Housing violations · Castle Hill-Unionport
1990 Gleason Avenue, Bronx
10472 · 46 apartments · 6 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster4
- Missing smoke or CO detector2
- Broken doors or locks2
- Leaks and water damage1
- Other repairs1
- Mold1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 1 closed · NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18583696
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18583677
- CBroken doors or locksReplace with new the missing upper left glass pane at building entrance door , 1st storyIssued Jan 12, 2026 · fix by Jan 18, 2026 overdue · Violation #18564505
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallwayIssued Nov 3, 2025 · fix by Dec 8, 2025 overdue · Violation #18341649
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 3, 2025 · fix by Nov 17, 2025 overdue · Violation #18341650
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling inside closet at west wall in the private hallwayIssued Nov 3, 2025 · fix by Dec 8, 2025 overdue · Violation #18341648
- BOther repairsRefit upper sash window as to prevent water penetration from exterior in the kitchenIssued Jun 14, 2024 · fix by Jul 19, 2024 overdue · Violation #17044691
- CMoldTrace and repair the source and abate the visible mold condition approx 10 sq. ft. at ceiling, 8 sq. ft. east wall, 6 sq. ft. north wall in the bathroomIssued Apr 27, 2021 · fix by May 23, 2021 overdue · Violation #14311085
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 25, 2021 · fix by Mar 23, 2021 overdue · Violation #14039266
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at westIssued Feb 27, 2019 · fix by Apr 3, 2019 overdue · Violation #12929238
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.