Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (North)

2411 Frederick Dougal Boulevard, Manhattan

10027 · 97 apartments · 8 stories · City Council district 9

By · Updated · Data from NYC HPD

C
18open immediately hazardous violations · 19 per 100 apartments
B30Hazardous, open
A11Non-hazardous, open
!56Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyGladys Hampton Affordable Preservation, LLC
Landlord (head officer or owner)Herminio Torres

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    16
  2. Broken doors or locks
    9
  3. Leaks and water damage
    8
  4. Roaches
    7
  5. Other repairs
    5
  6. Mice or rats
    4
  7. Plumbing, sinks and toilets
    3
  8. No heat or hot water
    3
  9. Mold
    3
  10. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C216 days
from 79 closed · NYC typical: 87 days
B113 days
from 47 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19354594
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19354595
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19125331
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective mechanical stopper at bathtub in the bathroomIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19125342
  • B
    Broken doors or locksProperly repair or replace the broken or defective bell, return buzzer & intercom system from building front entrance door to apartment panel at east wall in…Issued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18286999
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the private hallwayIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18185006
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 27, 2025 · fix by Sep 22, 2025 overdue · Violation #18185010
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 27, 2025 · fix by Sep 22, 2025 overdue · Violation #18185009
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the 1st bathroom from northIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18185008
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in bathtub drain pipe in the 2nd bathroom from northIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · rent impairing · Violation #18185007
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Aug 12, 2025 · fix by Sep 16, 2025 overdue · Violation #18153700
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 12, 2025 · fix by Sep 16, 2025 overdue · Violation #18153699
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl baseboard at north wall in the private hallwayIssued Aug 12, 2025 · fix by Sep 16, 2025 overdue · Violation #18162950
  • B
    Broken doors or locksProperly repair with similar material the broken or defective rubber gasket at refridgerator door in the kitchenIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18077953
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 22, 2025 · fix by Jun 17, 2025 overdue · Violation #17908083
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 27, 2025 · fix by Jan 27, 2025 overdue · rent impairing · Violation #17650584
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at ceiling in the bathroomIssued Jan 27, 2025 · fix by Mar 3, 2025 overdue · Violation #17650585
  • B
    Other repairsProperly repair or replace the broken or defective bell,buzzer,and intercom system from building vestibule to east wall in the foyerIssued Jan 27, 2025 · fix by Mar 3, 2025 overdue · Violation #17650586
  • B
    Broken doors or locksProperly repair or replace the broken or defective entrance door in the 2nd room from northIssued Dec 31, 2024 · fix by Feb 4, 2025 overdue · Violation #17587213
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from northIssued Dec 31, 2024 · fix by Feb 4, 2025 overdue · Violation #17587201
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from northIssued Dec 31, 2024 · fix by Feb 4, 2025 overdue · Violation #17587202
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 3rd room from northIssued Dec 31, 2024 · fix by Feb 4, 2025 overdue · Violation #17587203
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Dec 31, 2024 · fix by Feb 4, 2025 overdue · Violation #17587205
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Dec 31, 2024 · fix by Feb 4, 2025 overdue · Violation #17587206
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from northIssued Dec 31, 2024 · fix by Feb 4, 2025 overdue · Violation #17587208
  • B
    Leaks and water damageRepair the roof so that it will not leak above ceiling in the 1st room from northIssued Dec 23, 2024 · fix by Jan 27, 2025 overdue · rent impairing · Violation #17573745
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 23, 2024 · fix by Jan 18, 2025 overdue · Violation #17573750
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Dec 23, 2024 · fix by Jan 27, 2025 overdue · Violation #17573746
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 23, 2024 · fix by Jan 18, 2025 overdue · Violation #17573749
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Dec 23, 2024 · fix by Jan 27, 2025 overdue · Violation #17573747
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in at sink waste line in the kitchenIssued Dec 23, 2024 · fix by Jan 27, 2025 overdue · rent impairing · Violation #17573748
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 23, 2024 · fix by Dec 23, 2024 overdue · rent impairing · Violation #17577947
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17552176
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17552175
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Dec 16, 2024 · fix by Jan 11, 2025 overdue · Violation #17552179
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Dec 9, 2024 · fix by Dec 23, 2024 overdue · Violation #17533193
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Nov 26, 2024 · fix by Dec 31, 2024 overdue · Violation #17441781
  • B
    Other repairsRemove all obstructions and repair all defects in waste line at bathub in the bathroomIssued Oct 17, 2024 · fix by Nov 21, 2024 overdue · rent impairing · Violation #17355149
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 17, 2024 · fix by Nov 12, 2024 overdue · Violation #17355212
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 5 sq feet at ceiling in the bathroomIssued Oct 7, 2024 · fix by Nov 11, 2024 overdue · Violation #17332023
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 6, 2024 · fix by Oct 2, 2024 overdue · Violation #17244617
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 6, 2024 · fix by Oct 2, 2024 overdue · Violation #17244618
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17150326
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17150328
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 7, 2024 · fix by Jun 21, 2024 overdue · Violation #17028397
  • B
    MoldTrace and repair the source and abate the visible mold condition (approximately 6 sq.ft) at the ceiling in the bathroomIssued Mar 12, 2024 · fix by Apr 16, 2024 overdue · Violation #16741286
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Feb 12, 2024 · fix by Feb 26, 2024 overdue · Violation #16658992
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartmentIssued Jan 23, 2024 · fix by Jan 29, 2024 overdue · Violation #16613070

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

52017
312018
302019
172020
382021
102022
522023
1152024
342025
152026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 534 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.