Housing violations · Bedford-Stuyvesant (East)
988 Greene Avenue, Brooklyn
11221 · 20 apartments · 4 stories · City Council district 36
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
27 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster91
- Other repairs85
- Leaks and water damage40
- Broken doors or locks36
- Missing smoke or CO detector33
- Mice or rats18
- Mold18
- Roaches13
- No heat or hot water9
- Plumbing, sinks and toilets9
- Lead paint7
- Electrical problems7
- Missing window guards4
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 28 closed · NYC typical: 84 days
from 15 closed · NYC typical: 110 days
This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CLeaks and water damageRepair the roof so that it will not leak at the ceiling at public hall, 4th storyIssued Nov 12, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19376594
- BPeeling paint and plasterProperly repair with similar material the broken or defective plaster with fire rated material at the east wall. at public hall stairs, 1st storyIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376591
- CPeeling paint and plasterProperly repair with similar material the broken or defective plaster with fire rated material at the ceiling and west wall. at public hall, 4th storyIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376595
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 22, 2026 · fix by Oct 22, 2026 overdue · rent impairing · Violation #19323411
- BLead paintProperly secure the loose wooden hand rail leading to 2nd story at public hall stairs, 1st storyIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19234764
- COther repairsProperly repair with similar material the broken or defective concrete landing between 1st and 2nd story public hall stairs at public hall stairs, 1st storyIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19234759
- COther repairsProperly repair with similar material the broken or defective fire rated material at ceiling and west wall at public hall, 3rd storyIssued Aug 6, 2026 · fix by Aug 12, 2026 overdue · Violation #19123880
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city…Issued Aug 6, 2026 · fix by Sep 1, 2026 overdue · Violation #19123836
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling at cellarIssued Aug 6, 2026 · fix by Aug 12, 2026 overdue · Violation #19123865
- COther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the accumulation of garbage at cellarIssued Aug 6, 2026 · fix by Aug 12, 2026 overdue · Violation #19123825
- CLead paintProperly repair and abate unsafe electric wiring condition consisting of illegal extension cord running from cellar at east exterior wall leading to roofIssued Aug 6, 2026 · fix by Aug 12, 2026 overdue · Violation #19123905
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19123843
- COther repairsProperly repair or replace the broken or defective noising of the stair tread at intermediate landing at public hall stairs, 1st storyIssued May 26, 2026 · fix by Jun 1, 2026 overdue · Violation #18954670
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Apr 27, 2026 · fix by May 3, 2026 overdue · Violation #18821375
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Apr 22, 2026 · fix by Apr 22, 2026 overdue · rent impairing · Violation #18813270
- CBroken doors or locksProvide ready access to buildings heating system locked at boiler roomIssued Apr 22, 2026 · fix by Apr 28, 2026 overdue · Violation #18813273
- BOther repairsProvide adequate lighting at ceiling in the vestibule at public hall, 1st storyIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18650810
- COther repairsProperly repair or replace the broken or defective air release valve at radiator at west wall in the 1st room from northIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18637513
- COther repairsProperly repair or replace the broken or defective air release valve at radiator at north wall in the 3rd room from north at westIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18637515
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 11, 2026 · fix by Mar 9, 2026 overdue · Violation #18637524
- BOther repairsProperly repair or replace the broken or defective ventilation system at south wall in the bathroomIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18637517
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18637510
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 11, 2026 · fix by Mar 9, 2026 overdue · Violation #18637523
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18637506
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18637522
- COther repairsProperly repair with similar material the broken or defective subflooring wood in the kitchenIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18637520
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18637521
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling at vestibule at public hall, 1st storyIssued Feb 4, 2026 · fix by Feb 10, 2026 overdue · Violation #18618014
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling light at public hall, 1st storyIssued Feb 4, 2026 · fix by Feb 10, 2026 overdue · Violation #18618013
- CPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line drain pipe clogged at bathtub in the bathroomIssued Jan 30, 2026 · fix by Feb 5, 2026 overdue · rent impairing · Violation #18610140
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jan 30, 2026 · fix by Feb 5, 2026 overdue · Violation #18610144
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at window frame at north wall in the 1st room from northIssued Jan 7, 2026 · fix by Jan 13, 2026 overdue · Violation #18556621
- CLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jan 7, 2026 · fix by Jan 13, 2026 overdue · Violation #18556600
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at window frame at south wall in the 1st room from northIssued Jan 7, 2026 · fix by Jan 13, 2026 overdue · Violation #18556601
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from northIssued Jan 7, 2026 · fix by Jan 13, 2026 overdue · Violation #18556602
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 7, 2026 · fix by Feb 11, 2026 overdue · Violation #18556614
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 7, 2026 · fix by Feb 11, 2026 overdue · Violation #18556615
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 7, 2026 · fix by Feb 2, 2026 overdue · Violation #18556616
- COther repairsProperly repair with similar material the broken or defective concrete at intermediate landing between 1st and 2nd stories at public hall, 1st storyIssued Jan 7, 2026 · fix by Jan 13, 2026 overdue · Violation #18556658
- COther repairsProperly secure the loose 1st window gate from south at west wall at east yard, 1st storyIssued Jan 7, 2026 · fix by Jan 13, 2026 overdue · Violation #18556660
- COther repairsProperly repair or replace the broken or defective cold radiator at south wall in the 2nd room from northIssued Jan 7, 2026 · fix by Jan 13, 2026 overdue · Violation #18556611
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling at west yard at fire passage wayIssued Jan 7, 2026 · fix by Jan 13, 2026 overdue · Violation #18556662
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jan 7, 2026 · fix by Jan 13, 2026 overdue · Violation #18556598
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 7, 2026 · fix by Feb 2, 2026 overdue · Violation #18556617
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of overgrown vegestation blocking egress from drop ladder yard, section ''rear''Issued Oct 27, 2025 · fix by Nov 2, 2025 overdue · Violation #18330074
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the at west yard courtIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18060695
- BOther repairs& 309 m/d law abate the nuisance consisting of tree obstructing at backyard at fire escapeIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18060696
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued May 5, 2025 · fix by Jun 9, 2025 overdue · Violation #17868257
- BOther repairsProperly repair or replace the broken or defective intercom system at the east wall in the foyerIssued May 5, 2025 · fix by Jun 9, 2025 overdue · Violation #17868259
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Apr 24, 2025 · fix by May 29, 2025 overdue · Violation #17846777
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Mar 10, 2025 · fix by Mar 8, 2025 overdue · rent impairing · Violation #17752378
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Mar 10, 2025 · fix by Mar 16, 2025 overdue · Violation #17752379
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Feb 7, 2025 · fix by Feb 13, 2025 overdue · Violation #17684091
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 7, 2025 · fix by Feb 7, 2025 overdue · rent impairing · Violation #17684087
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Feb 4, 2025 · fix by Mar 11, 2025 overdue · Violation #17669805
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline at sink in the kitchenIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17647230
- BBroken doors or locksProperly repair or replace the broken or defective door in the bulkhead at public hall stairs, 4th storyIssued Jan 30, 2025 · fix by Mar 6, 2025 overdue · Violation #17647238
- BOther repairsProvide adequate lighting for fixtures at ceiling at public hall, 3rd storyIssued Jan 30, 2025 · fix by Mar 6, 2025 overdue · rent impairing · Violation #17647243
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jan 30, 2025 · fix by Mar 6, 2025 overdue · Violation #17647203
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jan 30, 2025 · fix by Mar 6, 2025 overdue · Violation #17647207
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.