Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (North)

408 Audubon Avenue, Manhattan

10033 · 31 apartments · 5 stories · City Council district 10

By · Updated · Data from NYC HPD

C
10open immediately hazardous violations · 32 per 100 apartments
B24Hazardous, open
A4Non-hazardous, open
!34Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyAUDUB0N AVENUE LLC
Landlord (head officer or owner)Moshe Piller

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    14
  2. Peeling paint and plaster
    8
  3. Mold
    5
  4. Plumbing, sinks and toilets
    3
  5. Leaks and water damage
    2
  6. Electrical problems
    2
  7. Mice or rats
    2
  8. Broken doors or locks
    1
  9. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C92 days
from 70 closed · NYC typical: 87 days
B114 days
from 138 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the floors at 1st fire passage way from northIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19192355
  • B
    Plumbing, sinks and toiletsReplace with new the missing base cabinet at sink in the kitchenIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19186316
  • B
    Other repairsReplace with new the missing wall cabinet at north in the kitchenIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19169069
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169070
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169067
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169066
  • B
    Other repairsProperly repair or replace the broken or defective latch set at the front entrance gate , 1st storyIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151948
  • B
    Other repairsProperly repair or replace the broken or defective latch set at the front entrance gate , 1st storyIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19140647
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 5th room from east at southIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18810847
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pot at 3rd story balcony at 1st fire escape from south at…Issued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18810853
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30sq feet at ceiling and all walls in the bathroomIssued Apr 27, 2026 · fix by May 23, 2026 overdue · Violation #18810842
  • C
    MoldTrace and repair the source and abate the visible mold condition greater then 30sq feet at ceiling and north wall in the bathroomIssued Mar 30, 2026 · fix by Apr 25, 2026 overdue · Violation #18742032
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the 3rd room from northIssued Dec 15, 2025 · fix by Jan 19, 2026 overdue · Violation #18507306
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 3rd room from northIssued Dec 15, 2025 · fix by Jan 19, 2026 overdue · Violation #18507303
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 8, 2025 · fix by Dec 22, 2025 overdue · Violation #18488494
  • B
    Other repairsProperly repair or replace the broken or defective base cabient at west wall in the kitchenIssued Sep 8, 2025 · fix by Oct 13, 2025 overdue · Violation #18211284
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2025 · fix by Oct 4, 2025 overdue · Violation #18211286
  • C
    Other repairsReplace with new the missing lowere sash window pane in the kitchenIssued Mar 20, 2025 · fix by Mar 26, 2025 overdue · Violation #17777153
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the kitchenIssued Oct 25, 2024 · fix by Nov 29, 2024 overdue · Violation #17366598
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the bathroomIssued Oct 25, 2024 · fix by Nov 29, 2024 overdue · rent impairing · Violation #17377725
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 25, 2024 · fix by Nov 29, 2024 overdue · rent impairing · Violation #17366592
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall, west wall, ceiling in the bathroomIssued Oct 25, 2024 · fix by Nov 29, 2024 overdue · Violation #17377702
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 25, 2024 · fix by Nov 20, 2024 overdue · Violation #17366601
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the 4th room from east at northIssued Oct 25, 2024 · fix by Nov 29, 2024 overdue · Violation #17366595
  • C
    Other repairsProperly repair or replace the broken or defective lower window sash 1st from west at north stuck in open position in the kitchenIssued Oct 25, 2024 · fix by Oct 31, 2024 overdue · Violation #17377713
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the foyerIssued Oct 25, 2024 · fix by Nov 29, 2024 overdue · Violation #17377704
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 4th room from east at northIssued Oct 25, 2024 · fix by Nov 29, 2024 overdue · Violation #17366596
  • B
    MoldTrace and repair the source and abate the visible mold condition greater then 10 sq ft of mold west wall, west wall in the 4th room from east at southIssued Oct 25, 2024 · fix by Nov 29, 2024 overdue · Violation #17366590
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at sink at waste line in the kitchenIssued Oct 25, 2024 · fix by Nov 29, 2024 overdue · Violation #17366597
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 4 sq fts at ceiling, 4 sq fts at north wall and 4 sq fts at east wall. in the 1st room…Issued May 28, 2024 · fix by Jul 2, 2024 overdue · Violation #16999745
  • C
    MoldTrace and repair the source and abate the visible mold condition approx 20 sq ft at ceiling in the bathroomIssued Sep 13, 2023 · fix by Oct 9, 2023 overdue · Violation #16226877
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 27, 2022 · fix by Nov 1, 2022 overdue · Violation #15382183
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 5, 2021 · fix by May 31, 2021 overdue · Violation #14320642
  • B
    Other repairsProperly repair the broken or defective pilot light at stove at gas range in the kitchenIssued Dec 1, 2016 · fix by Jan 5, 2017 overdue · Violation #11552211

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

1232017
522018
452019
362020
2102021
492022
602023
942024
932025
372026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,156 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.