Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (South)

560 West 175 Street, Manhattan

10033 · 30 apartments · 6 stories · City Council district 10

By · Updated · Data from NYC HPD

C
5open immediately hazardous violations · 17 per 100 apartments
B3Hazardous, open
A7Non-hazardous, open
!15Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

Open in Google Maps ↗

Who owns and manages it

Owning company175th Associates LLC
Landlord (head officer or owner)Yida Stern

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    6
  2. Broken doors or locks
    2
  3. Lead paint
    2
  4. Mold
    2
  5. Plumbing, sinks and toilets
    2
  6. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C85 days
from 75 closed · NYC typical: 87 days
B107 days
from 139 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 11, 2025 · fix by Aug 25, 2025 overdue · Violation #18151027
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Jul 31, 2025 · fix by Aug 6, 2025 overdue · Violation #18122238
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 28, 2025 · fix by Aug 21, 2025 overdue · Violation #18119571
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 28, 2025 · fix by Aug 21, 2025 overdue · Violation #18119570
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north, east walls and the ceiling in the 1st room from north at westIssued Jun 11, 2025 · fix by Jul 16, 2025 overdue · Violation #18000063
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glazed finish at bathtub in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820164
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 31, 2025 · fix by Apr 26, 2025 overdue · Violation #17794336
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 10 sq ft at south wall in the 3rd room from north at westIssued Dec 27, 2019 · fix by Jan 31, 2020 overdue · Violation #13509425

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

92017
272018
132019
32020
232021
82022
292023
692024
1742025
52026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 580 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.