Housing violations · Brooklyn Heights
20 Columbia Place, Brooklyn
11201 · 34 apartments · 6 stories · City Council district 33
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs3
- Peeling paint and plaster3
- Plumbing, sinks and toilets2
- Leaks and water damage1
- Roaches1
- Electrical problems1
- Broken doors or locks1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 8 closed · NYC typical: 87 days
from 6 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective wooden floor in the kitchenIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19137396
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation at east wall in the bathroomIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19137397
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19137398
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at east wall bathtub in the bathroomIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19137400
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroomIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19137401
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroomIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19137402
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from eastIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19137399
- BOther repairsProperly repair or replace the broken or defective ventilation shaft in the bathroomIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19093833
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 28, 2026 · fix by Aug 23, 2026 overdue · Violation #19093836
- CBroken doors or locksProperly repair the broken or defective locking device at door at public hall, 4th story, section at southIssued Apr 16, 2025 · fix by Apr 22, 2025 overdue · Violation #10126280
- CMice or ratsAbate the infestation consisting of mice in the kitchenIssued May 1, 2019 · fix by May 22, 2019 overdue · Violation #13043285
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.