Housing violations · Manhattanville-West Harlem
3240 Broadway, Manhattan
10027 · 213 apartments · 20 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster4
- Roaches3
- Leaks and water damage2
- Other repairs2
- Mold2
- Broken doors or locks1
- Electrical problems1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 26 closed · NYC typical: 87 days
from 19 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19327966
- BBroken doors or locksProperly repair or replace the broken or defective heavy duty lock at building entrance door , 1st storyIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19299303
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the private hallwayIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298256
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed bx cables above wall inside 2nd closet from east at south in the private…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298258
- BLeaks and water damageRepair the leaky and/or defective water supply pipe water supply valve inside 2nd closet from east at south in the private hallwayIssued Oct 15, 2026 · fix by Nov 19, 2026 · rent impairing · Violation #19298257
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19292691
- BPlumbing, sinks and toiletsProperly secure the loose sink basin at base cabinet in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277563
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at west wall in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277565
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2026 · fix by Nov 2, 2026 overdue · Violation #19277564
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft at ceiling in the bathroomIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19104136
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 26, 2026 · fix by Apr 21, 2026 overdue · Violation #18737230
- CMoldTrace and repair the source and abate the visible mold condition greater than 3o square feet at the ceiling, north wall, east wall, and south wall in the…Issued Oct 14, 2025 · fix by Nov 9, 2025 overdue · Violation #18296391
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.