Housing violations · Bedford-Stuyvesant (West)
529a Gates Avenue, Brooklyn
11216 · 4 apartments · 4 stories · City Council district 36
By Mantie Reid II · Updated · Data from NYC HPD
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs19
- Peeling paint and plaster13
- Broken doors or locks9
- Missing smoke or CO detector6
- Plumbing, sinks and toilets4
- Leaks and water damage3
- Mice or rats2
- No heat or hot water2
- Bedbugs1
- Mold1
- Roaches1
- Missing window guards1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 2 closed · NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 24, 2025 · fix by Oct 29, 2025 overdue · Violation #18242414
- BOther repairsReplace with new the missing escutheon plate at top of heat riser pipe in the bathroomIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · Violation #18242413
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · Violation #18242412
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · Violation #18242419
- BOther repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · rent impairing · Violation #18242410
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 24, 2025 · fix by Oct 29, 2025 overdue · Violation #18242415
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17260157
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at south wall in the bathroomIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17260156
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall and east wall in the 4th room from north at westIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17260153
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at north wall in the kitchenIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17260152
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17260158
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sq feet at west wall in the 1st room from north at westIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17260159
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17260149
- BBroken doors or locksProperly repair with similar material the broken or defective wood door at entrance in the 1st room from north at eastIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17260150
- BBroken doors or locksProperly secure the loose hinges at entrance door in the 1st room from north at eastIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17260151
- BPlumbing, sinks and toiletsProperly secure the loose wash basin cabinet at south wall in the bathroomIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17260154
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 11, 2024 · fix by Oct 7, 2024 overdue · Violation #17260155
- BBroken doors or locksRefit 1st door from east at south wall in the 1st room from north at eastIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17216247
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at west wall at public hall, 1st storyIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17216246
- BPlumbing, sinks and toiletsProperly secure the loose washbasin to south wall in the bathroomIssued Sep 11, 2023 · fix by Oct 16, 2023 overdue · Violation #16183925
- BOther repairsReplace the broken or defective watercloset tank cover in the bathroomIssued Sep 11, 2023 · fix by Oct 16, 2023 overdue · rent impairing · Violation #16183926
- BPlumbing, sinks and toiletsRepair the broken or defective connection at washbasin wasteline in the bathroomIssued Sep 11, 2023 · fix by Oct 16, 2023 overdue · Violation #16183924
- BOther repairsProperly repair or replace the broken or defective escutcheon plate at riser in the bathroomIssued Sep 11, 2023 · fix by Oct 16, 2023 overdue · Violation #16183927
- BBroken doors or locksReplace with new the missing entrance door in the 4th room from north at westIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183932
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the 1st room from north at eastIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · rent impairing · Violation #16183921
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 28, 2023 · fix by Sep 23, 2023 overdue · Violation #16183917
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · rent impairing · Violation #16183918
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tile in the 4th room from north at eastIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183919
- BOther repairsProperly repair or replace the broken or defective bell and buzzer return intercom system from building entrance in the foyerIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183920
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183922
- BBroken doors or locksProperly repair or replace the broken or defective doors at cabinet above sink in the kitchenIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183923
- BPlumbing, sinks and toiletsRepair the broken or defective connection at sink wasteline in the kitchenIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183928
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 28, 2023 · fix by Sep 23, 2023 overdue · Violation #16183929
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 4th room from north at westIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183933
- BOther repairsProperly repair or replace the broken or defective lower sash window pane on south wall window in the 4th room from north at eastIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183934
- BBroken doors or locksReplace with new the missing entrance door in the 1st room from north at westIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16183935
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the vestibule at public hall, 1st storyIssued Aug 24, 2023 · fix by Sep 28, 2023 overdue · Violation #16187331
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at the west wall in the vestibule at public hall, 1st storyIssued Aug 24, 2023 · fix by Sep 28, 2023 overdue · Violation #16187335
- BOther repairsProperly repair or replace the broken or defective intercom system from entrance to the building to intercom system to east wall in the foyerIssued Aug 24, 2023 · fix by Sep 28, 2023 overdue · Violation #16187301
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak and or water penetration at the north wall in the 1st room from north at eastIssued Aug 24, 2023 · fix by Sep 28, 2023 overdue · Violation #16187312
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north wall in the 1st room from north at eastIssued May 19, 2023 · fix by May 25, 2023 overdue · Violation #15984084
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall in the 1st room from north at eastIssued May 19, 2023 · fix by Jun 23, 2023 overdue · Violation #15984085
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 26, 2022 · fix by Sep 21, 2022 overdue · Violation #15324598
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st storyIssued Aug 25, 2022 · fix by Sep 29, 2022 overdue · Violation #15324379
- BOther repairsProperly repair the broken or defective councounter balance window lower sash in the 1st room from north at westIssued Aug 25, 2022 · fix by Sep 29, 2022 overdue · Violation #15324599
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from north at eastIssued Aug 10, 2020 · fix by Aug 16, 2020 overdue · Violation #13756424
- BBroken doors or locksProperly repair the broken or defective return buzzer system from street building entrance door first story to box in the foyerIssued Aug 10, 2020 · fix by Sep 14, 2020 overdue · Violation #13756392
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water, 160 degrees, exceeding maximum temperature of 130 degreesIssued Nov 24, 2014 · fix by Dec 2, 2014 overdue · Violation #10451152
- BMissing smoke or CO detectorRepair or replace the smoke detector , defectiveIssued Nov 21, 2014 · fix by Dec 26, 2014 overdue · Violation #10451215
- BMissing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rulesIssued Nov 21, 2014 · fix by Dec 26, 2014 overdue · Violation #10451205
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 24, 2009 · fix by Mar 2, 2009 overdue · rent impairing · Violation #7735678
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 4th room from north at westIssued Feb 20, 2008 · fix by Mar 26, 2008 overdue · Violation #7152284
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 4th room from north at eastIssued Feb 20, 2008 · fix by Mar 26, 2008 overdue · Violation #7152280
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.