Housing violations · Prospect Lefferts Gardens-Wingate
416 Hawthorne Street, Brooklyn
11203 · 20 apartments · 2 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
10 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster24
- Other repairs14
- Mice or rats13
- Broken doors or locks13
- Lead paint10
- Leaks and water damage8
- Missing smoke or CO detector6
- Plumbing, sinks and toilets6
- Mold5
- Roaches2
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 14 closed · NYC typical: 87 days
from 10 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19285287
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19261939
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline at sink in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19238172
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19238173
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19261937
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19261938
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19238178
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 28, 2026 · fix by Oct 22, 2026 overdue · Violation #19255146
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Sep 28, 2026 · fix by Oct 22, 2026 overdue · Violation #19255145
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 28, 2026 · fix by Oct 22, 2026 overdue · Violation #19255144
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Sep 28, 2026 · fix by Oct 22, 2026 overdue · Violation #19255143
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 28, 2026 · fix by Oct 22, 2026 overdue · Violation #19255142
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19245294
- BPeeling paint and plasterProperly repair with similar material the broken or defective fir e retardant material plaster at ceiling at bulkhead at public hall, 2nd storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19245295
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling at bulkhead at public hall, 2nd storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19245296
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 28, 2026 · fix by Oct 22, 2026 overdue · Violation #19255141
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Sep 28, 2026 · fix by Oct 22, 2026 overdue · Violation #19255140
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 28, 2026 · fix by Oct 22, 2026 overdue · Violation #19255139
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 28, 2026 · fix by Oct 22, 2026 overdue · Violation #19255138
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 28, 2026 · fix by Oct 22, 2026 overdue · Violation #19255137
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19238179
- COther repairs& 309 m/d law abate the nuisance consisting of exposed nails at brick wall adjacent to entrance , 1st story, bilding frontIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19245292
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19245291
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19238175
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Sep 28, 2026 · fix by Oct 12, 2026 overdue · Violation #19245289
- BBroken doors or locksProperly repair or replace the broken or defective door frame in the entranceIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19245290
- BOther repairsProperly repair with similar material the broken or defective cracked ceramic tile at north wall in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19245288
- BBroken doors or locksProperly repair with similar material the broken or defective craked wood door saddle in the entrance in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19245287
- BBroken doors or locksProperly repair or replace the broken or defective gaskets at refrigerator doors in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19245285
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19245284
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19245283
- BOther repairsProperly repair or replace the broken or defective radiator shut off valve at south wall in the 2nd room from north at westIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19245282
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink counter top at north wall in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19245281
- BBroken doors or locksProperly repair or replace the broken or defective the doors at wall and base cabinets at south and north walls in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19245280
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 28, 2026 · fix by Oct 24, 2026 overdue · rent impairing · Violation #19238180
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19238177
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19238176
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19238174
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 28, 2026 · fix by Oct 24, 2026 overdue · rent impairing · Violation #19238171
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19238170
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19238169
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19238168
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19238167
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19238166
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling at public hall stairs, 2nd storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189913
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall stairs, 2nd storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189915
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective kitchen sink faucet in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189912
- BBroken doors or locksProperly repair or replace the broken or defective lower refrigator door gasket in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189911
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall stairs, 2nd storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19189914
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at the ceiling in the kitchenIssued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18671057
- BOther repairsRemove all encumbrances consisting of bicycles at public hall, 2nd storyIssued Jan 8, 2026 · fix by Feb 12, 2026 overdue · rent impairing · Violation #18550986
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 27, 2025 · fix by Nov 22, 2025 overdue · Violation #18318718
- BOther repairsProperly repair with similar material the broken or defective caulking around the bath tub in the bathroomIssued Oct 27, 2025 · fix by Dec 1, 2025 overdue · Violation #18318714
- BLeaks and water damageRepair the roof so that it will not leak at the ceiling in the kitchenIssued Oct 27, 2025 · fix by Dec 1, 2025 overdue · rent impairing · Violation #18318715
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the kitchenIssued Oct 27, 2025 · fix by Dec 1, 2025 overdue · Violation #18318716
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Oct 21, 2025 · fix by Oct 27, 2025 overdue · Violation #18304995
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 21, 2025 · fix by Oct 21, 2025 overdue · rent impairing · Violation #18311949
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Oct 21, 2025 · fix by Oct 27, 2025 overdue · Violation #18311950
- BOther repairsProperly repair or replace the broken or defective counter balance upper sash at window at south in the kitchenIssued Oct 21, 2025 · fix by Nov 25, 2025 overdue · Violation #18311951
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the kitchenIssued Oct 21, 2025 · fix by Nov 25, 2025 overdue · rent impairing · Violation #18304996
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.