix by Jun 7, 2025 overdue · Violation #17890221
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate first window from south at west wall…Issued Nov 27, 2024 · fix by Jan 1, 2025 overdue · Violation #17473047
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage area at east yardIssued Sep 28, 2023 · fix by Nov 2, 2023 overdue · Violation #16263271
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at closet ceiling in the private hallwayIssued Sep 20, 2022 · fix by Oct 25, 2022 overdue · Violation #15381218
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from eastIssued Jun 1, 2021 · fix by Jul 6, 2021 overdue · Violation #14361964
- CMoldTrace and repair the source and abate the visible mold condition at ceiling and walls in the bathroomIssued Aug 18, 2020 · fix by Sep 13, 2020 overdue · Violation #13756832
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the kitchenIssued Aug 18, 2020 · fix by Aug 24, 2020 overdue · Violation #13756802
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint radiator west room 6 sty northeastIssued Nov 12, 1996 · fix by Dec 2, 1996 overdue · Violation #2425351
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.