Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Soundview-Clason Point

955 Underhill Avenue, Bronx

10473 · 205 apartments · 21 stories · City Council district 18

By · Updated · Data from NYC HPD

C
9open immediately hazardous violations · 4 per 100 apartments
B17Hazardous, open
A5Non-hazardous, open
!22Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

Open in Google Maps ↗

Who owns and manages it

Owning companyUnderhill Realty LLC
Landlord (head officer or owner)Joel Weiner

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    5
  2. Peeling paint and plaster
    5
  3. Roaches
    4
  4. Other repairs
    4
  5. Leaks and water damage
    3
  6. Missing smoke or CO detector
    3
  7. Mold
    3
  8. Mice or rats
    2
  9. Electrical problems
    1
  10. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C43 days
from 83 closed · NYC typical: 84 days
B102 days
from 80 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at fire door (stair-b) at public hall, 2nd storyIssued Nov 12, 2026 · fix by Nov 26, 2026 · Violation #19367181
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19350310
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 30, 2026 · fix by Nov 25, 2026 · Violation #19333171
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19333168
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19333169
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 30, 2026 · fix by Nov 25, 2026 · Violation #19333170
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19333167
  • B
    Other repairsProperly repair or replace the broken or defective bell and buzzer system from building entrance to intercom panel at east wall in the foyerIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19333172
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door in the basement at boiler roomIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19270144
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling , 1st storyIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19245549
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling , 1st storyIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19245550
  • B
    Electrical problemsProperly repair or replace the broken or defective ceiling electrical light fixture , 1st storyIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19245552
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective defective door at compactor closet at public hall, 9th storyIssued Jul 30, 2026 · fix by Aug 13, 2026 overdue · Violation #19098576
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallwayIssued Jun 6, 2025 · fix by Jul 11, 2025 overdue · Violation #17938529
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the private hallwayIssued Jun 6, 2025 · fix by Jul 11, 2025 overdue · Violation #17938528
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchenIssued Mar 1, 2024 · fix by Apr 5, 2024 overdue · Violation #16710512
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east and north walls in the 1st room from northIssued Mar 1, 2024 · fix by Apr 5, 2024 overdue · Violation #16710511
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Jan 18, 2024 · fix by Feb 22, 2024 overdue · Violation #16599618
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 18, 2024 · fix by Feb 13, 2024 overdue · Violation #16599616
  • B
    MoldTrace and repair the source and abate the visible mold condition at north wall of the closet approx 13 sq ft in the private hallwayIssued Oct 30, 2023 · fix by Dec 4, 2023 overdue · Violation #16343935
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 28, 2022 · fix by Jan 23, 2023 overdue · Violation #15632650
  • C
    MoldTrace and repair the source and abate the visible mold condition at ceiling approx 15 sq,ft in the private hallwayIssued Jul 8, 2019 · fix by Jul 29, 2019 overdue · Violation #13158962
  • C
    MoldTrace and repair the source and abate the visible mold condition at ceiling approx 15 sq,ft in the 1st room from north at eastIssued Jul 8, 2019 · fix by Jul 29, 2019 overdue · Violation #13158961
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Aug 26, 2011 · fix by Sep 30, 2011 overdue · Violation #9076712
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Aug 26, 2011 · fix by Sep 30, 2011 overdue · Violation #9076713
  • B
    Other repairsProperly repair the broken or defective ,bell and return buzzer system in the private hallwayIssued Apr 13, 2009 · fix by May 18, 2009 overdue · Violation #7819713

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

232017
232018
472019
172020
332021
72022
112023
1052024
372025
562026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 423 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.