Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Harlem (South)

330 East 104 Street, Manhattan

10029 · 50 apartments · 6 stories · City Council district 8

By · Updated · Data from NYC HPD

C
4open immediately hazardous violations · 8 per 100 apartments
B20Hazardous, open
A11Non-hazardous, open
!35Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyEAST 103RD STREET ASSOCIATES LLC
Landlord (head officer or owner)Herminio Torres

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Mold
    11
  2. Peeling paint and plaster
    10
  3. Other repairs
    5
  4. Broken doors or locks
    4
  5. Roaches
    2
  6. Leaks and water damage
    1
  7. Missing window guards
    1
  8. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C91 days
from 22 closed · NYC typical: 87 days
B119 days
from 55 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270389
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at southIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270387
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270390
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19270388
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from northIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18156100
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18156101
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 23, 2024 · fix by Nov 18, 2024 overdue · Violation #17364111
  • B
    Broken doors or locksProperly repair or replace the broken or defective closet door at north wall in the private hallwayIssued Sep 27, 2023 · fix by Nov 1, 2023 overdue · Violation #16256176
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 4th room from eastIssued Sep 27, 2023 · fix by Nov 1, 2023 overdue · Violation #16256172
  • B
    Broken doors or locksProperly repair or replace the broken or defective closet doors in the 1st room from eastIssued Sep 27, 2023 · fix by Nov 1, 2023 overdue · Violation #16256168
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from eastIssued Sep 27, 2023 · fix by Nov 1, 2023 overdue · Violation #16256166
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 27, 2023 · fix by Oct 23, 2023 overdue · Violation #16256181
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 20 sq ft on the ceiling in the bathroomIssued Aug 15, 2023 · fix by Sep 19, 2023 overdue · Violation #16159154
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Jul 28, 2023 · fix by Sep 1, 2023 overdue · Violation #16121845
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling approx. 10 sq. ft in the 1st room from northIssued May 2, 2023 · fix by Jun 6, 2023 overdue · Violation #15947769
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 12 sq.ft at west wall north wall and ceiling in the bathroomIssued Mar 24, 2023 · fix by Apr 28, 2023 overdue · Violation #15818770
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 12 sq.ft at north and east walls and ceiling in the 3rd room from eastIssued Mar 24, 2023 · fix by Apr 28, 2023 overdue · Violation #15818768
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 10 sq.ft at north wall in the 4th room from east at northIssued Mar 24, 2023 · fix by Apr 28, 2023 overdue · Violation #15818769
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 28, 2022 · fix by Jul 24, 2022 overdue · Violation #15228392
  • C
    MoldTrace and repair the source and abate the visible mold condition approximately 10 sq. ft. north wall, east wall in the 3rd room from eastIssued Feb 8, 2022 · fix by Mar 6, 2022 overdue · Violation #14821809
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling (approx 2 sq ft) in the bathroomIssued Jun 19, 2020 · fix by Jul 24, 2020 overdue · Violation #13700969
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold ,, east wall in the 1st room from east at northIssued Feb 23, 2009 · fix by Mar 30, 2009 overdue · Violation #7735584
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold ,, ceiling in the bathroomIssued Feb 23, 2009 · fix by Mar 30, 2009 overdue · Violation #7735585
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold ,, east wall in the 3rd room from eastIssued Feb 23, 2009 · fix by Mar 30, 2009 overdue · Violation #7735583

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

172017
52018
242020
102021
262022
782023
252024
72025
102026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 239 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.