Housing violations · East Flatbush-Farragut
1413 New York Avenue, Brooklyn
11210 · 42 apartments · 6 stories · City Council district 45
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs10
- Peeling paint and plaster7
- Leaks and water damage4
- Roaches4
- Lead paint4
- Broken doors or locks3
- Mice or rats2
- Electrical problems1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 44 closed · NYC typical: 87 days
from 48 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CLeaks and water damageRepair the roof so that it will not leak over the ceiling at , roof bulkhead , at public hall, 6th storyIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19346893
- CPeeling paint and plasterProperly repair with similar material the broken or defective cracked fire retardant materials, plaster at ceiling and north wall at roof bulkhead at public…Issued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19346892
- BOther repairsReplace with new the missing balusters at, gurdails to entrance stair , building 's front yardIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346894
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 27, 2026 · fix by Sep 22, 2026 overdue · Violation #19167813
- COther repairsProperly repair or replace the broken or defective broken lower window sash inner glass pane at south wall in the kitchenIssued Aug 27, 2026 · fix by Sep 2, 2026 overdue · Violation #19167812
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 27, 2026 · fix by Sep 22, 2026 overdue · Violation #19167810
- BOther repairsProperly repair or replace the broken or defective upper and lower window sash spring balance at south wall in the bathroomIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19167819
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 27, 2026 · fix by Sep 22, 2026 overdue · Violation #19167811
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19173729
- BOther repairsProperly repair or replace the broken or defective upper window sash spring balance 2nd window from east at south wall in the 3rd room from eastIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19167818
- BOther repairsProperly repair or replace the broken or defective lower window sash spring balance at south wall in the kitchenIssued Aug 27, 2026 · fix by Oct 1, 2026 overdue · Violation #19167817
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchenIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19128672
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19128674
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallwayIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19128675
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash at south wall in the kitchenIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19128673
- BOther repairsProperly repair or replace the broken or defective intercom system from building front entrance to wall panel at east wall in the 1st room from northIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19128676
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 2nd room from east at southIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745411
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745413
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745414
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18748110
- BElectrical problemsProperly repair or replace the broken or defective outlet at north wall in the kitchenIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745412
- BOther repairsProperly repair or replace the broken or defective shut off valve at radiator at south wall in the 2nd room from east at southIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18745415
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 3rd room from eastIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18748106
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at bathtub wasteline in the bathroomIssued Mar 30, 2026 · fix by May 4, 2026 overdue · rent impairing · Violation #18748108
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of security lockset operated by key installed at entrance room door, ( egress) in the 3rd room from east at southIssued Feb 6, 2025 · fix by Feb 12, 2025 overdue · Violation #17672624
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 31, 2022 · fix by Jun 24, 2022 overdue · Violation #15189982
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 31, 2022 · fix by Jun 24, 2022 overdue · Violation #15189984
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 31, 2022 · fix by Jun 24, 2022 overdue · Violation #15189987
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 31, 2022 · fix by Jun 24, 2022 overdue · Violation #15189988
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 11, 2020 · fix by Jan 6, 2021 overdue · Violation #13932569
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 11, 2020 · fix by Jan 6, 2021 overdue · Violation #13932570
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 15, 2019 · fix by May 6, 2019 overdue · Violation #13014306
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.