Housing violations · East Flatbush-Farragut
1412 Brooklyn Avenue, Brooklyn
11210 · 42 apartments · 6 stories · City Council district 45
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs9
- Lead paint6
- Broken doors or locks5
- Peeling paint and plaster5
- Roaches2
- Plumbing, sinks and toilets2
- Leaks and water damage2
- Mice or rats1
- Mold1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 33 closed · NYC typical: 87 days
from 29 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from north at eastIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19351305
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at apartment entrance door in the entranceIssued Nov 5, 2026 · fix by Nov 19, 2026 · Violation #19351309
- BOther repairsReplace with new the missing base cabinet draw at west wall in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351294
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19351288
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19351289
- BOther repairsAbate the nuisance consisting of pests. evidence of spiders in the entire apartmentIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351291
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351292
- BBroken doors or locksProperly repair or replace the broken or defective sash lock at window at north wall in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351293
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash in the 1st room from north at westIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351295
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351297
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351298
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulk around at bathtub in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351299
- BOther repairsReplace with new the missing escutcheon plate at top and bottom riser pipe in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351302
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351303
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351304
- BBroken doors or locksProperly repair or replace the broken or defective sash lock at 1st and 2nd window at east wall in the 2nd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351306
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the 2nd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351307
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351308
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from north at westIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19351296
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193888
- BOther repairsProperly repair or replace the broken or defective glass pane lower sash 1st window from south at west wall in the 4th room from east at northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193891
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193889
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 21, 2023 · fix by Jan 25, 2024 overdue · Violation #16538547
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 21, 2023 · fix by Jan 25, 2024 overdue · Violation #16538543
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 21, 2023 · fix by Jan 25, 2024 overdue · Violation #16538544
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 21, 2023 · fix by Jan 25, 2024 overdue · Violation #16538548
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Dec 13, 2023 · fix by Dec 17, 2023 overdue · Violation #16523075
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Dec 13, 2023 · fix by Dec 17, 2023 overdue · Violation #16523074
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 22, 2021 · fix by Mar 20, 2021 overdue · Violation #14032453
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.