Housing violations · Washington Heights (North)
500 West 188 Street, Manhattan
10040 · 56 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
14 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs26
- Peeling paint and plaster20
- Missing smoke or CO detector12
- Broken doors or locks12
- Lead paint10
- Plumbing, sinks and toilets5
- Leaks and water damage4
- Mold3
- Roaches3
- No heat or hot water3
- Mice or rats2
- Electrical problems2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 10 closed · NYC typical: 87 days
from 18 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 24, 2025 · fix by Feb 19, 2025 overdue · Violation #17642708
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and north wall in the bathroomIssued Jan 24, 2025 · fix by Feb 28, 2025 overdue · Violation #17642711
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 24, 2025 · fix by Feb 19, 2025 overdue · Violation #17642707
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17295694
- BPlumbing, sinks and toiletsRepair the broken or defective connection at waste line under wash basin in the bathroomIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17295691
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17295693
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles east wall in the bathroomIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17295692
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 24, 2024 · fix by Oct 20, 2024 overdue · Violation #17295696
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Feb 5, 2024 · fix by Feb 11, 2024 overdue · Violation #16647275
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 8, 2023 · fix by Dec 7, 2023 overdue · rent impairing · Violation #16504145
- BLead paint& 309 m/d law abate the nuisance consisting of lockset installed at door leading to room with fire escape access in the 1st room from northIssued Jan 27, 2023 · fix by Mar 3, 2023 overdue · Violation #15680852
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Apr 11, 2022 · fix by May 16, 2022 overdue · Violation #15104780
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Apr 11, 2022 · fix by May 16, 2022 overdue · Violation #15104781
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 11, 2022 · fix by May 5, 2022 overdue · Violation #15104960
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 11, 2022 · fix by May 5, 2022 overdue · Violation #15104959
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 11, 2022 · fix by May 5, 2022 overdue · Violation #15104958
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 11, 2022 · fix by May 5, 2022 overdue · Violation #15104957
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Apr 11, 2022 · fix by May 16, 2022 overdue · Violation #15104791
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from east at south wall wall in the foyerIssued Apr 11, 2022 · fix by May 16, 2022 overdue · Violation #15104838
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 4, 2022 · fix by Apr 28, 2022 overdue · Violation #15092480
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 4, 2022 · fix by Apr 28, 2022 overdue · Violation #15092481
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 4, 2022 · fix by Apr 28, 2022 overdue · Violation #15092482
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 4, 2022 · fix by Apr 28, 2022 overdue · Violation #15092483
- BMoldTrace and repair the source and abate the visible mold condition approx 4 sq/ft at ceiling and south wall in the closet at south in the 1st room from north at…Issued Aug 29, 2019 · fix by Oct 3, 2019 overdue · Violation #13253721
- BBroken doors or locksArrange and make self-closing the doors in the entranceIssued Feb 13, 2019 · fix by Mar 20, 2019 overdue · Violation #12907435
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Feb 13, 2019 · fix by Mar 20, 2019 overdue · Violation #12907456
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Feb 13, 2019 · fix by Mar 20, 2019 overdue · Violation #12907446
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Oct 11, 2018 · fix by Nov 15, 2018 overdue · rent impairing · Violation #12641931
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, and walls. in the kitchenIssued Oct 11, 2018 · fix by Nov 15, 2018 overdue · Violation #12641926
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Jul 10, 2017 · fix by Aug 14, 2017 overdue · Violation #11862634
- BMissing smoke or CO detectorRepair or replace the smoke detector missingIssued Jul 10, 2017 · fix by Aug 14, 2017 overdue · Violation #11862633
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Jul 10, 2017 · fix by Aug 14, 2017 overdue · Violation #11862627
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the bathroom from northIssued Jul 10, 2017 · fix by Aug 14, 2017 overdue · Violation #11862621
- BBroken doors or locksRemove the illegal fastening consisting of lockable sliding bolt installed at the door in the entranceIssued Jul 10, 2017 · fix by Aug 14, 2017 overdue · rent impairing · Violation #11862640
- CBroken doors or locksSection 27-2005, 2007 adm code remove the illegal fastening key operated lock installed on door to room with fire escape access in the 1st room from north at…Issued Jan 22, 2014 · fix by Jan 30, 2014 overdue · rent impairing · Violation #10099648
- BMissing smoke or CO detectorSection 27-2045 adm code repair or replace the smoke detector missing, in the entire apartmentIssued Jun 6, 2013 · fix by Jul 11, 2013 overdue · Violation #9859477
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued May 6, 2013 · fix by Jun 10, 2013 overdue · Violation #9824109
- BMissing smoke or CO detectorSection 27-2045 adm code repair or replace the smoke detector defective in the entire apartmentIssued May 6, 2013 · fix by Jun 10, 2013 overdue · Violation #9824103
- COther repairsSection 27-2070 adm code provide an adequate supply of gas to the fixtures at range in the kitchenIssued May 6, 2013 · fix by May 14, 2013 overdue · rent impairing · Violation #9824093
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 26, 2013 · fix by Mar 21, 2013 overdue · rent impairing · Violation #9781752
- COther repairsSection 27-2070 adm code provide an adequate supply of gas to the fixtures at the range in the kitchenIssued Mar 26, 2013 · fix by Apr 1, 2013 overdue · rent impairing · Violation #9781751
- COther repairsSection 27-2070 adm code provide an adequate supply of gas to the fixtures , gas range in the kitchenIssued Mar 11, 2013 · fix by Mar 17, 2013 overdue · rent impairing · Violation #9761892
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of expose electrical wires and bx cables at walls and ceiling at bulkhead at public hall,…Issued Dec 3, 2012 · fix by Jan 7, 2013 overdue · Violation #9657648
- CLeaks and water damageSection 27-2026 adm code repair the leaky and/or defective faucets at bathtub in the bathroomIssued Dec 3, 2012 · fix by Dec 9, 2012 overdue · Violation #9657616
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Jun 25, 2012 · fix by Jul 30, 2012 overdue · Violation #9479859
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective hard wood floor in the private hallwayIssued Mar 26, 2012 · fix by Apr 30, 2012 overdue · Violation #9375179
- COther repairsSection 27-2005 adm code properly repair the broken or defective spring balance lower sash window in the kitchenIssued Nov 1, 2011 · fix by Nov 7, 2011 overdue · Violation #9185217
- COther repairsSection 27-2005 adm code properly repair the broken or defective spring balance lower sash window in the bathroomIssued Nov 1, 2011 · fix by Nov 7, 2011 overdue · Violation #9185249
- BOther repairsSection 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchenIssued Nov 1, 2011 · fix by Dec 6, 2011 overdue · Violation #9185259
- BOther repairsSection 27-2026 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroomIssued Jun 7, 2011 · fix by Jul 12, 2011 overdue · rent impairing · Violation #8969212
- BElectrical problemsSection 27-2005 adm code properly repair the broken or defective electrical light fixture at ceiling in the bathroomIssued Jun 7, 2011 · fix by Jul 12, 2011 overdue · Violation #8969165
- BPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Jun 7, 2011 · fix by Jul 12, 2011 overdue · Violation #8969206
- BMoldTrace and repair the source and abate the nuisance consisting of mold on window frame in the bathroomIssued Jan 19, 2011 · fix by Feb 23, 2011 overdue · Violation #8766678
- BPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from east at south wall wall in the 1st…Issued Jan 19, 2011 · fix by Feb 23, 2011 overdue · Violation #8766681
- BPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at eastIssued Jan 19, 2011 · fix by Feb 23, 2011 overdue · Violation #8766677
- BBroken doors or locksSection 27-2005, 2007 adm code arrange and make self-closing the doors at the entrance in the foyerIssued Jan 19, 2011 · fix by Feb 23, 2011 overdue · Violation #8766676
- BOther repairsSection 27-2005 adm code replace with new the broken or defective light fixture at ceiling in the bathroomIssued Dec 6, 2010 · fix by Jan 10, 2011 overdue · Violation #8718827
- CPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Dec 6, 2010 · fix by Dec 12, 2010 overdue · Violation #8718855
- BMissing smoke or CO detectorSection 27-2045 adm code repair or replace the smoke detector defective in the entire apartmentIssued Nov 4, 2010 · fix by Dec 9, 2010 overdue · Violation #8674814
- CPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north at eastIssued Oct 28, 2010 · fix by Nov 3, 2010 overdue · Violation #8655196
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.