Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford Park

269 East 194 Street, Bronx

10458 · 26 apartments · 5 stories · City Council district 15

By · Updated · Data from NYC HPD

C
26open immediately hazardous violations · 100 per 100 apartments
B29Hazardous, open
A9Non-hazardous, open
!52Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Open in Google Maps ↗

Who owns and manages it

Owning companyEAST 194 STREET HOLDINGS LLC
Landlord (head officer or owner)Alberto Torres

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    14
  2. Lead paint
    13
  3. Mold
    10
  4. Roaches
    6
  5. Peeling paint and plaster
    6
  6. Missing smoke or CO detector
    5
  7. Broken doors or locks
    4
  8. Mice or rats
    3
  9. Leaks and water damage
    1
  10. Plumbing, sinks and toilets
    1
  11. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C80 days
from 35 closed · NYC typical: 87 days
B105 days
from 59 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Other repairsProperly repair with similar material the broken or defective chipped vinyl tiles at floor ( causing trip hazzard) in the kitchenIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19364618
  • B
    Other repairsProperly repair with similar material the broken or defective laminated tiles creating trip hazard in the kitchenIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19318059
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19316150
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at north wall at public hall, 5th storyIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19316154
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at intermedite landing at east wall at public hall stairs, 5th storyIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19316160
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19316151
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19268796
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19268797
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19268798
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19275197
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19268789
  • B
    Other repairsProperly repair or replace the broken or defective lower window sash spring balances in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19268792
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19268790
  • B
    Other repairsProperly repair or replace the broken or defective lower window sash at 1st window from south at west wall in the 2nd room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19268794
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19268795
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 20, 2025 · fix by Nov 13, 2025 overdue · Violation #18315230
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 20, 2025 · fix by Nov 13, 2025 overdue · Violation #18315229
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 20, 2025 · fix by Nov 13, 2025 overdue · Violation #18315228
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 20, 2025 · fix by Nov 13, 2025 overdue · Violation #18315227
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at ceiling in the bathroomIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18150662
  • B
    MoldTrace and repair the source and abate the visible mold condition at east window frame and ceiling in the bathroomIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17855145
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 1, 2025 · fix by May 25, 2025 overdue · Violation #17867209
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 1, 2025 · fix by May 25, 2025 overdue · Violation #17867208
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling and east wall around window frame (less than 10 sq.ft.) in the bathroomIssued Apr 29, 2025 · fix by Jun 3, 2025 overdue · Violation #17865603
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Apr 11, 2025 · fix by May 5, 2025 overdue · Violation #17825000
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 10, 2025 · fix by May 4, 2025 overdue · Violation #17824279
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). inoperable in the entire apartmentIssued Apr 10, 2025 · fix by May 15, 2025 overdue · Violation #17797100
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft at ceiling in the bathroomIssued Apr 3, 2025 · fix by May 8, 2025 overdue · Violation #17808949
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at upper window sash at window at north in the kitchenIssued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17583054
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tile floor covering in the kitchenIssued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17583053
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tile floor covering in the 4th room from north at westIssued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17583058
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tile floor covering in the 4th room from north at eastIssued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17583059
  • B
    Other repairsProperly repair or replace the broken or defective shut-off knob at heating radiator in the 2nd room from northIssued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17583060
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 4, 2024 · fix by Dec 30, 2024 overdue · Violation #17495988
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at floor in the kitchenIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17495983
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Nov 14, 2023 · fix by Dec 19, 2023 overdue · Violation #16383978
  • B
    Broken doors or locksProperly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at east wall at foyer in the…Issued Sep 27, 2023 · fix by Nov 1, 2023 overdue · Violation #16249481
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 27, 2023 · fix by Oct 23, 2023 overdue · Violation #16249475
  • B
    MoldTrace and repair the source and abate the visible mold condition 2 sq. ft. at ceiling in the bathroomIssued Sep 5, 2023 · fix by Oct 10, 2023 overdue · Violation #16210653
  • B
    MoldTrace and repair the source and abate the visible mold condition 2 sq. ft. at east wall in the bathroomIssued Sep 5, 2023 · fix by Oct 10, 2023 overdue · Violation #16210652
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 31, 2023 · fix by Aug 26, 2023 overdue · Violation #16118411
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 17, 2023 · fix by Aug 12, 2023 overdue · Violation #16098263
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16098264
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jul 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16098265
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 6, 2023 · fix by Aug 1, 2023 overdue · Violation #16075575
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 10 sq feet at north 6 sq feet at south walls in the bathroomIssued Apr 20, 2023 · fix by May 25, 2023 overdue · Violation #15930284
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 13, 2023 · fix by Apr 6, 2023 overdue · Violation #15777856
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Mar 13, 2023 · fix by Apr 8, 2023 overdue · Violation #15767062
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 13, 2023 · fix by Apr 6, 2023 overdue · Violation #15777855
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 13, 2023 · fix by Apr 6, 2023 overdue · Violation #15777854
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 10, 2023 · fix by Apr 3, 2023 overdue · Violation #15771669
  • C
    MoldTrace and repair the source and abate the visible mold condition approximately 30 sq ft at ceiling,north and west walls in the bathroomIssued Feb 9, 2023 · fix by Mar 7, 2023 overdue · Violation #15709581
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Dec 5, 2022 · fix by Dec 19, 2022 overdue · Violation #15589592
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Jun 29, 2015 · fix by Aug 3, 2015 overdue · Violation #10760910
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south and north wall in the 1st room from northIssued Jun 29, 2015 · fix by Aug 3, 2015 overdue · Violation #10760911

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

352017
122018
42019
182020
82021
262022
832023
212024
532025
292026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 726 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.