Housing violations · Eastchester-Edenwald-Baychester
1160 229 Drive South, Bronx
10466 · 110 apartments · 14 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint9
- Broken doors or locks6
- Other repairs5
- Peeling paint and plaster4
- Roaches3
- Leaks and water damage1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 17 closed · NYC typical: 87 days
from 14 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st storyIssued Mar 30, 2026 · fix by Apr 13, 2026 overdue · Violation #18754239
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18704601
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18704600
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 12, 2026 · fix by Apr 7, 2026 overdue · Violation #18704598
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Mar 12, 2026 · fix by Mar 18, 2026 overdue · Violation #18704596
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 12, 2026 · fix by Apr 7, 2026 overdue · Violation #18704594
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at east wall at public hall, 2nd storyIssued May 12, 2025 · fix by Jun 16, 2025 overdue · Violation #17886237
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the 2nd room from northIssued Oct 3, 2024 · fix by Nov 7, 2024 overdue · Violation #17312654
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 3, 2024 · fix by Oct 27, 2024 overdue · Violation #17324491
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 3, 2024 · fix by Oct 27, 2024 overdue · Violation #17324490
- BOther repairsProperly repair or replace the broken or defective ventilation system at east wall in the kitchenIssued Sep 30, 2024 · fix by Nov 4, 2024 overdue · Violation #17310041
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Sep 18, 2024 · fix by Oct 23, 2024 overdue · Violation #17277249
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 17, 2024 · fix by Oct 11, 2024 overdue · Violation #17284853
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 17, 2024 · fix by Oct 11, 2024 overdue · Violation #17284850
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at west wall in the bathroomIssued Sep 17, 2024 · fix by Oct 22, 2024 overdue · Violation #17277255
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 17, 2024 · fix by Oct 13, 2024 overdue · Violation #17277256
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entranceIssued Sep 17, 2024 · fix by Oct 1, 2024 overdue · Violation #17277257
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 17, 2024 · fix by Oct 11, 2024 overdue · Violation #17284851
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 17, 2024 · fix by Oct 11, 2024 overdue · Violation #17284852
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 17, 2024 · fix by Oct 11, 2024 overdue · Violation #17284854
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 17, 2024 · fix by Oct 11, 2024 overdue · Violation #17284855
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st storyIssued Sep 13, 2024 · fix by Sep 27, 2024 overdue · Violation #17271047
- CBroken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door , 1st storyIssued Sep 4, 2024 · fix by Sep 10, 2024 overdue · Violation #17248063
- CBroken doors or locksProperly repair or replace the broken or defective electromagnetic lock at building entrance door , 1st storyIssued Sep 4, 2024 · fix by Sep 10, 2024 overdue · Violation #17248057
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 20, 2024 · fix by Sep 15, 2024 overdue · Violation #17200780
- CLead paintReplace or repair the self-closing doors that is missing or defective the court entrance door leading to public hall , 1st storyIssued Aug 19, 2024 · fix by Sep 2, 2024 overdue · Violation #17198906
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.