Housing violations · Harlem (North)
148 West 143 Street, Manhattan
10030 · 34 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
25 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks25
- No heat or hot water23
- Other repairs22
- Lead paint12
- Roaches9
- Peeling paint and plaster8
- Leaks and water damage4
- Plumbing, sinks and toilets4
- Mice or rats3
- Mold2
- Electrical problems1
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 113 closed · NYC typical: 87 days
from 178 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at fire door to stairway at public hall, 3rd storyIssued Nov 13, 2026 · fix by Dec 9, 2026 · Violation #19376336
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at in the 2nd room from northIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19376334
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19365475
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19365474
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19363950
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19363951
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 9, 2026 · fix by Dec 3, 2026 · Violation #19363949
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures throughout in the entire apartmentIssued Nov 6, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19355537
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 1st room from north at westIssued Nov 6, 2026 · fix by Dec 11, 2026 · rent impairing · Violation #19355286
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Nov 6, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19355288
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19355287
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 5, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19351533
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · rent impairing · Violation #19356735
- BOther repairsProperly repair or replace the broken or defective inoperative bell, buzzer, intercom from forst story public hall vestibule to the panel at south wall in the…Issued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351532
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19351528
- BOther repairsProperly repair or replace the broken or defective inoperative bell,buzzer ,intercom system from first story public hall to the panel at south wall in the foyerIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351529
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19351530
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures at bathroom and kitchen in the entire apartmentIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19351100
- CNo heat or hot waterProvide hot water at all hot water fixturesIssued Nov 4, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19351531
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19351527
- BBroken doors or locksProperly repair or replace the broken or defective inoperative lock and assembly at building entrance door at lobby, 1st storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351526
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19344680
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19344679
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19344678
- BMoldTrace and repair the source and abate the visible mold condition more than 1o sq ft at ceiling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344681
- BLead paintProperly repair or replace the broken or defective doorn handle at 1st fire door from south at west leading to staircase a at public hall, 1st storyIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19345743
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at 1st door from east at south leading to janitors closet at public hall, 1st storyIssued Nov 2, 2026 · fix by Nov 16, 2026 · Violation #19345742
- BPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · rent impairing · Violation #19345738
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures at all fixturs in the entire apartmentIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · rent impairing · Violation #19345737
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch-set at building front entrance door , 1st storyIssued Nov 2, 2026 · fix by Nov 16, 2026 · Violation #19345736
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash at 1st window from east at south wall at public hall, 6th storyIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19345735
- CLead paintProvide ready access to buildings heating system door locked leading to boiler at boiler roomIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19344676
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344677
- CNo heat or hot waterProvide hot water at all hot water fixtures in the 1st room from eastIssued Nov 2, 2026 · fix by Nov 1, 2026 overdue · rent impairing · Violation #19344675
- CBroken doors or locksProvide ready access to buildings heating system door locked at public hall 1st story at boiler room, 1st storyIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19345740
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 2, 2026 · fix by Nov 1, 2026 overdue · rent impairing · Violation #19344682
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 2, 2026 · fix by Nov 1, 2026 overdue · rent impairing · Violation #19345739
- CLead paintReplace or repair the self-closing doors that is missing or defective latch set at fire door leading to public hall stair at west at public hall, 1st storyIssued Oct 30, 2026 · fix by Nov 13, 2026 overdue · Violation #19334808
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19334806
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 30, 2026 · fix by Oct 28, 2026 overdue · rent impairing · Violation #19331647
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 30, 2026 · fix by Oct 28, 2026 overdue · rent impairing · Violation #19331650
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 30, 2026 · fix by Oct 29, 2026 overdue · rent impairing · Violation #19334807
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 30, 2026 · fix by Oct 29, 2026 overdue · rent impairing · Violation #19334805
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to north wall in the foyerIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19331648
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance doorIssued Oct 30, 2026 · fix by Nov 13, 2026 overdue · Violation #19334809
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in compactor closet at public hall, 2nd storyIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19331654
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19328174
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set and its assemblies at hopper door in compactor closet at public hall, 2nd storyIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19331653
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19325663
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the household trash that is overflowing from hopper. at compactor closet,…Issued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19331649
- CLead paintReplace or repair the self-closing doors that is missing or defective latch set and its assemblies at fire door leading to compactor closet at public hall, 2nd…Issued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19331652
- CLead paintReplace or repair the self-closing doors that is missing or defective latch set and its assemblies at fire door leading to staircase a at public hall, 1st storyIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19331651
- CBroken doors or locksRemove device preventing door from being self-closing consisting of flooring scraping against the bottom of theIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19331655
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19331646
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 27, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19329101
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 27, 2026 · fix by Nov 22, 2026 · Violation #19329102
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 27, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19328442
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 27, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19328175
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 27, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19328706
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 27, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19328441
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.