Housing violations · Eastchester-Edenwald-Baychester
1183 226 Drive, Bronx
10466 · 24 apartments · 3 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint7
- Mold3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 2 closed · NYC typical: 84 days
from 5 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Dec 23, 2024 · fix by Dec 27, 2024 overdue · Violation #17576466
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Dec 23, 2024 · fix by Dec 27, 2024 overdue · Violation #17576467
- CLead paint- certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead…Issued Oct 10, 2024 · fix by Nov 3, 2024 overdue · Violation #17340016
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft. at all walls and the ceiling in the bathroomIssued Oct 9, 2024 · fix by Nov 4, 2024 overdue · Violation #17328769
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft. at the ceiling in the 3rd room from north at eastIssued Oct 9, 2024 · fix by Nov 4, 2024 overdue · Violation #17328777
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 9, 2024 · fix by Nov 2, 2024 overdue · Violation #17339194
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 9, 2024 · fix by Nov 2, 2024 overdue · Violation #17339195
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft. at the ceiling in the 1st room from north at eastIssued Oct 9, 2024 · fix by Nov 4, 2024 overdue · Violation #17328768
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 9, 2024 · fix by Nov 2, 2024 overdue · Violation #17338978
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 9, 2024 · fix by Nov 2, 2024 overdue · Violation #17339197
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.